HousePrecheckCheck an address

3965 Keele StToronto · zoning, lot size and permit records

103.5 × 47.5 m4,206 m²on Keele St

Not a home

Future Bus Terminal & Traffic Diversion

The City of Toronto's real estate inventory lists Future Bus Terminal & Traffic Diversion here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Transit, rail or parkingGood access, with trains, buses or cars and some noise.
  • 4 development applications open within 300 m, up to 59 storeysNew buildings may go up around here in the next years. More change nearby than at 88% of Toronto houses.
N50 m
103.5 m frontage47.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A186/11NY (This is an application to permit the construction of a new Bus Terminal-Substation Buil..., 2011).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 4 development applications open within 300 m

    Good to know

    4 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 59 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • Zoning review11 188066 PSPClosed
    Jul 23, 2015 · 3965 KEELE ST
  • Zoning review15 176485 PSPClosed
    Jun 24, 2015 · 3965 KEELE ST
  • Building permit15 163654Closeddemolition

    Demolish an existing two storey Fire Hall Station 141

    Jun 15, 2015 · 3965 KEELE ST
  • Minor varianceA186/11NYApproved

    This is an application to permit the construction of a new Bus Terminal-Substation Building as part of the Finch West Station of the Toronto-York Spadina Subway Extension..

    Apr 28, 2011 · 3965 KEELE ST
  • Development application11 180764 NNY 08 SAClosed

    Proposal for the Finch West Subway Station (8,898m2) of the Toronto-York Spadina Subway Extension. The station includes a main pedestrian entrance on the west side of Keele Street (3950 Keele Street), a bus terminal/power substation facility on the east side of Keele Street (3965 Keele Street), the station box (concourse and platform) below the Keele Street right-of-way, vent shafts in a new lot to be created at 3939 Keele Street, vent shafts within a centre median in the Keele Street right-of-way, Fire Fighter's Access hatches and a new bus-only public street north of the street (know as the Four Winds Drive extension).

    Apr 21, 2011 · 3955 KEELE ST
  • Zoning review10 230503 ZZCCancelled
    Jul 29, 2010 · 3965 KEELE ST
  • Building permit98 092577Closed

    2 UNIT HEATER

    Dec 3, 1998 · 3965 KEELE ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
4,206 m²
Frontage
103.5 m
Depth
47.5 m
Street
Keele St
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    —no decisions on file
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    6

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceRefused

      To convert unit 3, of the existing warehouse, into an indoor go-kart, recreational use.

      25 TANGIERS RD · May 21, 2026 · 376 m away
    • Minor varianceApproved

      To alter the existing commercial building by constructing a one-storey addition (storage space) on the north side of the building.

      3915 KEELE ST · Aug 14, 2025 · 372 m away
    • Minor varianceApproved

      To add office use to the list of permitted use and remove the parking requirement for office, retail, medical office and labratory use.

      1275 FINCH AVE W · Mar 6, 2025 · 313 m away
    • Minor varianceApproved

      The proposal to request a relief from minimum number of parking required for a day nursery with outdoor play areas.(The application was deferred from the hearing of 15 August 2024)

      3905 KEELE ST · Nov 7, 2024 · 414 m away
    • Minor varianceApproved

      To enclose the existing carport.

      24 ROMFIELD DR · Jan 18, 2024 · 425 m away

    Latest activity nearby

    • Building permit

      Proposal to replace existing storefront glazing with new glass overhead garage door within existing opening. No change to opening size, major occupancy or exits.

      1290 FINCH AVE W · Nov 23, 2026 · 112 m away
    • Building permit

      Proposed interior alterations to existing coffee shop (Unit B) and warehouse (Unit C) to establish a shared exit serving both units.Work includes alterations to the existing demising wall between the units, creation of a new opening with a fire-rated door assembly, construction of associated fire-rated wall assemblies, and incorporation of the existing exit from Unit C into the new shared exit arrangement. No increase in occupant load is proposed. No alterations to the existing fire protection systems are included in this permit.

      1301-1325 FINCH AVE W · Nov 18, 2026 · 228 m away
    • Building permit

      REV01: Revision to 26 238603 BLD 00 BA changes to ductless hood vent.Proposal for interior alterations to Unit 2 for a proposed bakery.

      1270 FINCH AVE W · Nov 3, 2026 · 212 m away
    • Zoning review

      Closed

      1315 FINCH AVE W · Nov 2, 2026 · 228 m away
    • Zoning review

      Cancelled

      1300 FINCH AVE W · Oct 14, 2026 · 91 m away
    • Zoning review

      Closed

      1300 FINCH AVE W · Oct 13, 2026 · 91 m away
    • Zoning review

      Application On Hold

      1300 FINCH AVE W · Oct 2, 2026 · 91 m away
    • Building permit

      REVISION - revised layoutInterior alterations to enclose existing opening.

      1325 FINCH AVE W · Oct 1, 2026 · 214 m away
    • Building permit

      Proposal to increase the occupancy load for restaurant. (Converting take-out restatrant to sit down restaurant)

      1295 FINCH AVE W · Sep 2, 2026 · 246 m away
    • Building permit

      Application to do alteration to exiting building and Proposal to Dental clinic.

      3926-3932 KEELE ST · Aug 21, 2026 · 251 m away

    Neighbourhood: York University Heights

    About the area around the lot, not the lot itself.

    Nearest station
    Finch West Station1 min walk
    Nearest TTC stop
    Finch West Station1 min walk
    Nearest cycling route
    Four Winds DrMulti-Use Trail, 1 min walk
    Nearest traffic count
    21,761 vehicles in 14 hKeele St / Four Winds Dr, 90 m away, Jan 21, 2025
    Serious collisions within 500 m
    42021–2026, killed or seriously injured: 1 fatal, 0 with pedestrians, 2 with cyclists
    Parks
    Four Winds Allotment Gardens4 min walk
    Jack Evelyn Wiggins Park8 min walk
    Fountainhead Park10 min walk

    Schools within 1 km

    • JAMES CARDINAL MCGUIGAN CATHOLIC HIGH SCHOOL English Separate 5 min walk
    • DERRYDOWN PUBLIC SCHOOL English Public 12 min walk
    • SENECA COLLEGE (SENECA AT YORK CAMPUS) College 15 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureYork University HeightsMedian neighbourhood
    Median household income (2020)$76,000$84,500
    Households that own their home47%54%
    Population (2021)28,25516,813
    Homes built in 1960 or before14%29%
    Homes needing major repairs8%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleYork University HeightsCity median
    Assault1274.1636.3
    Robbery12869.5
    Shootings11.910.5
    Auto theft634.1192.6
    Theft over $5,000178.646.1
    Break and enter375.1172.8
    Theft from vehicles312.6188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.