HousePrecheckCheck an address

390 George StToronto · zoning, lot size and permit records

Also 325 Jarvis St

Commercial residential · CR 3.5 (c2.0; r2.0) SS2 (x1604)≈ 35.4 × 69.6 m1,805 m²on George St

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.2 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • 7 development applications open within 300 m, up to 60 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: CollegeThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
≈ 35.4 m frontage≈ 69.6 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 by-law investigation closed in the last two years

    Good to know

    Closed files (Property Standards): 26 233052 PRS 00 IR (Property Standards, 2026).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 7 development applications open within 300 m

    Good to know

    7 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 60 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

4 records on file: more than at 88% of Toronto houses (median 0).

  • By-law investigation26 233052 PRS 00 IRClosed

    Property Standards

    Sep 4, 2026 · 390 GEORGE ST
  • By-law investigation26 109874 WST 00 IRClosed

    Waste

    Jan 28, 2026 · 325 JARVIS ST
  • By-law investigation25 200385 WST 00 IRClosed

    Waste

    Jul 25, 2025 · 325 JARVIS ST
  • Building permit10 203333Closed

    Proposal to install 1 backflow prevention device in an existing multi residential townhouse condo.Convenience address is 325 Jarvis St.

    Jun 25, 2010 · 390 GEORGE ST

Check before you build

  • Site-specific exception 900.11.10(1604)

    Needs a closer look

    6 site-specific rules and 6 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(1604)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    On the lands, a parking facility is only permitted, if: (i) it is located on the same lot as a residential building , non-residential building , or a mixed use building ; and (ii) it has no more than 125% of the number of parking spaces required to be provided for the building on the lot ; and [TO: 438-86; 12 (2) 80]

  2. Rule B

    The angular plane requirements of regulations 40.10.40.70(2)(D) and (E) do not apply to a building or structure that complies with the permitted maximum height as set out in regulation 40.10.40.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(1) 66 of former City of Toronto By-law 438-86; (B) Section 12(1) 232 of former City of Toronto By-law 438-86

  3. Rule C

    Section 12(2) 132 of former City of Toronto By-law 438-86

  4. Rule D

    Section 12(2) 207 of former City of Toronto By-law 438-86

  5. Rule E

    Section 12(2) 256 of former City of Toronto By-law 438-86

  6. Rule F

    Section 12(2) 270(a) of former City of Toronto By-law 438-86.

  7. Older by-law A

    On the lands, a parking facility is only permitted, if: (i) it is located on the same lot as a residential building , non-residential building , or a mixed use building ; and (ii) it has no more than 125% of the number of parking spaces required to be provided for the building on the lot ; and [TO: 438-86; 12 (2) 80]

  8. Older by-law B

    The angular plane requirements of regulations 40.10.40.70(2)(D) and (E) do not apply to a building or structure that complies with the permitted maximum height as set out in regulation 40.10.40.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(1) 66 of former City of Toronto By-law 438-86; (B) Section 12(1) 232 of former City of Toronto By-law 438-86

  9. Older by-law C

    Section 12(2) 132 of former City of Toronto By-law 438-86

  10. Older by-law D

    Section 12(2) 207 of former City of Toronto By-law 438-86

  11. Older by-law E

    Section 12(2) 256 of former City of Toronto By-law 438-86

  12. Older by-law F

    Section 12(2) 270(a) of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
1,805 m²
Frontage
35.4 mestimated, irregular lot
Depth
69.6 mestimated, irregular lot
Street
George St
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—
  • Major Transit Station Area: College. The lot is inside the College Major Transit Station Area approved by the Province (Site and Area Specific Policy 603). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 3.5 (c2.0; r2.0) SS2 (x1604) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
100%11 of 11 decisions
Garden suite permits
0
Laneway suite permits
1
Multiplex permits
7
Development applications
24

Within 300 m, last 10 years. 8 suite and multiplex permits: more than at 70% of Toronto houses (median 3). 11 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing two-and-one-half semi-detached building (houseplex), which is currently under construction (Building Permit 25 258356 BLD), by constructing a side (east) basement walkout with a flat roof canopy. Also, to maintain the existing rear second storey roof deck with stairs, and third storey roof deck. There will be two existing units and two new units for a total of four residential dwelling units on this lot (one unit occupying the basement level, two units occupying the first level, and one unit occupying the second and third levels).

