HousePrecheckCheck an address

3975 Keele StToronto · zoning, lot size and permit records

Employment · EH 1.0 (x45)260.0 × 439.9 m103,980 m²on Keele Stcorner, also on Murray Ross Pkwy

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • Permits or applications open on this parcelStill open in the City's records: 21 156664 (Proposed this project will extend the existing foam line to the rail car facility and e..., 2021, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
260.0 m frontage439.9 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2021

    Needs a closer look

    Still open in the City's records: 21 156664 (Proposed this project will extend the existing foam line to the rail car facility and e..., 2021, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

12 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit24 205168Closed

    EXISTING SINGLE STOREY OFFICE BUILDING SANI LINE IS END OF LIFE AND NEEDS TO BE REPLACED. CIVIL DESIGN TO MINIMISE SITE DISRUPTIONS WITH THE REPLACEMENT OF A NEW SANI LINE CONNECTING TO EXISTING CITY STRUCTURE AT PROPERTY LINE. NO NEW FIXTURES OR CHANGES IN THE EXISTING DESIGN FLOWS PROPOSED (ALL EXISITNG).

    Sep 11, 2024 · 3975 KEELE ST
  • Building permit24 190736Closed

    To replace sanitary line to existing Office building, civil design to minimise site distruptions with the replacement of a new sani line connecting to existing city structure at property line. No new fixture changes int eh existing design flows

    Sep 11, 2024 · 3975 KEELE ST
  • Building permit21 156664Permit Issued

    Proposed this project will extend the existing foam line to the rail car facility and exend the existing fire water line to berm B to allow for fire fighting in event of a fire scenario.

    Sep 16, 2021 · 3975 KEELE ST
  • Building permit15 198971Closednew building

    Electrical Substation - E-House will be fabricated off-site and shipped as a self contained module. E-House will then sit on top of new structural steel support and new foundations.

    Aug 20, 2015 · 3975 KEELE ST
  • Building permit13 112759Closed

    Revision to Shell Canada - Keele Distribution Terminal - Relocate partition wall in computer room.

    Apr 9, 2013 · 3975 KEELE ST
  • Building permit11 192522Closed

    Install one backflow preventre

    Jun 1, 2011 · 3975 KEELE ST
  • Building permit10 267001Closed - Dormant

    Finch West Station TTC - Relocate 200mm Sanitary sewer

    Nov 10, 2010 · 3975 KEELE ST
  • Building permit06 193767Closed

    Construct a new storage shed at the rear

    May 22, 2008 · 3975 KEELE ST
Show 4 older records
  • Building permit07 265847Closeddemolition

    Demolition of abandoned building for shell canada ltd.

    Oct 25, 2007 · 3975 KEELE ST
  • Building permit06 181749Closed

    Interior alterations and new entrance at east elivation

    Oct 13, 2006 · 3975 KEELE ST
  • Building permit05 204282Closed - Dormant

    Drain - Construct a new building for operating ethanol unloading facility

    May 25, 2006 · 3975 KEELE ST
  • Building permit05 204278Cancellednew building

    Construct a new gas bar

    Nov 21, 2005 · 3975 KEELE ST

Check before you build

  • Site-specific exception 900.22.10(45)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.22.10(45)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Schedule 'D' Airport Hazard Map from City of North York zoning by-law 7625. © City of Toronto 1998-2026

