HousePrecheckCheck an address

399 Church StToronto · zoning, lot size and permit records

Commercial residential · CR 4.0 (c1.0; r4.0) SS1 (x2142)15.6 × 38.3 m591 m²on Church Stcorner, also on Carlton St

Not a home

Taie International Institute School

The City's school locations place Taie International Institute School on this parcel. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A school next doorDrop-off traffic around 8 to 9 am and 3 to 4 pm on school days, children walking; a short walk for a family.
  • Permits or applications open on this parcelRecent records on this lot: 26 211082 (Proposal for interior alterations and change of use from accessory Storage into a Comme..., 2026); 23 143022 (REV: Revision to the existing building permit to include two classrooms in the basement..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 8 development applications open within 300 m, up to 48 storeysNew buildings may go up around here in the next years. More change nearby than at 98% of Toronto houses.
  • Major Transit Station Area: WellesleyThe City plans more homes around the station: good for transit, and more building over time.
N10 m
15.6 m frontage38.3 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 211082 (Proposal for interior alterations and change of use from accessory Storage into a Comme..., 2026); 23 143022 (REV: Revision to the existing building permit to include two classrooms in the basement..., 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 8 development applications open within 300 m

    Good to know

    8 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 48 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

24 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 211082Under Review

    Proposal for interior alterations and change of use from accessory Storage into a Commercial Language Studies School. Refer to permits 16-147854 and 23-143022.

    Jul 29, 2026 · 399 CHURCH ST
  • Building permit26 124616Closed

    Revision 01 - Revision to include Technology Office Room 317 divided with a partition and a separate Equipment room 317A created, FHC removed, and Plumbing fixtures changed.---------------------------------------------------------------Proposed change of use and interior alterations to 3rd and 4th floor to return to Group D occupancy.

    Jun 29, 2026 · 399 CHURCH ST
  • Building permit23 143022Examiner's Notice Sent

    REV: Revision to the existing building permit to include two classrooms in the basement and the 2nd floor.Proposal to construct interior alterations to an existing language studies school.

    Jun 10, 2026 · 399 CHURCH ST
  • Building permit26 125819Closed

    Proposal to install magnetic locks associated with application # 26-124616.

    Apr 15, 2026 · 399 CHURCH ST
  • Zoning review23 132699 LPRClosed
    Apr 11, 2023 · 399 CHURCH ST
  • Building permit22 131868Closed

    Application for a permit to erect and display five illuminated wall signs.*****JAPANESE NOODLE HOUSE*****

    May 4, 2022 · 399 CHURCH ST
  • Building permit22 109374Closed

    Proposal for interior alterations in kitchen area

    Feb 14, 2022 · 399 CHURCH ST
  • Zoning review18 115294 LTOClosed
    Feb 9, 2018 · 399 CHURCH ST
Show 16 older records
  • Building permit17 213820Closed

    In conjunction with a four storey building on the premises, proposal to erect and display two illuminated wall signs, both displaying static copy. The proposed wall sign located on the fourth storey of the west elevation measures 1.21 metres vertically by 6.4 metres horizontally at a height of 18.41 metres above grade. The proposed wall sign is located on the second storey of the north elevation contains two sign faces, each sign face measuring 2.0 metres vertically by 0.5 metres horizontally at a height of 10.86 metres above grade.**TAIE**

    Sep 12, 2017 · 399 CHURCH ST
  • Building permit16 261727Cancelled

    In conjunction with a multi-storey building on the premises, proposal to erect and display one illuminated projecting sign on the second storey north elevation. The proposed sign contaings two sign faces, each measuring ____ metres vertically by 1.0 metres horizontally at a height of ____ metres above grade.**TAIE**

    Dec 8, 2016 · 399 CHURCH ST
  • Zoning review16 260611 ZSVClosed
    Dec 6, 2016 · 399 CHURCH ST
  • Building permit16 249779Closed

    In conjunction with a multi-storey building on the premises, proposal to erect and display one illuminated wall sign displaying static copy on the first storey west elevation. The proposed sign is 0.89 metres vertically by 2.79 metres horizontally at a height of 6.09 metres above grade.**TAIE International Institute**

    Nov 24, 2016 · 399 CHURCH ST
  • Building permit16 147854Closed

    Interior alterations on the basement, 2nd, 3rd and 4th floors of the existing office building to convert to a private school.

