HousePrecheckCheck an address

4 Bards WalkwayToronto · zoning, lot size and permit records

Also 10 Bards Walkway, 10 Poets Walkway, 11 Bards Walkway, 11 Poets Walkway, 12 Bards Walkway and 94 more

Residential townhouse · RT (x85)≈ 305.6 × 104.2 m22,444 m²on Bards Walkway

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 2.2 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • 1 open order or by-law investigation at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 23 119889 WNP 00 VI (Order Issued No Permit: 2 Garages installed to access front and rear of property withou..., 2023, status Order Issued).

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N50 m
≈ 305.6 m frontage≈ 104.2 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 open order or by-law investigation

    Needs a closer look

    Not resolved in the City's records: 23 119889 WNP 00 VI (Order Issued No Permit: 2 Garages installed to access front and rear of property withou..., 2023, status Order Issued).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Rooming House, Zoning): 26 101396 ZON 00 IR (Zoning, 2026); 25 184683 RMH 00 IR (Rooming House, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

8 records on file: more than at 98% of Toronto houses (median 0).

  • By-law investigation26 204572 LGW 00 IRClosed

    Long Grass and Weeds

    Jul 19, 2026 · 21 BARDS WALKWAY
  • By-law investigation26 187509 WST 00 IRClosed

    Waste

    Jun 18, 2026 · 29 POETS WALKWAY
  • By-law investigation26 101396 ZON 00 IRClosed

    Zoning

    Jan 6, 2026 · 19 BARDS WALKWAY
  • By-law investigation25 184683 RMH 00 IRClosed

    Rooming House

    Jun 27, 2025 · 19 BARDS WALKWAY
  • Building permit23 221188Closed

    Proposal for second story deck

    Jan 23, 2024 · 62 BARDS WALKWAY
  • Building order23 119889 WNP 00 VIOrder Issued

    Order Issued No Permit: 2 Garages installed to access front and rear of property without permits or authority from condo corporoation

    Mar 3, 2023 · 21 BARDS WALKWAY
  • Building permit20 120414Closed

    Proposed interior alterations to create a new opening from the existing laundry room into the garage.

    Mar 17, 2020 · 10 BARDS WALKWAY
  • Building permit15 149348Closed

    PLUMBING (PS), BACKFLOW PREVENTION DEVICES (WATER ONLY)

    May 8, 2015 · 4 BARDS WALKWAY

Check before you build

  • Site-specific exception 900.5.10(85)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.5.10(85)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Former City of North York by-law 25970.

By-law 569-2013, Chapter 900

Lot facts

Area
22,444 m²
Frontage
305.6 mestimated, irregular lot
Depth
104.2 mestimated, irregular lot
Street
Bards Walkway
Corner lot
No
Public lane
None
Max height
10.5 m
Max lot coverage
25%
  • Zone RT (x85) (Residential Townhouse). Chapter 10, section 10.60 of the by-law. Source

Around this lot

Minor variances approved
—no decisions on file
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
1

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Repair backflow preventer - using exact make and model to replace with 2 new double check valves 4" domestic Watts 757NRS Ser#Y1-1178

    70 OLD SHEPPARD AVE · Jul 30, 2025 · 200 m away
  • Building permit

    Proposal for a security gate house.

    1900 SHEPPARD AVE E · Jul 24, 2025 · 104 m away
  • Building permit

    Proposal to convert bathtub to shower. This includes moving the tap and drain to the opposite side of the tub which shortens the runs to the wet wall, there are no changes to the wall locations in the bathroom we're renovating.

    15 WAGON TRAILWAY · May 2, 2025 · 190 m away
  • Building permit

    Proposed replacement of existing 1" DCVA back flow prevention in an existing restaurant. *Tim Hortons*

    2075 SHEPPARD AVE E · Oct 21, 2024 · 232 m away
  • Building permit

    REPAIR TO COMMERCIAL BUILDING (TIM HORTON'S) DUE TO VEHICLE IMPACT DAMAGE.

    2075 SHEPPARD AVE E · Aug 14, 2024 · 232 m away
  • Building permit

    Proposed waterproofing of the balcony slabs and crack treatment.

    30 HERONS HILL WAY · Apr 17, 2024 · 222 m away
  • Building permit

    Interior alterations to open a door between 2 units

    1900 SHEPPARD AVE E · Mar 8, 2024 · 104 m away
  • Zoning review

    Closed

    5 OLD SHEPPARD AVE · Mar 1, 2024 · 152 m away
  • Building permit

    Interior alterations to open a door between 2 units

    1900 SHEPPARD AVE E · Mar 1, 2024 · 104 m away
  • Building permit

    Replacement of the exisitng fire alarm control panel and annuciator.

    1900 SHEPPARD AVE E · Feb 14, 2024 · 104 m away

Neighbourhood: Pleasant View

About the area around the lot, not the lot itself.

Nearest station
Don Mills Station15 min walk
Nearest TTC stop
1900 Sheppard Ave East2 min walk
Nearest cycling route
Huntingwood DrCycle Track, 14 min walk
Nearest traffic count
22,602 vehicles in 14 hSheppard Ave E / Herons Hill Way, 150 m away, Oct 19, 2025
Serious collisions within 500 m
22021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 1 with cyclists
Parks
Old Sheppard Park2 min walk
David Caplan Park6 min walk
Muirhead Park6 min walk

Schools within 1 km

  • MUIRHEAD PUBLIC SCHOOL English Public 5 min walk
  • CESTAR HIGH SCHOOL Private 6 min walk
  • NORTH TORONTO CHRISTIAN SCHOOL Private 7 min walk
  • OXFORD COLLEGE OF CANADA SECONDARY SCHOOL Private 7 min walk
  • ABU HURAIRA ISLAMIC CENTRE AND ACADEMY Private 7 min walk
  • AMBERWOOD ACADEMY Private 9 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigurePleasant ViewMedian neighbourhood
Median household income (2020)$89,000$84,500
Households that own their home73%54%
Population (2021)15,22016,813
Homes built in 1960 or before8%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peoplePleasant ViewCity median
Assault375636.3
Robbery48.469.5
Auto theft127192.6
Theft over $5,00060.546.1
Break and enter90.7172.8
Theft from vehicles187.5188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.