HousePrecheckCheck an address

385R Eastern AveToronto · zoning, lot size and permit records

(H) EO (x8)41.8 × 13.2 m502 m²on Sunlight Park Rd

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • 7 development applications open within 300 m, up to 48 storeysNew buildings may go up around here in the next years. More change nearby than at 96% of Toronto houses.
N20 m
41.8 m frontage13.2 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (100% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • 7 development applications open within 300 m

    Good to know

    7 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 48 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

No permits, applications or Committee of Adjustment files on this lot in the City's open records.

Check before you build

  • Site-specific exception 900.24.10(8)

    Needs a closer look

    26 site-specific rules and 26 older by-laws that still prevail apply to this lot. They can override the standard rules on this page. 2 parts are limited to an area drawn on a by-law diagram; check whether this lot is in it.

    Zoning By-law 569-2013, Chapter 900
  • Holding provision (H)

    Needs a closer look

    Development is on hold until the conditions of the holding by-law are met.

    Zoning By-law 569-2013
Exception 900.24.10(8)Applies

These parts of the exception apply to this lot's address.

  1. Rule A · diagram area

    On the lands shown as (H)EO on Diagram 2 to By-law 1281-2018, if the applicable requirements in Section 9 and Schedules A, B and C of By-law 1281-2018 are complied with, none of the provisions of 5.10.40.70(1) through (4), 60.5.40.10, 60.5.40.60(1), 60.5.40.70, or 60.40.1.10 apply to prevent the erection or use of land, buildings or structures on the lands if in compliance with Regulations

  2. Rule B

    to (TT) below; (B) Despite Regulation 800.50.825, street means an existing or future street identified on Diagram 7 of By-law 1281-2018

  3. Rule C

    In addition to uses permitted in Regulation 60.40.20.10(1)(A) and 60.40.20.10(1)(B), the following additional uses are permitted in an EO District on the lands: (i) Amusement Arcade (ii) An Eating Establishment, Retail Store or Take-out Eating Establishment all of which may include food or beverage manufacturing (iii) Cabaret (iv) District Heating and Cooling Plant (v) Entertainment Place of Assembly (vi) Nightclub (vii) Ornamental Structure (viii) Pet Services (ix) Post-Secondary School

  4. Rule D

    Regulation 60.40.20.100(5) does not apply

  5. Rule E

    Regulation 60.40.20.100(6) does not apply

  6. Rule F

    Regulation 60.40.20.100(7) does not apply

  7. Rule G

    Regulations 60.40.20.100(14)(B), 60.40.20.100(14)(C), and 60.40.20.100(F) do not apply

  8. Rule H

    Despite Regulations 60.40.20.20(1)(A) and (B), a district heating and cooling plant is permitted if it is in combination with another permitted use on the lands and complies with all Municipal, Provincial and Federal by-laws, statutes and Regulations

  9. Rule I

    Other uses combined with eating establishments are not subject to the interior floor area restrictions set out in Regulation 150.100.20.1

  10. Rule J

    Vehicle service shops are not subject to the conditions set out in Regulation 150.94

  11. Rule K

    In addition to uses permitted in Regulation 60.40.20.20(1)(B), the following additional uses are permitted if they comply with the specific conditions associated with the reference number(s) for each use in Regulation 60.40.20.100 and the Conditions identified at (M) below: (i) Day Nursery (ii) Outdoor Sales or Display (iii) Vehicle Service Shop (iv) Vehicle Washing Establishment

  12. Rule L

    In addition to the Conditions at Regulation 60.40.20.100, the following additional conditions apply: (i) A day nursery in the EO and (H)EO zone is permitted provided it is located on the first storey of a building ; (ii) Outdoor sale or display of goods or commodities in the EO and (H)EO zone: (a) may not be located in areas required by this By-law for parking, loading, driveways or landscaping ; and (b) there may be no storage or warehousing of goods in a vehicle ; (iii) A Vehicle Service Shop in the EO and (H)EO zone must: (a) be wholly below grade ; or (b) not located within 5 metres of an exterior building wall, exclusive of accesses; (iv) A Vehicle Washing Establishment in the EO and (H)EO zone must: (a) be below ground in a parking garage ; and (b) comply with the specific use Regulations in Section 150.96