    Jul 15, 2016 · 399 CHURCH ST
  • Building permit15 270729Closed

    Proposal to install 1 backflow prevention device in an existing multi use, commercial building.

    Apr 4, 2016 · 399 CHURCH ST
  • Zoning review16 108271 ZZUClosed
    Jan 25, 2016 · 399 CHURCH ST
  • Building permit15 256414Closed

    Proposal for minor interior alterations to existing restaurant, (68 person occupant load), in Unit 100, "Jinya Ramen Bar"

    Jan 7, 2016 · 399 CHURCH ST
  • Building permit13 281026Closed

    Proposed alterations to MAIN DRUG MART PHARMACY

    Jan 2, 2014 · 399 CHURCH ST
  • Building permit11 297842Closed

    HVAC - Proposal for interior alterations to existing office space on the 3rd and 4th floors - Aids Committee of Toronto.

    Nov 4, 2011 · 399 CHURCH ST
  • Building permit10 226698Closed

    Permit for interior alteratiosn to existing office space - floor 4 - ACT Toronto - Please note that this applicating is for a different area of the floor than the 09 166102 BLD. Please see reference floor plans.

    Aug 4, 2010 · 399 CHURCH ST
  • Building permit09 166102Closed

    Interior alterations to portion of 2nd floor.

    Sep 24, 2009 · 399 CHURCH ST
  • Building permit09 150353Closed

    HVAC - Interior alterations within suite on 4th floor.

    Jul 24, 2009 · 399 CHURCH ST
  • Zoning review94 025611 LTOClosed
    Nov 14, 1994 · 399 CHURCH ST
  • Zoning review92 025262 LTOClosed
    Mar 6, 1992 · 399 CHURCH ST
  • Zoning review87 030016 LTOClosed
    Apr 15, 1987 · 399 CHURCH ST

Check before you build

  • Site-specific exception 900.11.10(2142)

    Needs a closer look

    1 site-specific rule and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2142)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    On the lands, the minimum front yard or side yard setback from a lot line abutting Church St. is 2.5 metres. [TO: 438-86; 12(2) 286]

  2. Older by-law A

    Section 12(2) 132 of former City of Toronto By-law 438-86

  3. Older by-law B

    Section 12(2) 260 of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
591 m²
Frontage
15.6 m
Depth
38.3 m
Street
Church St
Corner lot
Yes, also on Carlton St38.3 m along it
Public lane
None
House footprint
558 m²roof up to 18 m
Back yard
0 mhouse to rear lot line
Side yards
0.2 m and 0.4 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Site and Area Specific Policy 151. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Major Transit Station Area: Wellesley. The lot is inside the Wellesley Major Transit Station Area approved by the Province (Site and Area Specific Policy 602). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Priority retail street: Carlton Street, Church Street. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 4.0 (c1.0; r4.0) SS1 (x2142) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
94%16 of 17 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
1
Development applications
17

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 17 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit the existing entertainment place of assembly (nightclub) use within the two-storey commercial building.

    508 CHURCH ST · Sep 9, 2026 · 302 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 88-2023(OLT)) for the 40-storey mixed-use building (which is currently under construction), by increasing the residential gross floor area, building height (41-storeys; 123.5 m to 127.6 m and 129.2 m to 133.6 m), and the height of the elevator overrun projection. There will be a total of 516 residential dwelling units on this site.

    20 MAITLAND ST · Apr 1, 2026 · 436 m away
  • Minor varianceApproved

    To alter the existing three-storey apartment building (containing 35 rental dwelling units) by converting the basement level (storage rooms and building management office) and a portion of the ground floor (vacant space) into an additional 11 rental dwelling units. There will be a total of 46 rental dwelling units on this lot.

