Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Work or applications in progress
Good to knowRecent records on this lot: 23 139212 NNY 16 SA (2023); 21 223797 NNY 16 SB (Zoning By-law Amendment and Draft Plan of Subdivision applications to permit four resid..., 2021); 21 223792 NNY 16 OZ (Zoning By-law Amendment and Draft Plan of Subdivision applications to permit four resid..., 2021).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications3 development applications open within 300 m
Good to know3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 29 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development ApplicationsRental building evaluation: 88 out of 100
Good to knowThe City's RentSafeTO program evaluated this rental building in 2025 (4 storeys, 40 units, built 1950).
What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.
How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details
City of Toronto, RentSafeTO Apartment Building Evaluations
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
6 records on file: more than at 95% of Toronto houses (median 0).
- Development application23 139212 NNY 16 SAUnder ReviewApr 28, 2023 · 4 THE DONWAY E · City file
- Development application21 223797 NNY 16 SBUnder Review
Zoning By-law Amendment and Draft Plan of Subdivision applications to permit four residential buildings ranging in height from 12 to 29 storeys. The proposal also includes a new public park and a new public street.
Oct 8, 2021 · 4 THE DONWAY E · City file - Development application21 223792 NNY 16 OZOMB Appeal
Zoning By-law Amendment and Draft Plan of Subdivision applications to permit four residential buildings ranging in height from 12 to 29 storeys. The proposal also includes a new public park and a new public street.
Oct 8, 2021 · 4 R THE DONWAY E · City file - Building permit14 240286Closed
Fire alarm audibility upgrade
Nov 13, 2014 · 4 THE DONWAY E - Building permit14 175350Closed
To install a backflow prevention device.
Jul 4, 2014 · 4 THE DONWAY E - Building permit12 180797Closed
Berkley property management Balcony/Guard Repairs to 18 balcony repairs
May 31, 2012 · 4 THE DONWAY E
Lot facts
- Area
- 4,642 m²
- Frontage
- 78.3 mestimated, irregular lot
- Depth
- 82.2 mestimated, irregular lot
- Street
- Moccasin Trl
- Corner lot
- Yes, also on The Donway E82.2 m along it
- Public lane
- None
- House footprint
- 1,045 m²roof up to 20 m
- Back yard
- 3.4 mhouse to rear lot line
- Side yards
- 20.6 m and 29.2 mhouse to side lot lines
- Buildings on the lot
- 2house, garage, sheds
- Max height
- —
- Max lot coverage
- 35%
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Central Don Mills Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Minimum frontage 21 m. Frontage is about 78.3 m (estimated, irregular lot): meets the zone minimum. Source
- Minimum lot area 835 m². Lot area is 4,642 m²: meets the minimum. Source
- Zone RM (f21.0; a835; d1.0) (Residential Multiple Dwelling). Chapter 10, section 10.80 of the by-law. Source
- 5 City trees in front of this lot. The City's street tree inventory lists 5 trees at this address: oak, english (28 cm), oak, english (18 cm), elm (10 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 100%8 of 8 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 5
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 8 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To increase the maximum permitted height and number of storeys and reduce the required number of vehicular parking spaces.
1030 DON MILLS RD · Mar 20, 2025 · 222 m away - Minor varianceApproved
To construct a one storey rear addition and a second floor addition.
22 FOXDEN RD · Jul 8, 2021 · 481 m away - Minor varianceApproved
To facilitate in the development of two residential towers with at-grade retail uses and a shared parking garage. Please note, this application was previously deferred Thursday, September 26, 2019, in order to allow proper notification to be provided to the Public.
1090 DON MILLS RD · Oct 23, 2019 · 463 m away - Minor varianceApproved
To alter the existing dwelling by constructing an attached garage and a storage room addition.
45 MOCCASIN TRL · Sep 27, 2018 · 383 m away - Minor varianceApproved
To construct two 11-storey towers connected by a 4-storey podium with 296 residential units and 1 retail unit.
99 THE DONWAY W · Feb 5, 2014 · 476 m away
Latest activity nearby
- Building permit
Back water valve installation
20 MOCCASIN TRL · Sep 29, 2026 · 212 m away - Building permit
Proposal for an addition on the front and rear of existing bungalow and interior alterations,
4 NORTH HILLS TER · Jun 2, 2026 · 247 m away - Building permit
Proposed interior alterations to finish basement. A front ground floor addition is also proposed.
15 GUYTOI CRT · Mar 31, 2026 · 141 m away - Zoning review
Not Started
1030 DON MILLS RD · Mar 25, 2026 · 222 m away - Minor varianceApproved
To alter the existing one-storey detached dwelling by constructing one-storey rear and front additions.
4 NORTH HILLS TER · Feb 19, 2026 · 247 m away - Zoning review
Application On Hold
4 NORTH HILLS TER · Dec 8, 2025 · 247 m away - Building permit
Proposd installation of inside back water walve
1 NORTH HILLS TER · Oct 28, 2025 · 242 m away - Building permit
1 Wall Sign1 Projecting Sign
49 CLOCK TOWER RD · Jun 3, 2025 · 259 m away - Building permit
Proposal to install a backwater valve on the sanitary line in an existing SFD-detached dwelling.
98 PLATEAU CRES · Apr 24, 2025 · 287 m away - Building permit
Proposal to construct a 3m wide 6m deep attached garage at the end of asphalt driveway adjoining to existing bungalow house.
1 MOCCASIN TRL · Mar 31, 2025 · 68 m away
Neighbourhood: Banbury-Don Mills
About the area around the lot, not the lot itself.
- Nearest station
- Don Valley Station21 min walk
- Nearest TTC stop
- The Donway East at Don Mills Rd1 min walk
- Nearest cycling route
- Moccasin TrlMulti-Use Trail, 1 min walk
- Nearest traffic count
- 5,076 vehicles in 8 hThe Donway E / Moccasin Trl, 40 m away, Apr 16, 2019
- Serious collisions within 500 m
- 12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
- Parks
- Moccasin Trail Park1 min walk
- Don Mills Local Park5 min walk
- Macklin Hancock Park8 min walk
Schools within 1 km
- GREENLAND PUBLIC SCHOOL English Public 3 min walk
- DON MILLS COLLEGIATE INSTITUTE English Public 6 min walk
- DON MILLS MDL SCHOOL English Public 6 min walk
- SENECA HILL PRIVATE SCHOOL Private 9 min walk
- OVERLAND LEARNING CENTRE English Public 10 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Banbury-Don Mills | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $91,000 | $84,500 |
| Households that own their home | 60% | 54% |
| Population (2021) | 27,155 | 16,813 |
| Homes built in 1960 or before | 24% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Banbury-Don Mills | City median |
|---|---|---|
| Assault | 404.9 | 636.3 |
| Robbery | 101.2 | 69.5 |
| Shootings | 9.2 | 10.5 |
| Auto theft | 220.9 | 192.6 |
| Theft over $5,000 | 67.5 | 46.1 |
| Break and enter | 248.5 | 172.8 |
| Theft from vehicles | 211.7 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.