HousePrecheckCheck an address

398 Eglinton Ave EToronto · zoning, lot size and permit records

Residential · R (f9.0; d2.0) (x942)35.5 × 56.9 m2,006 m²on Eglinton Ave Ecorner, also on Forman Ave

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.2 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelRecent records on this lot: 26 136375 (Proposal for concrete repairs at garage ramp inlcuding waterproofing and heating system..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 5 development applications open within 300 m, up to 11 storeysNew buildings may go up around here in the next years. More change nearby than at 94% of Toronto houses.
  • Major Transit Station Area: Mount PleasantThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
35.5 m frontage56.9 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 136375 (Proposal for concrete repairs at garage ramp inlcuding waterproofing and heating system..., 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 5 development applications open within 300 m

    Good to know

    5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 11 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

5 records on file: more than at 93% of Toronto houses (median 0).

  • Building permit26 136375Permit Issued

    Proposal for concrete repairs at garage ramp inlcuding waterproofing and heating system replacement

    May 4, 2026 · 398 EGLINTON AVE E
  • By-law investigation25 253630 GRA 00 IRClosed

    Graffiti

    Nov 13, 2025 · 398 EGLINTON AVE E
  • Building permit24 234861Closed

    Proposal for interior alterations to remove some partition walls. Unit 202.

    Dec 4, 2024 · 398 EGLINTON AVE E
  • Building permit17 229858Closed

    Proposal for teh replacement of the fire alarm panel.

    Oct 6, 2017 · 398 EGLINTON AVE E
  • Building permit10 127002Closed

    Proposal to install 1 backflow preventor in existng apartment building.

    Mar 29, 2010 · 398 EGLINTON AVE E

Check before you build

  • Site-specific exception 900.2.10(942)

    Needs a closer look

    A Chapter 900 exception applies here, but its text was not found in the City's consolidation of the by-law. Read it before relying on the rest of this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(942)Check

The exception text was not found in the City's consolidation.

Lot facts

Area
2,006 m²
Frontage
35.5 m
Depth
56.9 m
Street
Eglinton Ave E
Corner lot
Yes, also on Forman Ave56.9 m along it
Public lane
None
Max height
18 m
Max lot coverage
—
  • Major Transit Station Area: Mount Pleasant. The lot is inside the Mount Pleasant Major Transit Station Area approved by the Province (Site and Area Specific Policy 680). Source
  • Yonge-Eglinton Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Minimum frontage 9 m. Frontage is about 35.5 m: meets the zone minimum. Source
  • Zone R (f9.0; d2.0) (x942) (Residential). Chapter 10, section 10.10 of the by-law. Source

Around this lot

Minor variances approved
96%23 of 24 decisions
Garden suite permits
3
Laneway suite permits
1
Multiplex permits
2
Development applications
9

Within 300 m, last 10 years. 6 suite and multiplex permits: more than at 64% of Toronto houses (median 3). 24 variance decisions: more than at 55% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing two-storey detached dwelling by constructing a two-storey rear addition and a new rear deck.

    44 FAIRFIELD RD · Sep 17, 2026 · 207 m away
  • Minor varianceApproved

    To construct a three-storey apartment building containing six (6) dwelling units.

    406 ROEHAMPTON AVE · Sep 17, 2026 · 128 m away
  • Minor varianceApproved

    To construct an ancillary building (cabana) in the rear yard.

    32 BANFF RD · Jul 23, 2026 · 353 m away
  • Minor varianceApproved

    To construct a new porch and leading staircase in the front yard of an exisiting 2-storey semi-detached dwelling.

    24 ELVINA GDNS · Jan 22, 2026 · 450 m away
  • Minor varianceApproved

    To construct a two-storey detached dwelling and alter the use of the existing ancillary structure(garage) at the rear yard of the property.

    44 BANFF RD · Dec 4, 2025 · 330 m away

Latest activity nearby

  • Building permit

    PROPOSED TWO-STOREY REAR ADDITION AND ATTACHED GARAGE TO EXISTING DETACHED DWELLING

    44 FAIRFIELD RD · Nov 24, 2026 · 207 m away
  • Building permit

    Interior Alterations on ground Floor

    56 PETMAN AVE · Nov 18, 2026 · 171 m away
  • Building permit

    Proposed interior alterations on all levels of the existing residential builidng including the enclosure of the existing porch.

    23 FAIRFIELD RD · Nov 18, 2026 · 177 m away
  • Building permit

    REVISION-01: To remove load bearing wall and install beam at kitchen/dining.Proposal for repairs to skylight and localized reinstatement of interior finishes to match pre-loss conditions

    43 CARDIFF RD · Nov 12, 2026 · 297 m away
  • Zoning review

    Under Review

    217 BROADWAY AVE · Nov 4, 2026 · 278 m away
  • Building permitnew building, new house, secondary suite

    Proposal to demolish existing house and construct a new two-storey, two-unit detached dwelling with an attached garage.

    134 BANFF RD · Oct 26, 2026 · 289 m away
  • Building permit

    install a back water valve

    31 PETMAN AVE · Sep 24, 2026 · 249 m away
  • Minor varianceApproved

    To construct a three-storey apartment building containing six (6) dwelling units.

    406 ROEHAMPTON AVE · Sep 17, 2026 · 128 m away
  • Minor varianceApproved

    To alter the existing two-storey detached dwelling by constructing a two-storey rear addition and a new rear deck.

    44 FAIRFIELD RD · Sep 17, 2026 · 207 m away
  • Building permit

    INSTALL BACK WATER VALVE

    34 FALCON ST · Sep 9, 2026 · 271 m away

Neighbourhood: Mount Pleasant East

About the area around the lot, not the lot itself.

Nearest station
Mount Pleasant Station6 min walk
Nearest TTC stop
Eglinton Ave East at Forman Ave1 min walk
Nearest cycling route
Broadway AveSigned Route (No Pavement Markings), 4 min walk
Nearest traffic count
21,710 vehicles in 14 hEglinton Ave E / Forman Ave, 50 m away, May 6, 2025
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
Parks
Broadway Avenue Parkette6 min walk
Charlotte Maher Park7 min walk
Cudmore Creek Park8 min walk

Schools within 1 km

  • TORONTO STEM SCHOOL Private 3 min walk
  • NORTHERN SECONDARY SCHOOL English Public 6 min walk
  • EGLINTON JR PUBLIC SCHOOL English Public 7 min walk
  • MANOR MONTESSORI SCHOOL - MT PLEASANT Private 8 min walk
  • WILLOWDALE HIGH SCHOOL Private 10 min walk
  • CAREERQUEST Private 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMount Pleasant EastMedian neighbourhood
Median household income (2020)$110,000$84,500
Households that own their home55%54%
Population (2021)16,37016,813
Homes built in 1960 or before52%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMount Pleasant EastCity median
Assault336.5636.3
Robbery10.269.5
Auto theft224.4192.6
Theft over $5,00045.946.1
Break and enter204172.8
Theft from vehicles107.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.