HousePrecheckCheck an address

3865 Yonge StToronto · zoning, lot size and permit records

Also 15 Mill St, 17 Mill St, 1 Mill St, 3855 Yonge St

Open space · ON≈ 200.1 × 226.6 m36,922 m²on Yonge Stcorner, also on Mill St

Not a home

York Mills Valley Park

The City of Toronto's real estate inventory lists York Mills Valley Park here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelRecent records on this lot: 26 176601 (Proposal to install one (1) 30x80' frame temporary tent (cert #15 159498). Installation..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
  • Major Transit Station Area: York MillsThe City plans more homes around the station: good for transit, and more building over time.
N50 m
≈ 200.1 m frontage≈ 226.6 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: listed

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused. A listing is not registered on title, so a title search will not show it.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • TRCA regulated area (100% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (100% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Natural Heritage System (100% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 176601 (Proposal to install one (1) 30x80' frame temporary tent (cert #15 159498). Installation..., 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

6 records on file: more than at 95% of Toronto houses (median 0).

  • Building permit26 176601Permit Issued

    Proposal to install one (1) 30x80' frame temporary tent (cert #15 159498). Installation: Friday, June 5, 2026 and dismantle on Sunday, June 7, 2026

    Jun 5, 2026 · 3865 YONGE ST
  • Building permit25 163431Closed

    Proposal to install one (1) 30x80' frame temporary tent (cert #15159498). Installation on Friday, June 6, 2025 and dismantle on Sunday, June 8, 2025.

    May 26, 2025 · 3865 YONGE ST
  • Building permit24 139467Closed

    Proposal to Install one (1) Temporary tent. Tent: One (1) - 30'x80' Frame Tent (Cert #15-159498)INSTALLATION : Friday, May 31, 2024 DISMANTLE : Sunday, June 2, 2024

    Apr 29, 2024 · 3865 YONGE ST
  • Building permit23 151363Closed

    Proposal to install one temporary tent for the York Mills Valley Association on June 2nd, 2023 and dismantle on June 5th, 2023

    May 30, 2023 · 3865 YONGE ST
  • Building permit10 262244Cancelled

    Valley Tennis - Int. Alt. to existing clubhouse adding attached deck, changeroom and new bleacher.

    Sep 21, 2010 · 3865 YONGE ST
  • Building permit10 126656Closed

    Fire damage repairs

    Mar 4, 2010 · 17 MILL ST

Lot facts

Area
36,922 m²
Frontage
200.1 mestimated, irregular lot
Depth
226.6 mestimated, irregular lot
Street
Yonge St
Corner lot
Yes, also on Mill St226.6 m along it
Public lane
None
House footprint
140 m²roof up to 11 m
Back yard
69.8 mhouse to rear lot line
Side yards
19.1 m and 165.6 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: York Mills. The lot is inside the York Mills Major Transit Station Area approved by the Province (Site and Area Specific Policy 639). Source
  • Zone ON (Open Space Natural). Chapter 90, section 90.20 of the by-law. Source
  • 36 City trees in front of this lot. The City's street tree inventory lists 36 trees at this address: elm, siberian (72 cm), oak, english pyramidal (62 cm), olive, russian (45 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
88%15 of 17 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 17 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Zoning review

    Closed

    35 DONWOODS DR · Oct 26, 2026 · 237 m away
  • Building permit

    INSTALLATION OF SOLAR PANEL ON ROOF TOP OF THE HOUSE

    45 DONINO AVE · Oct 21, 2026 · 166 m away
  • Building permitnew building, new house

    Revision 01 - Revision to roof design.-------------------------------------------------Proposal to demolish the existing single family dwelling and construct a new two storey single family dwelling with basement, attached garage and new inground swimming pool.

    35 DONWOODS DR · Oct 19, 2026 · 237 m away
  • Building permitdemolition

    Proposal to demolish the existing single family dwelling and construct a new two storey single family dwelling.

    35 DONWOODS DR · Oct 13, 2026 · 237 m away
  • Building permitnew building, new house

    REV 02: Revision to permit to remove the 2 h fire-resistance rating of the floor and supporting members between Basement (B1) and Sub-Basement (B2), and the 1.5 h fire-rated doors at the sub-basement stairs. Refer to cover letterProposal to construct a new two storey home with a basement walkout and sub basement.

    3 OLD YONGE ST · Oct 13, 2026 · 226 m away
  • Building permit

    The scope of work is limited to interior alterations within the existing amenity fitness area of an existing condominium building classified as a Group C Residential occupancy. The proposed renovation includes the construction of two new single-user, gender-neutral washrooms, each equipped with a water closet, lavatory, and shower, to serve the existing amenity area.The amenity fitness area is intended solely for the use of residents of the condominium building.

    3900 YONGE ST · Aug 25, 2026 · 247 m away
  • Building permit

    REV 01: PROPOSED GARAGE WALLS TO BE REPLACED WITH SAME MATERIAL Proposal for 2 storey front and rear addition to existing 1 storey SFD

    22 DONINO AVE · Aug 6, 2026 · 260 m away
  • Zoning review

    Notice Sent

    4 IVOR RD · Jul 15, 2026 · 177 m away
  • Zoning review

    Cancelled

    4 IVOR RD · Jun 30, 2026 · 177 m away
  • Building permit

    Proposal to install one (1) 30x80' frame temporary tent (cert #15 159498). Installation: Friday, June 5, 2026 and dismantle on Sunday, June 7, 2026

    3865 YONGE ST · Jun 5, 2026 · 46 m away

Neighbourhood: Bridle Path-Sunnybrook-York Mills

About the area around the lot, not the lot itself.

Nearest station
York Mills Station10 min walk
Nearest TTC stop
Yonge St at Mill St2 min walk
Nearest cycling route
York Mills Valley Park TrlMulti-Use Trail - Connector, 1 min walk
Nearest traffic count
1,997 vehicles in 8 hBrookfield Rd / Donino Ave / Old Yonge St / Mill St, 150 m away, Apr 6, 2011
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
York Mills Valley Park1 min walk
York Mills Park1 min walk
Jolly Miller Park2 min walk

Schools within 1 km

  • LORETTO ABBEY CATHOLIC SECONDARY SCHOOL English Separate 9 min walk
  • THE DUNBLAINE SCHOOL Private 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureBridle Path-Sunnybrook-York MillsMedian neighbourhood
Median household income (2020)$222,000$84,500
Households that own their home89%54%
Population (2021)8,94016,813
Homes built in 1960 or before22%29%
Homes needing major repairs3%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleBridle Path-Sunnybrook-York MillsCity median
Assault205.9636.3
Robbery51.569.5
Shootings17.210.5
Auto theft197.4192.6
Theft over $5,00034.346.1
Break and enter403.3172.8
Theft from vehicles163188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.