    183 CARLTON ST · Jul 22, 2026 · 478 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.

    212 DUNDAS ST E · Jul 15, 2026 · 297 m away
  • Minor varianceApproved

    To alter the existing three-storey mixed-use building by converting the storage room on the second and third levels into seven additional hostel suites (three on the second level, and four on the third level). The existing pharmacy and cafeteria on the ground level, 19 hostel suites on the second level, and 20 hostel suites on the third level will be maintained and unaltered.

    311 SHERBOURNE ST · Jun 3, 2026 · 308 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1017-2022), for the 53-storey mixed-use building, by reducing the non-residential space, and the number of short-term bicycle parking spaces required on-site. There will be a total of 591 residential dwelling units on this site. This is currently under the review of Site Plan Control (File No. 21 206338 STE 13 SA).

    241 CHURCH ST · Jul 30, 2025 · 393 m away
  • Minor varianceApproved

    To alter the existing three-storey apartment building (containing 35 rental dwelling units) by converting the basement level (storage rooms and building management office) and a portion of the ground floor (vacant space) into an additional 11 rental dwelling units. There will be a total of 46 rental dwelling units on this lot.

    134 CARLTON ST · Jul 9, 2025 · 327 m away

Latest activity nearby

  • Building permit

    Installation of new vertical condensate drain risers to collect condensate from existing piping outlets at the balconies

    145 MUTUAL ST · Nov 20, 2026 · 146 m away
  • Building permit

    1 Wall Sign***** T-DOT DENTAL*****

    306 JARVIS ST · Nov 17, 2026 · 222 m away
  • Zoning review

    Closed

    66 GERRARD ST E · Nov 9, 2026 · 300 m away
  • Zoning review

    Not Started

    66 GERRARD ST E · Nov 4, 2026 · 300 m away
  • Building permit

    REVISION-01Proposal for interior alterations to existing vacant suite for new crisis centre - "Gerstein Crisis Centre"

    355 CHURCH ST · Oct 30, 2026 · 274 m away
  • Building permit

    Proposal to install a maglock in existing office space.

    355 CHURCH ST · Oct 28, 2026 · 274 m away
  • Building permit

    Proposal to construct pedestrian ramp.

    117 PEMBROKE ST · Oct 27, 2026 · 187 m away
  • Building permit

    Proposed storage addition on the parking area in the building

    105 CARLTON ST · Oct 15, 2026 · 280 m away
  • Minor varianceApproved

    To construct a new four-storey apartment building with a west side courtyard area at the centre of the building, a front (north) green roof, and a maintenance equipment storage area on the roof level. There will be a total of 17 bicycle parking spaces on the lot and no vehicular parking spaces will be provided. Also, to construct a rear one-storey detached ancillary building (waste storage enclosure) on the southwest corner on the lot. There will be a total of 15 residential dwelling units (12 studio units and 3 one bedroom units) on the lot.

    185 GERRARD ST E · Oct 14, 2026 · 202 m away
  • Building permit

    Proposal to replace roof top mounted mechanical units.

    311 JARVIS ST · Oct 1, 2026 · 89 m away

Neighbourhood: Moss Park

About the area around the lot, not the lot itself.

Nearest station
TMU Station10 min walk
Nearest TTC stop
Sherbourne St at Gerrard St East4 min walk
Nearest cycling route
Gerrard St ECycle Track, 1 min walk
Nearest traffic count
6,419 vehicles in 8 hGerrard St E / George St, 70 m away, Sep 19, 2018
Serious collisions within 500 m
192021–2026, killed or seriously injured: 2 fatal, 15 with pedestrians, 2 with cyclists
Parks
Allan Gardens1 min walk
Montague Parkette6 min walk
Arena Gardens7 min walk

Schools within 1 km

  • LE COLLEGE FRANCAIS - CARLTON CAMPUS Private 6 min walk
  • TAIE INTERNATIONAL INSTITUTE SCHOOL Private 6 min walk
  • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 6 min walk
  • TORONTO METROPOLITAN UNIVERSITY - THEATRE SCHOOL University 6 min walk
  • TMU - HEIDELBERG CENTRE SCHOOL OF GRAPHIC COMM'NS MGMT University 6 min walk
  • NATIONAL BALLET SCHOOL - MARGARET MCCAIN ACEDEMIC CENTRE Private 6 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMoss ParkMedian neighbourhood
Median household income (2020)$65,000$84,500
Households that own their home35%54%
Population (2021)21,49016,813
Homes built in 1960 or before17%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMoss ParkCity median
Assault2226.8636.3
Robbery166.669.5
Homicide3.45.3
Shootings3.410.5
Auto theft81.6192.6
Theft over $5,00064.646.1
Break and enter350.2172.8
Theft from vehicles275.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.