Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
TRCA regulated area (100% of lot)
Needs a closer lookPart of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.
What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.
How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details
Ontario Regulation 41/24, TRCA Regulation LimitRavine and natural feature protection (100% of lot)
Needs a closer lookPart of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.
What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.
How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details
Toronto Municipal Code, Chapter 6581 open by-law investigation
Needs a closer lookNot resolved in the City's records: 26 162883 PRS 00 IR (Property Standards, 2026, status Rescheduled).
What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.
How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations7 building permits open, the oldest since 2017
Needs a closer lookStill open in the City's records: 24 155635 (Proposed parking garage repairs in existing apartment building, 2024, status Permit Issued); 23 200911 (Proposal to replace the Fluid Cooler and Four Make-up Air Systems in an existing apartm..., 2023, status Permit Issued); 21 190905 (Proposal to install a sink in the laundry room of an existing residential suite - UNIT 406, 2021, status Inspection); and 4 more.
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Natural Heritage System (100% of lot)
Good to knowPart of the lot is in the Natural Heritage System shown on Official Plan Map 9.
What it means. New buildings or additions in that part need a natural heritage impact study.
How to confirm. City Planning confirms the policies that apply. Details
City of Toronto Official Plan, Map 9Work or applications in progress
Good to knowRecent records on this lot: 26 133325 (The scope of work is limited to interior alterations within the existing amenity fitnes..., 2026).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
26 records on file: more than at 100% of Toronto houses (median 0).
- Building permit26 133325Permit Issued
The scope of work is limited to interior alterations within the existing amenity fitness area of an existing condominium building classified as a Group C Residential occupancy. The proposed renovation includes the construction of two new single-user, gender-neutral washrooms, each equipped with a water closet, lavatory, and shower, to serve the existing amenity area.The amenity fitness area is intended solely for the use of residents of the condominium building.
Aug 25, 2026 · 3900 YONGE ST - By-law investigation26 176249 WST 00 IRClosed
Waste
Jun 2, 2026 · 3900 YONGE ST - By-law investigation26 162883 PRS 00 IRRescheduled
Property Standards
May 19, 2026 · 3900 YONGE ST - Building permit25 221934Closed
Proposal for material alteration/ replacement of existing fire alarm bells with new fire alarm speakers
Sep 18, 2025 · 3900 YONGE ST - Building permit25 133840Closed
REPLACEMENT OF FIRE ALARM CONTROL PANEL AND DEVICES
Apr 30, 2025 · 3900 YONGE ST - Building permit24 155635Permit Issued
Proposed parking garage repairs in existing apartment building.
Jul 29, 2024 · 3900 YONGE ST - Building permit24 149785Cancelled
Localized concrete repairs for the spiral portion of the underground parking garage along with waterproofing repairs.
May 16, 2024 · 3900 YONGE ST - Building permit24 109784Closed
Proposal for interior alterations
Feb 21, 2024 · 3900 YONGE ST
Show 18 older records
- Building permit23 200911Permit Issued
Proposal to replace the Fluid Cooler and Four Make-up Air Systems in an existing apartment building.
Oct 30, 2023 · 3900 YONGE ST - Building permit21 190905Inspection
Proposal to install a sink in the laundry room of an existing residential suite - UNIT 406
Oct 27, 2021 · 3900 YONGE ST - Building permit21 179341Permit Issued
Complete concrete repairs to balcony on the 05 line
Jul 20, 2021 · 3900 YONGE ST - Zoning review21 185381 ZPRClosedJul 16, 2021 · 3900 YONGE ST
- Building permit20 199983Closed
Demolition of select non-loadbearing interior partitions to accommodate new layout. Reconfigure bathroom layout and new partitions in suite 1015
Oct 28, 2020 · 3900 YONGE ST - Building permit20 112507Permit Issued
Waterproofing, concrete repairs and overburden placement at podium and ramp levels.
Mar 4, 2020 · 3900 YONGE ST - Building permit20 109572Closed
Interior alterations to unit 508 (106 m2) to existing residential building
Feb 25, 2020 · 3900 YONGE ST - Building permit19 144440Inspection
Proposed interior alteration to remove non load-bearing walls and replace plumbing fixtures in the kitchen
Jun 18, 2019 · 3900 YONGE ST - Building permit17 257196Closed
Replacement of the existing generator and fuel system - same size. The purpose is to replace outdated non reliable equipment.
Nov 8, 2017 · 3900 YONGE ST - Building permit17 144091Permit Issued
Balcony/Guard Repairs - Minor Concrete repairs (if required) and railing replacement during a terrace re waterproofing project.