  13. Rule M

    In the EO and (H)EO zone, if a vehicle washing establishment is located inside a building and below ground, the provisions of Regulations 150.96.20.1(2) and (3) do not apply

  14. Rule N

    Despite Regulation 60.40.20.10(1)(A), the following uses are not permitted in an EO zone on the lands: (i) Cold Storage (ii) Dry Cleaning or Laundry Plant

  15. Rule O

    Despite Regulation 60.40.20.20, the following uses are not permitted in an EO zone on the lands: (i) Drive Through Facility (ii) Food Manufacturing Use (iii) Furniture Manufacturing Use (iv) Medical Equipment and Supplies Manufacturing Use (v) Metal Products Manufacturing Use (vi) Open Storage (vii) Pharmaceutical and Medicine Manufacturing Use (viii) Place of Worship (ix) Plastic Product Manufacturing Use (x) Transportation Product and Vehicle Manufacturing Use

  16. Rule P

    Uses listed in Regulation 60.40.20.10(1) and 60.40.20.20(1) that are not listed in (N) and (O) above are permitted in an EO zone on the lands, if they comply with the specific conditions associated with the reference number(s) for each use in Regulation 60.40.20.100 and the relevant specific use requirements of Section 150

  17. Rule Q

    The following uses are permitted in an (H)EO zone, until such time as an (H) holding symbol is lifted from any of the (H)EO zoned lands: (i) Artist Studio (ii) Beverage Manufacturing use, provided that no individual beverage manufacturing use may exceed 2,500 square metres of gross floor area (iii) Bus station (iv) Cartage, express or truck transport yard or terminal for one or more highway transportation companies or organizations (v) Club (vi) Community health centre (vii) Contractor’s Establishment (viii) Custom Workshop (ix) Day Nursery (x) Eating Establishment (xi) Flood protection structures and facilities (xii) Financial Institution (xiii) Industrial Sales and Service Use (xiv) Industrial catering service (xv) Laboratory (xvi) Manufacturing Use (xvii) Market Garden (xviii) Medical Office (xix) Open Storage (xx) Ornamental structure (xxi) Park (xxii) Parking Garage (xxiii) Performing Arts Studio (xxiv) Personal Service Shop (xxv) Post office (xxvi) Public Parking (xxvii) Public transit (xxviii) Public Works Yard (xxix) Pumping station (xxx) Printing Establishment (xxxi) Production Studio (xxxii) Railway, including service and repair yards (xxxiii) Railway station (xxxiv) Railway tracks (xxxv) Retail Service (xxxvi) Retail Store (xxxvii) Shipping Terminal (xxxviii) Software Development and Processing (xxxix) Stable (xl) Take-out Eating Establishment (xli) Temporary sale/rental centre (xlii) Trade school (xliii) Vehicle Repair Shop (xliv) Vehicle Service Shop (xlv) Vehicle Washing Establishment (xlvi) Veterinary Hospital (xlvii) Warehouse (xlviii) Wholesaling Use

  18. Rule R

    Following the removal of any (H) holding symbol from any portion of the (H)EO zoned lands, the following uses are prohibited in an (H)EO zoned lands: (i) The uses listed in (N) and (O) above (ii) Apparel and Textile Manufacturing Use (iii) Cartage, express or truck transport yard or terminal for one or more highway transportation companies or organizations (iv) Clay Product Manufacturing Use (v) Computer, Communications, Electronics, or Optical Media Manufacturing Use (vi) Contractor’s Establishment (vii) Public Works Yard (viii) Pumping station (ix) Shipping Terminal (x) Stable

