HousePrecheckCheck an address

3875 Sheppard Ave EToronto · zoning, lot size and permit records

Residential apartment commercial · RAC (au41.7) (x38)≈ 115.6 × 123.4 m9,950 m²on Sheppard Ave E

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 14 storeys, 154 rental units, built 1960More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelRecent records on this lot: 25 185149 ESC 22 SB (The proposed development includes 4 new infill towers buildings with heights of 49-, 44..., 2025); 25 185206 ESC 22 OZ (The proposed development includes 4 new infill towers buildings with heights of 49-, 44..., 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 5 development applications open within 300 m, up to 17 storeysNew buildings may go up around here in the next years. More change nearby than at 95% of Toronto houses.
  • City upkeep score: 94 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: AgincourtThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N50 m
≈ 115.6 m frontage≈ 123.4 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2015

    Needs a closer look

    Still open in the City's records: 22 178631 (Proposal to replce the exisitng fire alarm system control panel and annunciator panel w..., 2022, status Inspection); 15 240936 (install backflow preventer, 2015, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards): 26 170438 000 00 IR (Adequate Heat, 2026); 26 170437 000 00 IR (Property Standards, 2026).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 25 185149 ESC 22 SB (The proposed development includes 4 new infill towers buildings with heights of 49-, 44..., 2025); 25 185206 ESC 22 OZ (The proposed development includes 4 new infill towers buildings with heights of 49-, 44..., 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 2 Committee of Adjustment files on this lot

    Good to know

    2 approved. A017/16SC (To construct a new ramp enclosure addition to the existing underground parking ramp, 2016); A077/00SC (ADDING 2 SUITES ON GROUND FLOOR Assigned to Rod Hines (396-7020), 2000).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 5 development applications open within 300 m

    Good to know

    5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 17 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 94 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (14 storeys, 154 units, built 1960).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

18 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 170438 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 3875 SHEPPARD AVE E
  • By-law investigation26 170437 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 3875 SHEPPARD AVE E
  • Zoning review25 185206 POZClosed
    Nov 21, 2025 · 3875 SHEPPARD AVE E
  • Zoning review25 185149 PSBClosed
    Nov 21, 2025 · 3875 SHEPPARD AVE E
  • Development application25 185149 ESC 22 SBUnder Review

    The proposed development includes 4 new infill towers buildings with heights of 49-, 44-, 31- and 17-storeys, along with the retention of the existing 17-storey building at 2250 Kennedy Road. The subject site will be divided into four blocks including the new north-south road, two new parks and the central development block. The proposal is currently anticipated to be purpose-built rental.

    Jun 27, 2025 · 3875 SHEPPARD AVE E · City file
  • Development application25 185206 ESC 22 OZUnder Review

    The proposed development includes 4 new infill towers buildings with heights of 49-, 44-, 31- and 17-storeys, along with the retention of the existing 17-storey building at 2250 Kennedy Road. The subject site will be divided into four blocks including the new north-south road, two new parks and the central development block. The proposal is currently anticipated to be purpose-built rental.

    Jun 27, 2025 · 3875 SHEPPARD AVE E · City file
  • Building permit22 178631Inspection

    Proposal to replce the exisitng fire alarm system control panel and annunciator panel with new. Reconnecting all existing alarm and supervisory zones to the new panel. Connecting the existing suite horns to the new panel

    Aug 19, 2022 · 3875 SHEPPARD AVE E
  • Building permit16 185350Closed

    Proposal to construct new enclosed parking garage ramp in existing apartment building.

    Aug 4, 2016 · 3875 SHEPPARD AVE E
Show 10 older records
  • Minor varianceA017/16SCApproved

    To construct a new ramp enclosure addition to the existing underground parking ramp.

    Mar 17, 2016 · 3875 SHEPPARD AVE E
  • Building permit15 240936Permit Issued

    install backflow preventer

    Nov 13, 2015 · 3875 SHEPPARD AVE E
  • Zoning review15 244346 ZZCClosed
    Oct 29, 2015 · 3875 SHEPPARD AVE E
  • Building permit10 157283Closed

    MGO remediation

    Jun 28, 2010 · 3875 SHEPPARD AVE E
  • Building permit10 157276Closed

    MGO remediation

    Jun 28, 2010 · 3875 SHEPPARD AVE E
  • Building permit10 157268Closed

    MGO remediation

    Jun 28, 2010 · 3875 SHEPPARD AVE E
  • Building permit07 233193Closed

    VEHILCLE IMPACT DAMAGE-REPAIR TO EXISTING BUILD. @ EXT. WALL WITHIN UNIT 109

    Jul 4, 2007 · 3875 SHEPPARD AVE E
  • Building permit00 353878Closed

    RENOVATE EXISTING STORAGE SPACE INTO BACHELOR APTS. C OF A NO. A77/00SC

    Dec 19, 2000 · 3875 SHEPPARD AVE E
  • Minor varianceA077/00SCApproved

    ADDING 2 SUITES ON GROUND FLOOR Assigned to Rod Hines (396-7020)

    Aug 16, 2000 · 3875 SHEPPARD AVE E
  • Building permit98 200795Closed

    FIRE ALARM

    Oct 2, 1998 · 3875 SHEPPARD AVE E

Check before you build

  • Site-specific exception 900.8.10(38)

    Needs a closer look

    12 site-specific rules apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.8.10(38)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The minimum building setback from a front lot line that abuts a street is: (i) 36.0 metres measured from the original centre line of the street if the front lot line abuts Sheppard Ave. or Kennedy Rd.; and (ii) 12.0 metres in all other cases

