HousePrecheckCheck an address

399 The West MallToronto · zoning, lot size and permit records

Commercial residential · CR 0.40 (c0.40; r0.0) SS3 (x900)≈ 238.2 × 282.4 m44,777 m²on The West Mallcorner, also on Civic Centre Crt

Not a home

Etobicoke Civic Centre

The City of Toronto's real estate inventory lists Etobicoke Civic Centre here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A public buildingVisitors and traffic in its open hours; usually quiet at night.
  • Permits or applications open on this parcelStill open in the City's records: 19 157675 (Proposal for tunnel expansion joint repairs and replacement of concrete stairs, 2019, status Inspection); 06 171946 (Cooling tower replacement for Etobicoke Civic Centre, 2006, status Inspection); 05 134060 (Interior alterations to 3rd floor North Block due to relocation of WES Dept. offices an..., 2005, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 m, up to 14 storeysNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
N50 m
≈ 238.2 m frontage≈ 282.4 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: listed

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused. A listing is not registered on title, so a title search will not show it.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 3 building permits open, the oldest since 2005

    Needs a closer look

    Still open in the City's records: 19 157675 (Proposal for tunnel expansion joint repairs and replacement of concrete stairs, 2019, status Inspection); 06 171946 (Cooling tower replacement for Etobicoke Civic Centre, 2006, status Inspection); 05 134060 (Interior alterations to 3rd floor North Block due to relocation of WES Dept. offices an..., 2005, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 5 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards): 26 206547 PRS 00 IR (Property Standards, 2026); 26 173748 000 00 IR (Adequate Heat, 2026); 26 174076 PRS 00 IR (Property Standards, 2026); and 2 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 14 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

32 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 221744 ELS 00 IRClosed

    Election Signs

    Aug 18, 2026 · 399 THE WEST MALL
  • By-law investigation26 221565 ELS 00 IRClosed

    Election Signs

    Aug 18, 2026 · 399 THE WEST MALL
  • By-law investigation26 206547 PRS 00 IRClosed

    Property Standards

    Jul 22, 2026 · 399 THE WEST MALL
  • By-law investigation26 173748 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 399 THE WEST MALL
  • By-law investigation26 174076 PRS 00 IRClosed

    Property Standards

    May 29, 2026 · 399 THE WEST MALL
  • By-law investigation26 154421 PRS 00 IRClosed

    Property Standards

    May 4, 2026 · 399 THE WEST MALL
  • By-law investigation26 127250 000 00 IRClosed

    Property Standards

    Mar 10, 2026 · 399 THE WEST MALL
  • Building permit20 229349Closed

    Proposal to install a maglock on double door at east side entrance for existing office building

    Jan 18, 2021 · 399 THE WEST MALL
Show 24 older records
  • Building permit20 163112Closed

    Revision # 01 - To reduce the scope of work to demolition of one meeting room and minor repairs related.Proposal for interior alterations for existing office building. 2nd floor

    Nov 16, 2020 · 399 THE WEST MALL
  • Building permit19 157675Inspection

    Proposal for tunnel expansion joint repairs and replacement of concrete stairs.

    Jun 19, 2019 · 399 THE WEST MALL
  • Building permit17 106462Closed

    Replacement of exiting emergency(natural gas) generator(basement) with one new natural gas fire emergency generator system on the roof

    Jan 24, 2017 · 399 THE WEST MALL
  • Building permit16 137195Closed

    Permit to install automatic door operators.

    Apr 22, 2016 · 399 THE WEST MALL
  • Building permit16 113033Closed

    FIRE ALARM UPGRADE / REPLACEMENT

    Mar 4, 2016 · 399 THE WEST MALL
  • Building permit15 212914Closed

    Permit for interior alterations to part of existing office space.

    Sep 3, 2015 · 399 THE WEST MALL
  • Building permit15 170683Closed

    Permit to install new HVAC system within existing Office building (Lunch Room/Office area).