    134 CARLTON ST · Jul 9, 2025 · 311 m away
  • Minor varianceApproved

    To alter the development standards for the 40-storey mixed-use building (as approved under Site Specific Zoning By-law 88-2023) by increasing the total number of residential dwelling units, the overall and residential gross floor area, the building height, and the maximum projection height of an elevator overrun. Also, to reduce the total number of residential dwelling units with 3 or more bedrooms, the required amenity space, and the total number of residential visitor parking spaces. The new 45-storey mixed-use building (excluding the mechanical penthouse) will have a total of 572 residential dwelling units, 78 residential parking spaces, and 7 residential visitor parking spaces. This is currently undergoing Site Plan Control (Application Number 19 240163 STE 13 SA).

    26 MAITLAND ST · Apr 23, 2025 · 428 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 193-2024(OLT)), for a new 59-storey mixed-use building, by permitting a private student residence use on this lot. There will be a total of 587 residential dwelling units within this building.

    510 YONGE ST · Mar 19, 2025 · 461 m away

Latest activity nearby

  • Consent (lot split)Pending

    To obtain consent to sever a portion of stratified land (air-rights at-and-above an elevation of 121 m) for the purpose of a lot addition.

    50 GERRARD ST E · Nov 25, 2026 · 209 m away
  • Building permit

    Proposal for standalone plumbing alterations to townhouse.

    52 GRANBY ST · Nov 25, 2026 · 150 m away
  • Building permit

    1 Wall Sign***** T-DOT DENTAL*****

    306 JARVIS ST · Nov 17, 2026 · 181 m away
  • Zoning review

    Closed

    66 GERRARD ST E · Nov 9, 2026 · 202 m away
  • Zoning review

    Not Started

    66 GERRARD ST E · Nov 4, 2026 · 202 m away
  • Building permit

    REVISION-01Proposal for interior alterations to existing vacant suite for new crisis centre - "Gerstein Crisis Centre"

    355 CHURCH ST · Oct 30, 2026 · 161 m away
  • Building permit

    Proposal to install a maglock in existing office space.

    355 CHURCH ST · Oct 28, 2026 · 161 m away
  • Building permitsecondary suite

    Interior alteration, second floor additional unit

    27 MCGILL ST · Oct 27, 2026 · 264 m away
  • Zoning review

    Closed

    27 CARLTON ST · Oct 26, 2026 · 199 m away
  • Zoning review

    Closed

    30 CARLTON ST · Oct 20, 2026 · 174 m away

Neighbourhood: Downtown Yonge East

About the area around the lot, not the lot itself.

Nearest station
College Station6 min walk
Nearest TTC stop
Carlton St at Church St1 min walk
Nearest cycling route
Gerrard St ECycle Track, 3 min walk
Nearest traffic count
15,841 vehicles in 14 hCarlton St / Church St, 40 m away, Sep 26, 2026
Serious collisions within 500 m
122021–2026, killed or seriously injured: 1 fatal, 7 with pedestrians, 4 with cyclists
Parks
Allan Gardens3 min walk
Joseph Sheard Parkette4 min walk
Montague Parkette5 min walk

Schools within 1 km

  • TAIE INTERNATIONAL INSTITUTE SCHOOL Private 1 min walk
  • LE COLLEGE FRANCAIS - CARLTON CAMPUS Private 2 min walk
  • NATIONAL BALLET SCHOOL - MARGARET MCCAIN ACEDEMIC CENTRE Private 3 min walk
  • CHURCH ST JR & NATIVE LEARNING CTR English Public 3 min walk
  • TORONTO METROPOLITAN UNIVERSITY - THEATRE SCHOOL University 4 min walk
  • NATIONAL BALLET SCHOOL Private 4 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureDowntown Yonge EastMedian neighbourhood
Median household income (2020)$69,500$84,500
Households that own their home36%54%
Population (2021)17,70016,813
Homes built in 1960 or before7%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleDowntown Yonge EastCity median
Assault2360.8636.3
Robbery143.369.5
Shootings11.910.5
Auto theft75.6192.6
Theft over $5,00099.546.1
Break and enter274.7172.8
Theft from vehicles390.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.