Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
1 Committee of Adjustment file on this lot
Good to know1 approved. A159/06EYK (To continue to operate the existing public garage for a further term of five years. In..., 2006).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)16 development applications open within 300 m
Good to know16 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 54 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
6 records on file: more than at 95% of Toronto houses (median 0).
- Building permit22 230420Closed
Install Double check valve back flow preventer
Dec 1, 2022 · 4 BUCKINGHAM ST - Building permit20 224748Cancelled
PROPOSED OPENING IN SOUTH WALL AND INTERIOR RAMP ACCESS FOR PROPOSED STORAGE WAREHOUSE
Jan 5, 2021 · 4 BUCKINGHAM ST - Zoning review06 133694 LTOClosedMay 10, 2006 · 4 BUCKINGHAM ST
- Minor varianceA159/06EYKApproved
To continue to operate the existing public garage for a further term of five years. In Decision Number A11/00ET, the Committee of Adjustment authorized a minor variance to permit the public garage to operate from the building and to maintain the existing site conditions, for a term of 5 years expiring on April 1, 2005.
Apr 20, 2006 · 4 BUCKINGHAM ST - Zoning review06 102813 ZPRClosedJan 16, 2006 · 4 BUCKINGHAM ST
- Zoning review05 198847 LTOClosedNov 1, 2005 · 4 BUCKINGHAM ST
Lot facts
- Area
- 1,297 m²
- Frontage
- 21.5 m
- Depth
- 60.5 m
- Street
- Buckingham St
- Corner lot
- No
- Public lane
- None
- House footprint
- 720 m²roof up to 8.5 m
- Back yard
- 15.9 mhouse to rear lot line
- Side yards
- 0.8 m and 2.6 mhouse to side lot lines
- Buildings on the lot
- 1house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Site and Area Specific Policy 433, 860. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
- Major Transit Station Area: Mimico. The lot is inside the Mimico Major Transit Station Area approved by the Province (Site and Area Specific Policy 692). Source
- Mimico-Judson Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Zone E 1.0 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source
Around this lot
- Minor variances approved
- 100%21 of 21 decisions
- Garden suite permits
- 1
- Laneway suite permits
- 0
- Multiplex permits
- 10
- Development applications
- 27
Within 300 m, last 10 years. 11 suite and multiplex permits: more than at 77% of Toronto houses (median 3). 21 variance decisions: more than at 52% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To consturct a 42-storey mixed use building, located on top of a 5-storey podium.
8 NEWCASTLE ST · Oct 23, 2025 · 132 m away - Minor varianceApproved
To permit a second steel silo in the front yard. A previous Committee of Adjustment application (A363/11EYK) approved a two-storey addition and a steel silo in the front yard and approved variances related to parking.
2 BUCKINGHAM ST · Aug 2, 2018 · 20 m away - Minor varianceRefused
To construct a partial second storey addition above the existing building.
66 NEWCASTLE ST · Jul 7, 2016 · 140 m away - Minor varianceRefused
To legalize and to maintain the existing 6 buildings constructed without building permits.
29 JUDSON ST · Apr 24, 2014 · 445 m away
Latest activity nearby
- Consent (lot split)Pending
To obtain consent to create an easement/right-of-way.
365 ROYAL YORK RD · Jan 7, 2027 · 205 m away - Consent (lot split)Pending
To obtain consent to create an easement/right-of-way.
365 ROYAL YORK RD · Jan 7, 2027 · 205 m away - Consent (lot split)Pending
To obtain consent to create an easement/right-of-way.
365 ROYAL YORK RD · Jan 7, 2027 · 205 m away - Minor variancePending
To construct a new 14-storey affordable rental building with co-op units that will contain a total of 183 rental dwelling units. The development will be located within Block B on the property municipally known as 18 Buckingham Street.
18 BUCKINGHAM ST · Dec 3, 2026 · 35 m away - Consent (lot split)Pending
Cancelled
365 ROYAL YORK RD · Nov 18, 2026 · 205 m away - Consent (lot split)Pending
In Progress
367 ROYAL YORK RD · Nov 12, 2026 · 207 m away - Consent (lot split)Pending
Cancelled
101 PORTLAND ST · Nov 12, 2026 · 164 m away - Consent (lot split)Pending
Cancelled
375 ROYAL YORK RD · Nov 12, 2026 · 222 m away - Building permit
Fire damage restoration of an existing 3-storey mixed-use building. Work includes replacement of fire-damaged roof components, reconstruction of portions of the third-floor exterior wall and interior partitions, localized masonry repairs, reinstatement of fire separations and life safety systems, and associated interior finish restoration. No change to use, height, footprint, or number of units.
149 PORTLAND ST · Nov 5, 2026 · 215 m away - Building permit
Installation of Main Drain Pipe Backwater Valve
173 MELROSE ST · Sep 16, 2026 · 262 m away
Neighbourhood: Mimico-Queensway
About the area around the lot, not the lot itself.
- Nearest station
- Mimico GO Station4 min walk
- Nearest TTC stop
- Newcastle St at Windsor St - Mimico GO Station2 min walk
- Nearest cycling route
- Royal York RdBike Lane, 4 min walk
- Nearest traffic count
- 7,694 vehicles in 8 hRoyal York Rd / Newcastle St, 230 m away, Dec 13, 2022
- Serious collisions within 500 m
- 32021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 1 with cyclists
- Parks
- Manchester Park4 min walk
- Coronation Park - Etobicoke5 min walk
- Queens Avenue Parkette6 min walk
Schools within 1 km
- GEORGE R GAULD JR SCHOOL English Public 4 min walk
- OAK LEARNERS Private 4 min walk
- ST LEO CATHOLIC ELEMENTARY SCHOOL English Separate 8 min walk
- ST LEO CATHOLIC ELEMENTARY SCHOOL (FUTURE ADDRESS FOR MAIN ENTRANCE) English Separate 10 min walk
- DAVID HORNELL JR SCHOOL English Public 10 min walk
- MIMICO ADULT CENTRE English Public 10 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Mimico-Queensway | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $84,000 | $84,500 |
| Households that own their home | 53% | 54% |
| Population (2021) | 17,045 | 16,813 |
| Homes built in 1960 or before | 43% | 29% |
| Homes needing major repairs | 7% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Mimico-Queensway | City median |
|---|---|---|
| Assault | 4209.2 | 636.3 |
| Robbery | 41.5 | 69.5 |
| Homicide | 4.2 | 5.3 |
| Auto theft | 224.2 | 192.6 |
| Theft over $5,000 | 66.4 | 46.1 |
| Break and enter | 132.8 | 172.8 |
| Theft from vehicles | 99.6 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.