    Jun 10, 2015 · 399 THE WEST MALL
  • Zoning review14 233088 ZPRClosed
    Oct 6, 2014 · 399 THE WEST MALL
  • Zoning review14 233070 ZPRCancelled
    Oct 6, 2014 · 399 THE WEST MALL
  • Building permit14 190066Closed

    Interior alterations to relocate existing child care centre *Alderbuds*

    Jul 23, 2014 · 399 THE WEST MALL
  • Building permit13 240703Closed

    REVISION: Change in location of washroom in areas 104 and 105 Interior alteration to existing dental office on lower level.

    Jul 17, 2014 · 399 THE WEST MALL
  • Building permit11 296925Closed

    Interior alterations to fourth floor lobby area (north building).

    Oct 27, 2011 · 399 THE WEST MALL
  • Building permit11 226783Closed

    Interior alterations to main floor to construct a new office within an existing space at Etobicoke Civic Centre. Relocate existing diffuser

    Jul 5, 2011 · 399 THE WEST MALL
  • Building permit10 296021Closed

    Proposed plumbing alterations in sanitation room of existing dental clinic in municipal building.

    Nov 19, 2010 · 399 THE WEST MALL
  • Building permit09 118719Closed

    Installation of (2) maglocks to the second floor and (1) maglock to the third floor

    Jun 2, 2009 · 399 THE WEST MALL
  • Zoning review09 137516 LPRClosed
    May 13, 2009 · 399 THE WEST MALL
  • Building permit06 199670Closed - Dormant

    Interior alterations to an existing office space on the second floor for the **Etobicoke Civic Centre**.

    Jan 9, 2007 · 399 THE WEST MALL
  • Building permit06 185532Closed - Dormant

    to up grade existing roof by providing strucutreal/steele frame for cooling unit to replace existing to existing power house ( refer to mech. folder 06-171946 for unit)

    Oct 26, 2006 · 399 THE WEST MALL
  • Building permit06 171946Inspection

    Cooling tower replacement for Etobicoke Civic Centre

    Oct 23, 2006 · 399 THE WEST MALL
  • Building permit05 193378Closed

    Installation of one mag-lock on the third floor.

    Oct 24, 2005 · 399 THE WEST MALL
  • Building permit05 134060Inspection

    Interior alterations to 3rd floor North Block due to relocation of WES Dept. offices and One (1) maglock

    Jul 5, 2005 · 399 THE WEST MALL
  • Building permit03 201221Closed

    To install 1 magnetic lock at main entrance (ground floor) of Etobicoke Civic centre

    Dec 19, 2003 · 399 THE WEST MALL
  • Zoning review03 193530 LTOClosed
    Nov 14, 2003 · 399 THE WEST MALL
  • Building permit02 111614Closed

    1 Maglock on first floor. 1 Maglock on second floor.

    Mar 1, 2002 · 399 THE WEST MALL

Check before you build

  • Site-specific exception 900.11.10(900)

    Needs a closer look

    1 site-specific rule applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(900)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    Despite regulation 40.5.1.10 (3), the permitted maximum floor space index of all land uses on the lot , including all non-residential uses, may be 0.7 if, a minimum of 30% of the area of the lot is used for landscaping .

By-law 569-2013, Chapter 900

Lot facts

Area
44,777 m²
Frontage
238.2 mestimated, irregular lot
Depth
282.4 mestimated, irregular lot
Street
The West Mall
Corner lot
Yes, also on Civic Centre Crt282.4 m along it
Public lane
None
House footprint
1,525 m²roof up to 16.3 m
Back yard
160.1 mhouse to rear lot line
Side yards
75.4 m and 137 mhouse to side lot lines
Buildings on the lot
9house, garage, sheds
Max height
11 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone CR 0.40 (c0.40; r0.0) SS3 (x900) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 3 City trees in front of this lot. The City's street tree inventory lists 3 trees at this address: maple, hedge (45 cm), linden (21 cm), kentucky coffeetree (14 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
—no decisions on file
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
0
Development applications
2

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To reduce the number of lawful parking spaces in order to accomodate electric vehicle charging stations with a battery storage enclosure.

