HousePrecheckCheck an address

4 Curity AveToronto · zoning, lot size and permit records

Employment · E 1.0 (x229)≈ 47.6 × 247.2 m1,597 m²on Curity Ave

Not a home

Vacant Land

The City of Toronto's real estate inventory lists Vacant Land here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • City of Toronto landThe City decides what happens here; ask it about any plans.
  • 1 development application open within 300 m, up to 10 storeysNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
N50 m
≈ 47.6 m frontage≈ 247.2 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Natural Heritage System (2% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 10 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

No permits, applications or Committee of Adjustment files on this lot in the City's open records.

Check before you build

  • Site-specific exception 900.20.10(229)

    Needs a closer look

    4 site-specific rules and 4 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.20.10(229)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The minimum permitted lot area is 0.4 hectares

  2. Rule B

    The maximum lot coverage must not exceed 65%

  3. Rule C

    The permitted maximum height must not exceed 15.0 metres

  4. Rule D

    No building or structure may be erected closer than 75 metres to any building with a dwelling unit in an area zoned for residential purposes unless a public road separates the industrial building from the dwelling unit . Prevailing By-laws and Prevailing Sections: (A) City of Toronto by-law 89-2003; and (B) City of Toronto by-law 589-2008.

  5. Older by-law A

    The minimum permitted lot area is 0.4 hectares

  6. Older by-law B

    The maximum lot coverage must not exceed 65%

  7. Older by-law C

    The permitted maximum height must not exceed 15.0 metres

  8. Older by-law D

    No building or structure may be erected closer than 75 metres to any building with a dwelling unit in an area zoned for residential purposes unless a public road separates the industrial building from the dwelling unit . Prevailing By-laws and Prevailing Sections: (A) City of Toronto by-law 89-2003; and (B) City of Toronto by-law 589-2008.

By-law 569-2013, Chapter 900

Lot facts

Area
1,597 m²
Frontage
47.6 mestimated, irregular lot
Depth
247.2 mestimated, irregular lot
Street
Curity Ave
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—
  • Zone E 1.0 (x229) (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source

Around this lot

Minor variances approved
100%9 of 9 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
1
Development applications
2

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 9 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing one-storey detached building by constructing a rear one-storey addition and a complete second storey addition, for the use of an industrial warehouse.

    22 CRANFIELD RD · May 28, 2025 · 351 m away
  • Minor varianceApproved

    To alter the existing detached building (manufacturing use) by constructing a one-storey addition along a portion of the south side wall, for a vehicle depot use and 12 loading docks.

    5 BERMONDSEY RD · Feb 26, 2025 · 401 m away
  • Minor varianceApproved

    To alter the existing industrial building by constructing a new south side addition, new unloading station and new silos in the north side yard. The property has a legal non-conforming status due to its present use for "manufacture of goods and materials including an accessory factory retail outlet" being located within the building prior to the enactment of Zoning By-law 6752.

    5 BERMONDSEY RD · Mar 8, 2016 · 401 m away
  • Minor varianceApproved

    To altered the existing manufacturing building by constructing a two-storey addition with two loading docks, and a one-storey addition for a shipping office.

    5 BERMONDSEY RD · Nov 19, 2014 · 401 m away

Latest activity nearby

  • Building permit

    Back water valve installation

    22 JOANITH DR · Nov 12, 2026 · 297 m away
  • Building permit

    Renovate the existing one-and-one-half-storey detached dwelling by constructing a full second storey addition (cantilevered at the front and rear), main floor open concept and box window, a new front porch with stairs, and a rear main floor deck with stairs.

    24 GARDENS CRES · Oct 21, 2026 · 287 m away
  • Building permit

    Proposal to demolish the existing deck and construct a new deck in the rear yard

    11 BARRETT RD · Oct 13, 2026 · 299 m away
  • Building permit

    Proposed replacement of the existing single zone fire alarm system with an upgrade to three zones.

    1016 O'CONNOR DR · Sep 16, 2026 · 117 m away
  • Building permitmultiplex, secondary suite

    Revision No.1: REVISION TO CONVERT ALL EXTERIOR EXISTING BASEMENT AND MAIN FLOOR WALLS TO NEW WALLSProposal for a rear 2 storey addition, 2nd floor addition, rear deck, underpinning and interior alterations to create a duplex

    14 JOANITH DR · Sep 9, 2026 · 283 m away
  • Minor varianceApproved

    To alter the existing one-and-one-half-storey detached dwelling by constructing a complete second storey addition (cantilevered at the front and rear), a front ground floor one-storey addition (bay window), a new front porch with stairs, and a rear ground floor deck with stairs.

    24 GARDENS CRES · Aug 19, 2026 · 287 m away
  • Building permit

    Proposal for sunroom addition to rear of 3rd floor apartment with new roof over

    855-857 O'CONNOR DR · Jun 19, 2026 · 287 m away
  • Zoning review

    Closed

    24 GARDENS CRES · May 26, 2026 · 287 m away
  • Zoning review

    Closed

    971 O'CONNOR DR · May 25, 2026 · 128 m away
  • Minor varianceApproved

    To alter the existing one-storey detached dwelling by constructing a complete second-storey addition, a side (east) and rear two-storey addition with a rear basement walkout, a rear ground floor deck with stairs, a front porch with stairs, a front integral one-car garage, and a new front yard walkway. There will be a total of two residential dwelling units on this lot (one unit occupying the basement and one unit occupying the first and second levels).

    14 JOANITH DR · May 13, 2026 · 283 m away

Neighbourhood: O'Connor-Parkview

About the area around the lot, not the lot itself.

Nearest station
Sloane Station30 min walk
Nearest TTC stop
Curity Ave at O'Connor Dr North Side2 min walk
Nearest cycling route
Glenshaw CresSigned Route (No Pavement Markings), 9 min walk
Nearest traffic count
11,945 vehicles in 8 hO'Connor Dr / Gardens Cres, 120 m away, Sep 12, 2017
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Topham Park6 min walk
Parkview Gardens8 min walk
Charles Sauriol Conservation Area9 min walk

Schools within 1 km

  • ABACUS MONTESSORI Private 7 min walk
  • SELWYN ELEMENTARY SCHOOL English Public 7 min walk
  • GORDON A BROWN MDL SCHOOL English Public 8 min walk
  • PRESTEIGN HEIGHTS ELEMENTARY SCHOOL English Public 10 min walk
  • IMAM ALI ISLAMIC CENTRE AND AL HAADI ACADEMY SCHOOL Private 16 min walk
  • O'CONNOR PUBLIC SCHOOL English Public 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureO'Connor-ParkviewMedian neighbourhood
Median household income (2020)$77,000$84,500
Households that own their home46%54%
Population (2021)18,40516,813
Homes built in 1960 or before48%29%
Homes needing major repairs10%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleO'Connor-ParkviewCity median
Assault755.6636.3
Robbery43.669.5
Shootings4.810.5
Auto theft179.2192.6
Theft over $5,00038.746.1
Break and enter77.5172.8
Theft from vehicles193.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.