Sep 8, 2017 · 3900 YONGE ST - Building permit17 154859Closed
To erect and display one static illuminated ground sign.**YORK MILLS PLACE**
May 19, 2017 · 3900 YONGE ST - Zoning review17 111974 ZSVClosedFeb 1, 2017 · 3900 YONGE ST
- Zoning review16 251149 ZPRClosedNov 15, 2016 · 3900 YONGE ST
- Building permit14 164459Closed
Proposed washroom renovation - addition of 4 fixtures
Jun 17, 2014 · 3900 YONGE ST - Building permit14 133062Closed
Installation of additional sink and new 1 1/4" sanitary line in washroom
Apr 14, 2014 · 3900 YONGE ST - Building permit11 282344Closed
Four inch backflow preventor
Oct 4, 2011 · 3900 YONGE ST - Building permit11 215993Closed
Repairs to 95 balconies
Jul 5, 2011 · 3900 YONGE ST - Building permit08 105122Closed
Waterproofing and garage repair
Jan 29, 2008 · 3900 YONGE ST
Check before you build
Site-specific exception 900.7.10(281)
Needs a closer look1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Older by-law A
Former City of North York by-laws 27017 and 27417.
Lot facts
- Area
- 14,043 m²
- Frontage
- 82.7 m
- Depth
- 183.5 m
- Street
- McGlashan Rd
- Corner lot
- Yes, also on Yonge St183.5 m along it
- Public lane
- None
- Max height
- —
- Max lot coverage
- 35%
- Major Transit Station Area: York Mills. The lot is inside the York Mills Major Transit Station Area approved by the Province (Site and Area Specific Policy 639). Source
- Minimum frontage 30 m. Frontage is about 82.7 m: meets the zone minimum. Source
- Minimum lot area 1375 m². Lot area is 14,043 m²: meets the minimum. Source
- Zone RA (f30.0; a1375) (x281) (Residential Apartment). Chapter 15, section 15.10 of the by-law. Source
- 36 City trees in front of this lot. The City's street tree inventory lists 36 trees at this address: maple, sugar (67 cm), spruce, colorado blue (32 cm), maple, norway crimson king (32 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 100%5 of 5 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 0
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 5 variance decisions: no more than at most Toronto houses (median 19).
Latest activity nearby
- Building permit
Rear yard deck
55 MASON BLVD · Nov 17, 2026 · 291 m away - Building permit
The scope of work is limited to interior alterations within the existing amenity fitness area of an existing condominium building classified as a Group C Residential occupancy. The proposed renovation includes the construction of two new single-user, gender-neutral washrooms, each equipped with a water closet, lavatory, and shower, to serve the existing amenity area.The amenity fitness area is intended solely for the use of residents of the condominium building.
3900 YONGE ST · Aug 25, 2026 · 20 m away - Minor varianceApproved
To alter the existing detached dwelling by constructing a new rear deck.
55 MASON BLVD · Jul 9, 2026 · 291 m away - Building permit
Proposal to install one (1) 30x80' frame temporary tent (cert #15 159498). Installation: Friday, June 5, 2026 and dismantle on Sunday, June 7, 2026
3865 YONGE ST · Jun 5, 2026 · 250 m away - Building permit
Back water valve installation.
57 MASON BLVD · May 12, 2026 · 281 m away - Zoning review
Closed
55 MASON BLVD · Apr 29, 2026 · 291 m away - Zoning review
Pending Cancellation
17 EASTVIEW CRES · Mar 24, 2026 · 171 m away - Building permit
REV : Proposed revision includes deletion of pit ladder, new davit arms & fall arrest anchors and new and updated details.Replacement of pit cover and pit ladders and new pit gratings at various locations at TTC's York Mills Station
4015 YONGE ST · Dec 31, 2025 · 253 m away - Building permit
Proposal for material alteration/ replacement of existing fire alarm bells with new fire alarm speakers
3900 YONGE ST · Sep 18, 2025 · 20 m away - Building permit
Proposal to install Back Water Valve
39 MCGLASHAN RD · Aug 11, 2025 · 261 m away
Neighbourhood: Bedford Park-Nortown
About the area around the lot, not the lot itself.
- Nearest station
- York Mills Station7 min walk
- Nearest TTC stop
- Yonge St at Mcglashan Rd South Side1 min walk
- Nearest cycling route
- York Mills Valley Park TrlMulti-Use Trail - Connector, 3 min walk
- Nearest traffic count
- 16,656 vehicles in 8 hYonge St / McGlashan Rd / Jolly Miller Park Trl, 100 m away, Aug 24, 2022
- Serious collisions within 500 m
- 12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
- Parks
- Jolly Miller Park2 min walk
- York Mills Valley Park2 min walk
- York Mills Park3 min walk
Schools within 1 km
- LORETTO ABBEY CATHOLIC SECONDARY SCHOOL English Separate 5 min walk
- THE DUNBLAINE SCHOOL Private 14 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Bedford Park-Nortown | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $135,000 | $84,500 |
| Households that own their home | 68% | 54% |
| Population (2021) | 22,145 | 16,813 |
| Homes built in 1960 or before | 33% | 29% |
| Homes needing major repairs | 5% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Bedford Park-Nortown | City median |
|---|---|---|
| Assault | 230.1 | 636.3 |
| Robbery | 59.5 | 69.5 |
| Auto theft | 150.8 | 192.6 |
| Theft over $5,000 | 67.4 | 46.1 |
| Break and enter | 250 | 172.8 |
| Theft from vehicles | 198.4 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.