    380 THE EAST MALL · May 14, 2026 · 479 m away
  • Minor varianceApproved

    To construct a maximum of four enclosed temporary structures from April 1st to July 31st in conjunction with the continued operation of the outdoor garden centre.

    380 THE EAST MALL · Feb 11, 2016 · 479 m away
  • Minor varianceApproved

    To construct two new commercial buildings on the north side of the subject lands.

    380 THE EAST MALL · Nov 19, 2015 · 479 m away

Latest activity nearby

  • Consent (lot split)Approved

    To obtain consent to sever the lot into two lots and to create various easements/ right-of-ways.

    375-385 THE WEST MALL · Nov 19, 2026 · 214 m away
  • Building permit

    Proposal to undertake Exterior Renovations (AODA), including exterior parking improvements, line painting, stair modifications (guards, handrails, and tactile indicators), installation of permeable pavers, and curb upgrades to enhance accessibility and site functionality in compliance with AODA requirements.

    400 THE WEST MALL · Nov 2, 2026 · 154 m away
  • Zoning review

    Cancelled

    2 CIVIC CENTRE CRT · Sep 10, 2026 · 95 m away
  • Building permit

    INTERIOR ALTERATIONS TO DEMISE AND BUILD-OUT EXISTING SUITE #900 INTO THREE SEPARATE SUITES #900, #901, & #902.

    405 THE WEST MALL · Aug 31, 2026 · 270 m away
  • Building permit

    Demolition and recasting of entrance stairs and replacement of roof assembly above the main entrance podium structural slab.

    1 CIVIC CENTRE CRT · Jul 8, 2026 · 183 m away
  • Building permit

    Test - New House

    2 CIVIC CENTRE CRT · Jun 17, 2026 · 95 m away
  • Building permit

    Interior Alterations for existing Group D on Ground Floor and 2nd Floor - UNIT 110, "Autotrader"

    405 THE WEST MALL · Jun 3, 2026 · 270 m away
  • Building permit

    Rooftop solar panel installation and battery backup.

    6 RATHGAR AVE · May 28, 2026 · 299 m away
  • Building permit

    Proposal for alterations to exterior parking, line painting, stairs, permeable pavers and curbs

    400 THE WEST MALL · Mar 26, 2026 · 154 m away
  • Building permit

    Proposed alteration to fire sprinklers.

    401 THE WEST MALL · Feb 11, 2026 · 236 m away

Neighbourhood: Etobicoke West Mall

About the area around the lot, not the lot itself.

Nearest station
Kipling Station40 min walk
Nearest TTC stop
399 The West Mall - Etobicoke Civic Centre1 min walk
Nearest cycling route
Renforth DrBike Lane, 9 min walk
Nearest traffic count
5,046 vehicles in 8 hThe West Mall / Civic Centre Crt, 140 m away, Nov 4, 2020
Serious collisions within 500 m
32021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 1 with cyclists
Parks
Dennis Flynn Park2 min walk
Broadacres Park4 min walk
East Mall Park9 min walk

Schools within 1 km

  • TORONTO DISTRICT SCHOOL BOARD - WEST EDUCATION OFFICE English Public 3 min walk
  • EATONVILLE JR SCHOOL English Public 10 min walk
  • BURNHAMTHORPE COLLEGIATE & ADULT LEARNING CENTRE English Public 11 min walk
  • BLOORDALE MDL SCHOOL English Public 12 min walk
  • BROADACRES JR SCHOOL English Public 12 min walk
  • WEST GLEN JR SCHOOL English Public 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureEtobicoke West MallMedian neighbourhood
Median household income (2020)$84,000$84,500
Households that own their home56%54%
Population (2021)11,86516,813
Homes built in 1960 or before23%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleEtobicoke West MallCity median
Assault468.6636.3
Robbery27.669.5
Auto theft199.8192.6
Theft over $5,00013.846.1
Break and enter110.3172.8
Theft from vehicles179.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.