HousePrecheckCheck an address

40 Caven StToronto · zoning, lot size and permit records

Also 29 Zorra St

66.2 × 105.7 m6,657 m²on Carolina Rose Htscorner, also on Caven St

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • 5 development applications open within 300 m, up to 42 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
N50 m
66.2 m frontage105.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 5 development applications open within 300 m

    Good to know

    5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 42 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

8 records on file: more than at 98% of Toronto houses (median 0).

  • By-law investigation25 136108 WST 00 IRClosed

    Waste

    Mar 28, 2025 · 29 ZORRA ST
  • Building permit18 147460Closed

    Proposal to construct a "Shade Structure" Canopy in existing park.

    Jul 3, 2018 · 29 ZORRA ST
  • Building permit13 173336Closeddemolition

    Proposal to demolish an existing (1) storey auto repair garage. Proposed use of land will be vacant. FILE WITH OBC EXAMINER JOSEPH WASSEF-AUG 8, 20913

    Aug 9, 2013 · 29 ZORRA ST
  • Building permit06 187538Closed

    Installation of new plumbing fixtures, new sanitary piping, and new interceptor in an existing repair garage.

    Nov 20, 2006 · 29 ZORRA ST
  • Zoning review06 125428 LTOClosed
    Apr 12, 2006 · 29 ZORRA ST
  • Zoning review06 108866 LTOClosed
    Feb 10, 2006 · 29 ZORRA ST
  • Zoning review03 175756 ZPUClosed
    Sep 17, 2003 · 29 ZORRA ST
  • Zoning review02 189630 LTOClosed
    Nov 18, 2002 · 29 ZORRA ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
6,657 m²
Frontage
66.2 m
Depth
105.7 m
Street
Carolina Rose Hts
Corner lot
Yes, also on Caven St105.7 m along it
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    100%11 of 11 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    18

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 11 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To legalize and to maintain the existing temporary sales office.

      1045 THE QUEENSWAY · Oct 8, 2026 · 297 m away
    • Minor varianceApproved

      To permit an automobile dealership to continue to operate within the existing building. A previous Committee of Adjustment application (A0770/16EYK) approved an automobile dealership to operate for a period of 10 years.

      1285 THE QUEENSWAY · Sep 24, 2026 · 392 m away
    • Minor varianceApproved

      To construct a new detached garage in the rear yard.

      39 TRUEMAN AVE · Sep 24, 2026 · 470 m away
    • Minor varianceRefused

      To permit an Amusement Arcade within a portion of the existing building.

      360 EVANS AVE · Jul 30, 2026 · 439 m away
    • Minor varianceApproved

      To construct a new detached dwelling with an attached garage.

      17 CULNAN AVE · Apr 23, 2026 · 349 m away

    Latest activity nearby

    • Building permit

      Proposed installation of geothermal boreholes, geothermal field and trenching, and geothermal mechanical system for the proposed 169-unit purpose-built rental residential building.

      1230 THE QUEENSWAY · Nov 25, 2026 · 275 m away
    • Building permitnew building

      Proposal to construct a 13 storey mixed use residential. Proposal to include 169 residential units, three levels of underground parking and ground floor commercial use

      1230 THE QUEENSWAY · Nov 6, 2026 · 275 m away
    • Building permitdemolition

      Proposed demolition of the one-storey vacant bank branch to begin site preparation for the proposed purpose-built residential rental development. The site is clean with a Record of Site Condition from the MECP. Proposed demolition start is mid-November 2026. Also wanted to request to remove a tree

      1230 THE QUEENSWAY · Nov 2, 2026 · 275 m away
    • Building permitsecondary suite

      Proposal for second suite in basement.

      20 WOOLGAR AVE · Oct 26, 2026 · 300 m away
    • Minor varianceApproved

      To legalize and to maintain the existing temporary sales office.

      1045 THE QUEENSWAY · Oct 8, 2026 · 297 m away
    • Building permitsecondary suite

      Basement Suite

      20 WOOLGAR AVE · Oct 7, 2026 · 300 m away
    • Zoning review

      Closed

      14 BRAWLEY AVE · Aug 11, 2026 · 278 m away
    • Zoning review

      Closed

      1178 THE QUEENSWAY · Jul 20, 2026 · 177 m away
    • Zoning review

      Notice Sent

      1230 THE QUEENSWAY · Jul 15, 2026 · 275 m away
    • Zoning review

      Closed

      1178 THE QUEENSWAY · Jun 23, 2026 · 177 m away

    Neighbourhood: Etobicoke City Centre

    About the area around the lot, not the lot itself.

    Nearest station
    Mimico GO Station30 min walk
    Nearest TTC stop
    The Queensway at Zorra St2 min walk
    Nearest traffic count
    17,377 vehicles in 8 hThe Queensway / Zorra St, 160 m away, Jun 7, 2016
    Serious collisions within 500 m
    62021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
    Parks
    Senator Marian Maloney Park1 min walk
    Zorra Park1 min walk
    Queensland Park9 min walk

    Schools within 1 km

    • HOLY ANGELS CATHOLIC ELEMENTARY English Separate 14 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureEtobicoke City CentreMedian neighbourhood
    Median household income (2020)$83,000$84,500
    Households that own their home50%54%
    Population (2021)23,60016,813
    Homes built in 1960 or before9%29%
    Homes needing major repairs4%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleEtobicoke City CentreCity median
    Assault844.4636.3
    Robbery187.769.5
    Shootings16.210.5
    Auto theft601.8192.6
    Theft over $5,000200.646.1
    Break and enter210.3172.8
    Theft from vehicles278.2188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.