By-law 569-2013, Chapter 900

Lot facts

Area
103,980 m²
Frontage
260 m
Depth
439.9 m
Street
Keele St
Corner lot
Yes, also on Murray Ross Pkwy439.9 m along it
Public lane
None
House footprint
2,068 m²roof up to 6.8 m
Back yard
301.1 mhouse to rear lot line
Side yards
23 m and 189 mhouse to side lot lines
Buildings on the lot
11house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone EH 1.0 (x45) (Employment Heavy Industrial). Chapter 60, section 60.30 of the by-law. Source
  • 17 City trees in front of this lot. The City's street tree inventory lists 17 trees at this address: linden, littleleaf (14 cm), linden, littleleaf (13 cm), linden, littleleaf (11 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
—no decisions on file
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    EXISTING SINGLE STOREY OFFICE BUILDING SANI LINE IS END OF LIFE AND NEEDS TO BE REPLACED. CIVIL DESIGN TO MINIMISE SITE DISRUPTIONS WITH THE REPLACEMENT OF A NEW SANI LINE CONNECTING TO EXISTING CITY STRUCTURE AT PROPERTY LINE. NO NEW FIXTURES OR CHANGES IN THE EXISTING DESIGN FLOWS PROPOSED (ALL EXISITNG).

    3975 KEELE ST · Sep 11, 2024 · 141 m away
  • Building permit

    To replace sanitary line to existing Office building, civil design to minimise site distruptions with the replacement of a new sani line connecting to existing city structure at property line. No new fixture changes int eh existing design flows

    3975 KEELE ST · Sep 11, 2024 · 141 m away
  • Building permit

    To erect and display one new third party ground sign displaying electronic static copy. The sign contains one sign face measuring approximately 2.91m x 5.79m at a height of 7.65m, directed south-westerly.***PATTISON***

    3985-3993 KEELE ST · Sep 1, 2023 · 266 m away
  • Zoning review

    Closed

    3985-3993 KEELE ST · Jul 27, 2022 · 266 m away
  • Building permit

    Proposed this project will extend the existing foam line to the rail car facility and exend the existing fire water line to berm B to allow for fire fighting in event of a fire scenario.

    3975 KEELE ST · Sep 16, 2021 · 141 m away
  • Zoning review

    Closed

    3985 KEELE ST · Aug 24, 2020 · 274 m away
  • Building permit

    To to provide for one illuminated third party ground sign at a height of 8.23 metres and containing two sign faces, in a v-shaped configuration, each displaying static copy and each directed towards south and northbound vehicular traffic along Keele Street. Each of the two sign faces is proposed to be dimensioned 6.10 metres vertically by 3.05 metres horizontally. The sign is proposed to be set back 3.0 metres from the westerly property boundary. **PATTISON OUTDOOR ADVERTISING**

    3985-3993 KEELE ST · Jul 3, 2018 · 266 m away
  • Zoning review

    Closed

    3985-3993 KEELE ST · Oct 17, 2017 · 266 m away
  • Building permit

    Addition to the existing warehouse

    3985-3993 KEELE ST · May 25, 2017 · 266 m away
  • Zoning review

    Closed

    3985-3993 KEELE ST · Mar 2, 2017 · 266 m away

Neighbourhood: York University Heights

About the area around the lot, not the lot itself.

Nearest station
Finch West Station8 min walk
Nearest TTC stop
Keele St at Murray Ross Pkwy5 min walk
Nearest cycling route
Finch Corridor TrlMulti-Use Trail, 3 min walk
Nearest traffic count
3,016 vehicles in 8 hTangiers Rd / York University Busway, 240 m away, Feb 9, 2012
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 1 with cyclists
Parks
Four Winds Allotment Gardens8 min walk
Jack Evelyn Wiggins Park8 min walk
Fountainhead Park16 min walk

Schools within 1 km

  • JAMES CARDINAL MCGUIGAN CATHOLIC HIGH SCHOOL English Separate 12 min walk
  • SENECA COLLEGE (SENECA AT YORK CAMPUS) College 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureYork University HeightsMedian neighbourhood
Median household income (2020)$76,000$84,500
Households that own their home47%54%
Population (2021)28,25516,813
Homes built in 1960 or before14%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleYork University HeightsCity median
Assault1274.1636.3
Robbery12869.5
Shootings11.910.5
Auto theft634.1192.6
Theft over $5,000178.646.1
Break and enter375.1172.8
Theft from vehicles312.6188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.