Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Heritage property: designated (Part IV)
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage RegisterTRCA regulated area (100% of lot)
Needs a closer lookPart of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.
What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.
How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details
Ontario Regulation 41/24, TRCA Regulation LimitRavine and natural feature protection (100% of lot)
Needs a closer lookPart of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.
What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.
How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details
Toronto Municipal Code, Chapter 6581 open by-law investigation
Needs a closer lookNot resolved in the City's records: 26 222349 ZON 00 IR (Zoning, 2026, status Rescheduled).
What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.
How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigationsBuilding permit open since 2018
Needs a closer lookStill open in the City's records: 18 119540 (REVISION - to upgrade sprinkler protection to include covered patioProposal for interio..., 2018, status Revision Issued).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Natural Heritage System (100% of lot)
Good to knowPart of the lot is in the Natural Heritage System shown on Official Plan Map 9.
What it means. New buildings or additions in that part need a natural heritage impact study.
How to confirm. City Planning confirms the policies that apply. Details
City of Toronto Official Plan, Map 92 development applications open within 300 m
Good to know2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 12 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
9 records on file: more than at 99% of Toronto houses (median 0).
- By-law investigation26 222349 ZON 00 IRRescheduled
Zoning
Aug 19, 2026 · 3885 YONGE ST - Zoning review25 196256 ZAPApplicable Law PendingJul 18, 2025 · 3885 YONGE ST
- Building permit18 119540Revision Issued
REVISION - to upgrade sprinkler protection to include covered patioProposal for interior alterations to the basement and ground floor for miscellaneous building life safety upgrades, including fire stopping at rear assemblies and exit door hardware upgrades to the existing restaurant greater than 30 seats.
May 30, 2018 · 3885 YONGE ST - Building permit14 214437Closed
Proposal to install one backflow prevention device
Sep 8, 2014 · 3885 YONGE ST - Zoning review04 129838 LTOClosedMay 3, 2004 · 3885 YONGE ST
- Zoning review04 116776 ZSVClosedMar 16, 2004 · 3885 YONGE ST
- Building permit03 104598Closed
Revision to structural changes.
Mar 5, 2004 · 3885 YONGE ST - Zoning review03 105943 PSPClosedFeb 3, 2003 · 3885 YONGE ST
Show 1 older records
- Building permit98 251579Closed
1 BFP 1 METER
Jul 9, 1998 · 3885 YONGE ST
Check before you build
Site-specific exception 900.41.10(3)
Needs a closer look1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Older by-law A
Section 64.37(18) of the former City of North York zoning by-law 7625.
Lot facts
- Area
- 14,949 m²
- Frontage
- 121.5 mestimated, irregular lot
- Depth
- 170.3 mestimated, irregular lot
- Street
- Mill St
- Corner lot
- Yes, also on Yonge St170.3 m along it
- Public lane
- None
- House footprint
- 583 m²roof up to 13.3 m
- Back yard
- 124.9 mhouse to rear lot line
- Side yards
- 0.4 m and 97.1 mhouse to side lot lines
- Buildings on the lot
- 2house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Site and Area Specific Policy 081. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
- Major Transit Station Area: York Mills. The lot is inside the York Mills Major Transit Station Area approved by the Province (Site and Area Specific Policy 639). Source
- Zone ON (x3) (Open Space Natural). Chapter 90, section 90.20 of the by-law. Source
- 6 City trees in front of this lot. The City's street tree inventory lists 6 trees at this address: maple, freeman armstrong (34 cm), maple, freeman armstrong (33 cm), maple, freeman armstrong (31 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 83%10 of 12 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 2
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 12 variance decisions: no more than at most Toronto houses (median 19).
Latest activity nearby
- Building permit
INSTALLATION OF SOLAR PANEL ON ROOF TOP OF THE HOUSE
45 DONINO AVE · Oct 21, 2026 · 272 m away - Building permit
REV 02: Revision to permit to remove the 2 h fire-resistance rating of the floor and supporting members between Basement (B1) and Sub-Basement (B2), and the 1.5 h fire-rated doors at the sub-basement stairs. Refer to cover letterProposal to construct a new two storey home with a basement walkout and sub basement.
3 OLD YONGE ST · Oct 13, 2026 · 174 m away - Building permit
The scope of work is limited to interior alterations within the existing amenity fitness area of an existing condominium building classified as a Group C Residential occupancy. The proposed renovation includes the construction of two new single-user, gender-neutral washrooms, each equipped with a water closet, lavatory, and shower, to serve the existing amenity area.The amenity fitness area is intended solely for the use of residents of the condominium building.
3900 YONGE ST · Aug 25, 2026 · 121 m away - Building permit
Proposal to install one (1) 30x80' frame temporary tent (cert #15 159498). Installation: Friday, June 5, 2026 and dismantle on Sunday, June 7, 2026
3865 YONGE ST · Jun 5, 2026 · 206 m away - Zoning review
Pending Cancellation
17 EASTVIEW CRES · Mar 24, 2026 · 251 m away - Building permit
REV : Proposed revision includes deletion of pit ladder, new davit arms & fall arrest anchors and new and updated details.Replacement of pit cover and pit ladders and new pit gratings at various locations at TTC's York Mills Station
4015 YONGE ST · Dec 31, 2025 · 228 m away - Building permit
Proposal for material alteration/ replacement of existing fire alarm bells with new fire alarm speakers
3900 YONGE ST · Sep 18, 2025 · 121 m away - Zoning review
Applicable Law Pending
3885 YONGE ST · Jul 18, 2025 · 65 m away - Building permit
Proposal to install one (1) 30x80' frame temporary tent (cert #15159498). Installation on Friday, June 6, 2025 and dismantle on Sunday, June 8, 2025.
3865 YONGE ST · May 26, 2025 · 206 m away - Building permit
Proposal for localized roof slab and waterproofing repairs to the underground parking garage.
4000 YONGE ST · May 5, 2025 · 183 m away
Neighbourhood: Bridle Path-Sunnybrook-York Mills
About the area around the lot, not the lot itself.
- Nearest station
- York Mills Station7 min walk
- Nearest TTC stop
- Yonge St at Mcglashan Rd1 min walk
- Nearest cycling route
- York Mills Valley Park TrlMulti-Use Trail - Connector, 1 min walk
- Nearest traffic count
- 16,656 vehicles in 8 hYonge St / McGlashan Rd / Jolly Miller Park Trl, 110 m away, Aug 24, 2022
- Serious collisions within 500 m
- 12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
- Parks
- Jolly Miller Park1 min walk
- York Mills Park1 min walk
- York Mills Valley Park1 min walk
Schools within 1 km
- LORETTO ABBEY CATHOLIC SECONDARY SCHOOL English Separate 8 min walk
- THE DUNBLAINE SCHOOL Private 14 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Bridle Path-Sunnybrook-York Mills | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $222,000 | $84,500 |
| Households that own their home | 89% | 54% |
| Population (2021) | 8,940 | 16,813 |
| Homes built in 1960 or before | 22% | 29% |
| Homes needing major repairs | 3% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Bridle Path-Sunnybrook-York Mills | City median |
|---|---|---|
| Assault | 205.9 | 636.3 |
| Robbery | 51.5 | 69.5 |
| Shootings | 17.2 | 10.5 |
| Auto theft | 197.4 | 192.6 |
| Theft over $5,000 | 34.3 | 46.1 |
| Break and enter | 403.3 | 172.8 |
| Theft from vehicles | 163 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.