  2. Rule B

    The minimum building setback from a side lot line and rear lot line is a distance equal to the greater of: (i) half the height of the building ; or (ii) half the length of the building

  3. Rule C

    The minimum building setback from a lot line that abuts a lot in an RD or RS zone is 15.0 metres

  4. Rule D

    The minimum separation between the main walls of two residential buildings on the same lot is a distance equal to half the total combined height of the two buildings

  5. Rule E

    A minimum of 50% of the lot area must be landscaping

  6. Rule F

    Amenity space must be provided in each building at a minimum rate of 46 square metres for the first dwelling unit plus 0.9 square metres for each dwelling unit in excess of 50

  7. Rule G

    The maximum lot coverage is 18%

  8. Rule H

    Parking spaces must be provided at a minimum rate of 1.125 for each dwelling unit

  9. Rule I

    A minimum of 75% of all parking spaces must be underground

  10. Rule J

    A minimum of 11% of the parking spaces must be for visitors

  11. Rule K

    The minimum building setback from a lot line for a below grade parking structure is a distance equal to half the vertical distance from the lowest floor of the structure to the average elevation of grade at the front lot line

  12. Rule L

    The maximum building height is 54.0 metres.

By-law 569-2013, Chapter 900

Lot facts

Area
9,950 m²
Frontage
115.6 mestimated, irregular lot
Depth
123.4 mestimated, irregular lot
Street
Sheppard Ave E
Corner lot
No
Public lane
None
House footprint
1,231 m²roof up to 42.5 m
Back yard
84.4 mhouse to rear lot line
Side yards
23.2 m and 23.4 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Agincourt. The lot is inside the Agincourt Major Transit Station Area approved by the Province (Site and Area Specific Policy 694). Source
  • Agincourt Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone RAC (au41.7) (x38) (Residential Apartment Commercial). Chapter 15, section 15.20 of the by-law. Source

Around this lot

Minor variances approved
89%8 of 9 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
0
Development applications
10

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 9 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Zoning review

    Not Started

    2351 KENNEDY RD · Nov 5, 2026 · 266 m away
  • Building permitdemolition

    Complete demolition of the existing vacant single-family dwelling to facilitate future construction of a multi-unit townhouse development.

    3 COLLINGWOOD ST · Nov 3, 2026 · 269 m away
  • Building permitdemolition

    Complete demolition of the existing vacant single-family dwelling to facilitate future construction of a multi-unit townhouse development.

    7 COLLINGWOOD ST · Nov 3, 2026 · 295 m away
  • Building permitdemolition

    Complete demolition of the existing vacant single-family dwelling to facilitate future construction of a multi-unit townhouse development.

    5 COLLINGWOOD ST · Nov 3, 2026 · 285 m away
  • Building permit

    Proposed unheated front porch enclosure.

    56 DEMPSTER ST · Oct 15, 2026 · 209 m away
  • Building permitsecondary suite

    Proposal for interior alterations to create a secondary suite

    138 EARLTON RD · Jul 27, 2026 · 232 m away
  • Building permitnew building, new house, secondary suite

    Revision 02: proposed finished basement, enclosed side porch and new roof cover for walkupRevision 01: Filled open below space with floor joist on second floor & interior layout update. Proposed single family dwelling with second unit attached

    46 DEMPSTER ST · Jul 13, 2026 · 280 m away
  • Zoning review

    Closed

    2351 KENNEDY RD · Jul 6, 2026 · 266 m away
  • Building permit

    Alteration for restairant and Barrier Free Washroom

    4002 SHEPPARD AVE E · Jun 11, 2026 · 229 m away
  • Zoning review

    Closed

    3850 SHEPPARD AVE E · Jun 1, 2026 · 274 m away

Neighbourhood: Tam O'Shanter-Sullivan

About the area around the lot, not the lot itself.

Nearest station
Agincourt GO Station7 min walk
Nearest TTC stop
Sheppard Ave East at Kennedy Rd2 min walk
Nearest cycling route
West Highland Creek TrlMulti-Use Trail, 8 min walk
Nearest traffic count
17,113 vehicles in 14 hSheppard Ave E: Allanford Rd - Kennedy Rd, 100 m away, Oct 19, 2025
Serious collisions within 500 m
62021–2026, killed or seriously injured: 2 fatal, 4 with pedestrians, 0 with cyclists
Parks
Inglewood Heights Park5 min walk
Collingwood Park5 min walk
Ron Watson Park8 min walk

Schools within 1 km

  • MAPLE LEAF COLLEGIATE SCHOOL Private 4 min walk
  • CANADA INTERNATIONAL COLLEGE SCHOOL Private 4 min walk
  • INGLEWOOD HEIGHTS JR PUBLIC SCHOOL English Public 6 min walk
  • TAM O'SHANTER JR PUBLIC SCHOOL English Public 11 min walk
  • AGINCOURT JR PUBLIC SCHOOL English Public 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureTam O'Shanter-SullivanMedian neighbourhood
Median household income (2020)$76,500$84,500
Households that own their home56%54%
Population (2021)27,20516,813
Homes built in 1960 or before17%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleTam O'Shanter-SullivanCity median
Assault446.6636.3
Robbery96.869.5
Homicide3.15.3
Shootings12.510.5
Auto theft209.2192.6
Theft over $5,00034.446.1
Break and enter124.9172.8
Theft from vehicles256.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.