HousePrecheckCheck an address

3969 Kingston RdToronto · zoning, lot size and permit records

Residential apartment · RA (au67.0) (x604)≈ 105.4 × 184.6 m11,671 m²on Dale Avecorner, also on Kingston Rd

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 13 storeys, 174 rental units, built 1967More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelStill open in the City's records: 19 245851 (Proposed: Parking Garage Slab repairs, 2019, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 1 development application open within 300 m, up to 12 storeysNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
  • City upkeep score: 91 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N50 m
≈ 105.4 m frontage≈ 184.6 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2019

    Needs a closer look

    Still open in the City's records: 19 245851 (Proposed: Parking Garage Slab repairs, 2019, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 3 by-law investigations closed in the last two years

    Good to know

    Closed files (Property Standards): 26 194921 PRS 00 IR (Property Standards, 2026); 25 150989 PRS 00 IR (Property Standards, 2025); 24 253000 PRS 00 IR (Property Standards, 2024).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 12 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 91 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (13 storeys, 174 units, built 1967).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

12 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 194921 PRS 00 IRClosed

    Property Standards

    Jul 2, 2026 · 3969 KINGSTON RD
  • By-law investigation25 150989 PRS 00 IRClosed

    Property Standards

    Apr 29, 2025 · 3969 KINGSTON RD
  • By-law investigation24 253000 PRS 00 IRClosed

    Property Standards

    Dec 23, 2024 · 3969 KINGSTON RD
  • Building permit19 245851Permit Issued

    Proposed: Parking Garage Slab repairs

    Nov 19, 2019 · 3969 KINGSTON RD
  • Zoning review19 145408 ZPRClosed
    Apr 26, 2019 · 3969 KINGSTON RD
  • Zoning review14 152964 ZZUClosed
    May 7, 2014 · 3969 KINGSTON RD
  • Zoning review12 226375 ZPUClosed
    Aug 9, 2012 · 3969 KINGSTON RD
  • Zoning review11 148238 ZPUClosed
    Mar 18, 2011 · 3969 KINGSTON RD
Show 4 older records
  • Building permit09 183287Closed

    MGO remediation apt 1014

    Feb 16, 2010 · 3969 KINGSTON RD
  • Zoning review07 226979 ZPUClosed
    Jun 4, 2007 · 3969 KINGSTON RD
  • Zoning review06 134580 ZPUClosed
    May 12, 2006 · 3969 KINGSTON RD
  • Zoning review04 201114 ZPUClosed
    Dec 16, 2004 · 3969 KINGSTON RD

Check before you build

  • Site-specific exception 900.7.10(604)

    Needs a closer look

    6 site-specific rules apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.7.10(604)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The minimum building setback from a lot line that abuts a street is 18.0 metres

  2. Rule B

    The minimum building setback from a side lot line is a distance of half the height of the building

  3. Rule C

    A maximum of 50% of the interior floor area of the first floor may be used for dwelling units

  4. Rule D

    Parking spaces must be provided at a minimum rate of 1.0 parking spaces per dwelling unit

  5. Rule E

    Indoor amenity space must be provided at a minimum rate of 46.0 square metres for the first dwelling unit , plus an additional 0.9 square metres for each unit over 50

  6. Rule F

    The maximum lot coverage is 33%.

By-law 569-2013, Chapter 900

Lot facts

Area
11,671 m²
Frontage
105.4 mestimated, irregular lot
Depth
184.6 mestimated, irregular lot
Street
Dale Ave
Corner lot
Yes, also on Kingston Rd184.6 m along it
Public lane
None
House footprint
1,525 m²roof up to 45.9 m
Back yard
73.2 mhouse to rear lot line
Side yards
25.3 m and 60.5 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
33%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone RA (au67.0) (x604) (Residential Apartment). Chapter 15, section 15.10 of the by-law. Source
  • 9 City trees in front of this lot. The City's street tree inventory lists 9 trees at this address: maple, amur (45 cm), maple, amur (20 cm), kentucky coffeetree (10 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%4 of 4 decisions
Garden suite permits
0
Laneway suite permits
1
Multiplex permits
0
Development applications
2

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 4 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Minor varianceDeferred

    To alter the development standards for the previously approved 12-storey residential building by increasing the building height and reducing the number of three-bedroom dwelling units. Cross Reference Site Plan Application 19 184442 ESC 24 SA. NOTE: This application was previously deferred at the Committee of Adjustment heading on October 7, 2026.

    80 DALE AVE · Dec 2, 2026 · 229 m away
  • Building permitlaneway suite

    Proposal to construct a new two-storey laneway suite.See also 26-188020 ZAP 00 ZR

    279 LIVINGSTON RD · Nov 23, 2026 · 216 m away
  • Building permit

    Interior Backwater Valve

    2 LEVERHUME CRES · Sep 15, 2026 · 187 m away
  • Zoning review

    Closed

    279 LIVINGSTON RD · Jun 19, 2026 · 216 m away
  • Building permit

    Part Permit - Proposal for 12 storey (plus Mechanical Pent House) apartment building with 2 basements level

    80 DALE AVE · Jun 16, 2026 · 229 m away
  • Zoning review

    Notice Sent

    80 DALE AVE · Jun 12, 2026 · 229 m away
  • Building permitdemolition

    Proposal to demolish single family dwelling and associated shed, driveway; lands will ultimately be transfered the City for Parkland as part of an approved Land Exchange Agreement.

    66 DALE AVE · Jun 10, 2026 · 269 m away
  • Building permitdemolition

    Proposal to demolish existing SFD

    23 CROMWELL RD · May 22, 2026 · 279 m away
  • Building permitnew building, new house

    Proposal to construct a new 2 storey SFD

    23 CROMWELL RD · May 22, 2026 · 279 m away
  • Zoning review

    Closed

    80 DALE AVE · Mar 19, 2026 · 229 m away

Neighbourhood: Guildwood

About the area around the lot, not the lot itself.

Nearest station
Guildwood Station10 min walk
Nearest TTC stop
Kingston Rd at Guildwood Pkwy East Side4 min walk
Nearest cycling route
Livingston RdSigned Route (No Pavement Markings), 3 min walk
Nearest traffic count
20,060 vehicles in 8 hKingston Rd / Dale Ave, 80 m away, May 22, 2018
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Rowatson Park4 min walk
Guildwood Village Park5 min walk
Highland Creek8 min walk

Schools within 1 km

  • GUILDWOOD JR PUBLIC SCHOOL English Public 5 min walk
  • ST URSULA CATHOLIC ELEMENTARY SCHOOL English Separate 6 min walk
  • SIR WILFRID LAURIER & NATIVE LEARNING CTR EAST English Public 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureGuildwoodMedian neighbourhood
Median household income (2020)$102,000$84,500
Households that own their home78%54%
Population (2021)9,68016,813
Homes built in 1960 or before24%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleGuildwoodCity median
Assault399.4636.3
Robbery55.769.5
Shootings18.610.5
Auto theft74.3192.6
Theft over $5,00027.946.1
Break and enter55.7172.8
Theft from vehicles204.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.