About 3D Brussels St
3D Brussels St is on a 6.2 m by 27.9 m lot on Leaves Ter in Stonegate-Queensway. The zoning is RT. A site-specific exception, 900.5.10(31), changes some of the usual rules for this address. The lot also fronts Brussels St. 30% of the lot is in the area TRCA regulates for flooding and erosion. Building or grading in that part usually needs a TRCA permit. 12% of the lot is under the City's ravine and natural feature protection by-law, which limits tree removal and grading there.
The City has 4 records on this lot since 2022. That is more than at 88% of Toronto houses. In 2023, a Committee of Adjustment application was filed: "Proposal to construct a second floor exterior balcony". Status: application withdrawn. In 2023, a building permit was filed: "Proposal to construction of a second-story wooden deck at the rear of an existing residential townhouse. the proposed deck will measure approximately 16 x 6…". Status: cancelled. In 2023, a Committee of Adjustment application was filed. Status: cancelled. Nothing on file is open right now.
No development applications are open within 300 m. Within 300 m, the Committee of Adjustment decided 22 minor variance applications in the last 10 years and approved 91%. The nearest TTC stop is Park Lawn Rd at The Queensway South Side, a 4-minute walk.
Summary
What the City's records show on this house
- TRCA regulated area (30% of lot)ModerateFree check
- Site-specific exception 900.5.10(31)Moderate
- No permit for a second unit on fileLowFree check
- Ravine and natural feature protection (12% of lot)LowFree check
- Natural Heritage System (100% of lot)Low
- 2 Committee of Adjustment files on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Multiplex up to 4 units
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- No open orders or by-law investigations
- No permits left open for years
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
No permit for a second unit on file
LowCheck if it appliesSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
2 Committee of Adjustment files on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Committee of Adjustment
City files on this lot
4 records on file, more than at 88% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2023-10-20 | Building permit23 216891 | Proposal to construction of a second-story wooden deck at the rear of an existing residential townhouse. The proposed deck will measure approximately 16 x 6 feet, with a height of 8 feet from the ground. It will be supported by a ledger board and two posts anchored with concrete footings and will feature aluminum rail for safety. The deck will be accessed from the second-story and will not have stairs leading to the ground. | Cancelled | |
| 2023-02-17 | Minor varianceSYS 5231595 | No description on file | Pending | |
| 2023-02-03 | Minor varianceA0075/23EYK | Proposal to construct a second floor exterior balcony | Pending | |
| 2022-03-23 | Zoning review22 125862 ZAP | No description on file | Cancelled |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Ravine and natural feature protection (12% of lot)
- Site-specific exception 900.5.10(31)
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.5.10(31)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Ravine and natural feature protection (12% of lot)
LowFor later, once you own itSee the ravine lot check for this house
What the record shows, what it means for you and what to doUnlock
Natural Heritage System (100% of lot)
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.5.10(31)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- TRCA regulated area (30% of lot)
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
TRCA regulated area (30% of lot)
ModerateCheck before you offerSee the ravine lot check for this house
What the record shows, what it means for you and what to doUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- Multiplex up to 4 units: likely fits
- Secondary suite: likely fits
- No public lane, so no laneway suite
What this part means for this house, in plain EnglishUnlock
Multiplex up to 4 units
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- RT (x31)
- Height limit
- —
- Lot coverage limit
- 25%
- Corner lot
- Yes, also on Brussels St
- Public lane
- None
- New house permit
- None since 2000
- House footprint
- 65 m²
- Back yard
- 7.1 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 0 development applications within 300 m in 10 years, none open
- 2 suite and multiplex permits within 300 m in 10 years
- 22 minor variance decisions within 300 m, 91% approved
What this part means for this house, in plain EnglishUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 4 of 8 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Stonegate-Queensway neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Mimico GO StationNearest station21 min walk
- Park Lawn Rd at The Queensway South SideNearest TTC stop4 min walk
- Mimico Creek TrlNearest cycling route5 min walk
- Behaviour Innovations, Children's CollegeSchool6 min walk
- Behaviour Innovations, Children's CollegeSchool6 min walk
- St Louis Catholic Elementary SchoolSchool13 min walk
- Karen Kain School of the ArtsSchool14 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3465.6
- Robberycity median 69.540.8
- Homicidecity median 5.33.4
- Shootingscity median 10.513.6
- Auto theftcity median 192.6193.7
- Theft over $5,000city median 46.168
- Break and entercity median 172.8217.5
- Theft from vehiclescity median 188.1129.2
Ready emails
Copy and send as they are.
1 question for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist