HousePrecheckCheck an address

3885 Yonge StToronto · zoning, lot size and permit records

Also 3995 Yonge St

Open space · ON (x3)≈ 121.5 × 170.3 m14,949 m²on Mill Stcorner, also on Yonge St

Not a home

Carpark 414

The City of Toronto's real estate inventory lists Carpark 414 here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Transit, rail or parkingGood access, with trains, buses or cars and some noise.
  • Permits or applications open on this parcelStill open in the City's records: 18 119540 (REVISION - to upgrade sprinkler protection to include covered patioProposal for interio..., 2018, status Revision Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 m, up to 12 storeysNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
  • 1 open by-law investigation at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 26 222349 ZON 00 IR (Zoning, 2026, status Rescheduled).
  • Major Transit Station Area: York MillsThe City plans more homes around the station: good for transit, and more building over time.
N50 m
≈ 121.5 m frontage≈ 170.3 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: designated (Part IV)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • TRCA regulated area (100% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (100% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • 1 open by-law investigation

    Needs a closer look

    Not resolved in the City's records: 26 222349 ZON 00 IR (Zoning, 2026, status Rescheduled).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Building permit open since 2018

    Needs a closer look

    Still open in the City's records: 18 119540 (REVISION - to upgrade sprinkler protection to include covered patioProposal for interio..., 2018, status Revision Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Natural Heritage System (100% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 12 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

9 records on file: more than at 99% of Toronto houses (median 0).

  • By-law investigation26 222349 ZON 00 IRRescheduled

    Zoning

    Aug 19, 2026 · 3885 YONGE ST
  • Zoning review25 196256 ZAPApplicable Law Pending
    Jul 18, 2025 · 3885 YONGE ST
  • Building permit18 119540Revision Issued

    REVISION - to upgrade sprinkler protection to include covered patioProposal for interior alterations to the basement and ground floor for miscellaneous building life safety upgrades, including fire stopping at rear assemblies and exit door hardware upgrades to the existing restaurant greater than 30 seats.

    May 30, 2018 · 3885 YONGE ST
  • Building permit14 214437Closed

    Proposal to install one backflow prevention device

    Sep 8, 2014 · 3885 YONGE ST
  • Zoning review04 129838 LTOClosed
    May 3, 2004 · 3885 YONGE ST
  • Zoning review04 116776 ZSVClosed
    Mar 16, 2004 · 3885 YONGE ST
  • Building permit03 104598Closed

    Revision to structural changes.

    Mar 5, 2004 · 3885 YONGE ST
  • Zoning review03 105943 PSPClosed
    Feb 3, 2003 · 3885 YONGE ST
Show 1 older records
  • Building permit98 251579Closed

    1 BFP 1 METER

    Jul 9, 1998 · 3885 YONGE ST

Check before you build

  • Site-specific exception 900.41.10(3)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.41.10(3)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 64.37(18) of the former City of North York zoning by-law 7625.

By-law 569-2013, Chapter 900

Lot facts

Area
14,949 m²
Frontage
121.5 mestimated, irregular lot
Depth
170.3 mestimated, irregular lot
Street
Mill St
Corner lot
Yes, also on Yonge St170.3 m along it
Public lane
None
House footprint
583 m²roof up to 13.3 m
Back yard
124.9 mhouse to rear lot line
Side yards
0.4 m and 97.1 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Site and Area Specific Policy 081. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Major Transit Station Area: York Mills. The lot is inside the York Mills Major Transit Station Area approved by the Province (Site and Area Specific Policy 639). Source
  • Zone ON (x3) (Open Space Natural). Chapter 90, section 90.20 of the by-law. Source
  • 6 City trees in front of this lot. The City's street tree inventory lists 6 trees at this address: maple, freeman armstrong (34 cm), maple, freeman armstrong (33 cm), maple, freeman armstrong (31 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
83%10 of 12 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
2

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 12 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    INSTALLATION OF SOLAR PANEL ON ROOF TOP OF THE HOUSE

    45 DONINO AVE · Oct 21, 2026 · 272 m away
  • Building permitnew building, new house

    REV 02: Revision to permit to remove the 2 h fire-resistance rating of the floor and supporting members between Basement (B1) and Sub-Basement (B2), and the 1.5 h fire-rated doors at the sub-basement stairs. Refer to cover letterProposal to construct a new two storey home with a basement walkout and sub basement.

    3 OLD YONGE ST · Oct 13, 2026 · 174 m away
  • Building permit

    The scope of work is limited to interior alterations within the existing amenity fitness area of an existing condominium building classified as a Group C Residential occupancy. The proposed renovation includes the construction of two new single-user, gender-neutral washrooms, each equipped with a water closet, lavatory, and shower, to serve the existing amenity area.The amenity fitness area is intended solely for the use of residents of the condominium building.

    3900 YONGE ST · Aug 25, 2026 · 121 m away
  • Building permit

    Proposal to install one (1) 30x80' frame temporary tent (cert #15 159498). Installation: Friday, June 5, 2026 and dismantle on Sunday, June 7, 2026

    3865 YONGE ST · Jun 5, 2026 · 206 m away
  • Zoning review

    Pending Cancellation

    17 EASTVIEW CRES · Mar 24, 2026 · 251 m away
  • Building permit

    REV : Proposed revision includes deletion of pit ladder, new davit arms & fall arrest anchors and new and updated details.Replacement of pit cover and pit ladders and new pit gratings at various locations at TTC's York Mills Station

    4015 YONGE ST · Dec 31, 2025 · 228 m away
  • Building permit

    Proposal for material alteration/ replacement of existing fire alarm bells with new fire alarm speakers

    3900 YONGE ST · Sep 18, 2025 · 121 m away
  • Zoning review

    Applicable Law Pending

    3885 YONGE ST · Jul 18, 2025 · 65 m away
  • Building permit

    Proposal to install one (1) 30x80' frame temporary tent (cert #15159498). Installation on Friday, June 6, 2025 and dismantle on Sunday, June 8, 2025.

    3865 YONGE ST · May 26, 2025 · 206 m away
  • Building permit

    Proposal for localized roof slab and waterproofing repairs to the underground parking garage.

    4000 YONGE ST · May 5, 2025 · 183 m away

Neighbourhood: Bridle Path-Sunnybrook-York Mills

About the area around the lot, not the lot itself.

Nearest station
York Mills Station7 min walk
Nearest TTC stop
Yonge St at Mcglashan Rd1 min walk
Nearest cycling route
York Mills Valley Park TrlMulti-Use Trail - Connector, 1 min walk
Nearest traffic count
16,656 vehicles in 8 hYonge St / McGlashan Rd / Jolly Miller Park Trl, 110 m away, Aug 24, 2022
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
Parks
Jolly Miller Park1 min walk
York Mills Park1 min walk
York Mills Valley Park1 min walk

Schools within 1 km

  • LORETTO ABBEY CATHOLIC SECONDARY SCHOOL English Separate 8 min walk
  • THE DUNBLAINE SCHOOL Private 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureBridle Path-Sunnybrook-York MillsMedian neighbourhood
Median household income (2020)$222,000$84,500
Households that own their home89%54%
Population (2021)8,94016,813
Homes built in 1960 or before22%29%
Homes needing major repairs3%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleBridle Path-Sunnybrook-York MillsCity median
Assault205.9636.3
Robbery51.569.5
Shootings17.210.5
Auto theft197.4192.6
Theft over $5,00034.346.1
Break and enter403.3172.8
Theft from vehicles163188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.