  19. Rule S

    Despite any other provision of this Exception, the uses permitted in (C)-(L) above are permitted, and the uses prohibited in (N), (O) and (R) above are not permitted, in the building or structure generally illustrated by the outline on Diagram 2 attached to By-law 1281-2018, labeled as Former Building 36, as well as any additions and expansions to thereto, both prior to and following the removal of the (H) holding symbol from the EO(H) zone (as though there was no (H) holding symbol on Former Building 36)

  20. Rule T

    The maximum non-residential gross floor area permitted in each quadrant identified on Diagram 5 attached to By-law 1281-2018 is as follows: (i) Quadrant 1: 314,400 square metres (ii) Quadrant 2: 342,600 square metres (iii) Quadrant 3: 92,600 square metres (iv) Quadrant 4: 176,400 square metres

  21. Rule U

    Subject to (T) above, the maximum non-residential gross floor area for each quadrant identified on Diagram 5 attached to By-law 1281-2018 that may be occupied by the following: Cabarets, Clubs, Eating Establishments, Entertainment Places of Assembly, Financial Institutions, Industrial Sales and Service Uses, Medical Office, Massage Therapy , Nightclubs , Outdoor Sales or Display, Personal Service Shops, Pet Services, Places of Assembly, Recreation Uses, Retail Services, Retail Stores, Self-storage Warehouse, Service Shops, Take-out Eating Establishments and Wellness Centres , is as follows: (i) Quadrant 1: 40,700 square metres (ii) Quadrant 2: 72,500 square metres (iii) Quadrant 3: 22,400 square metres (iv) Quadrant 4: 49,600 square metres

  22. Rule V

    For the purposes of this exception, Street-related retail and service uses means one or more of: art gallery, artist studio, eating establishments , financial institutions , personal service shops , pet services, retail stores , and take-out eating establishments

  23. Rule W

    No building or structure subject to an Animation Zone frontage(s) as shown on Diagram 8 may be erected or used on a lot unless a minimum of 80 percent of the cumulative length of the exterior main walls of the building or structure at the first storey above ground along the "Animation Zone" frontage(s) is occupied by one or more of the following uses: art galleries , artist studios, community centres, day nurseries , libraries, markets, museums , performing arts studios , publicly accessible and programmable office and other lobbies, publicly accessible post-secondary schools , recreation uses , and street-related retail and service uses : (i) For each building or structure , a minimum of 10 percent of each 80 percent provided in accordance with (W) above will comprise street-related retail and service uses units that are subject to the following requirements: (a) each street-related retail and service uses unit will be limited to a maximum of 250 square metres of interior gross floor area , and (b) the length of each street-related retail and service uses unit will be limited to a maximum of 7 metres; (ii) the principal public entrance to each shop or use is located in the exterior wall of the building which is directly accessible by pedestrians along a route not more than 5 metres from: (a) the frontage of the lot on which the shop or use is located; or (b) a building setback line from a street on which the shop or use has frontage, provided the line is established by this Exception; and (iii) the level of the floor of the principal public entrance is within 0.2 metres of the level of the public sidewalk opposite such entrance

  24. Rule X

    Despite Regulation 60.40.40.10: (i) For the purposes of this exception, grade means the Canadian Geodetic Datum elevation of 78.6 metres; (ii) The maximum building height above grade for the areas shown on Diagrams 6, 6A and 6B collectively attached to By-law 1281-2018, is as indicated on Table 1 of By-law 1281-2018; (iii) For the purposes of this exception, storey means the portion of a building that is between the top of a floor and the top of the floor next above it, and if there is no floor above it, the portion between the top of the floor and the ceiling above it. The following will not be considered a storey : a mezzanine floor level which is located above the first floor level above-ground, not exceeding 30 percent of the interior floor area of the first floor level above-ground, and limited in use to accessory uses such as storage, mechanical, electrical, and other areas dedicated to the functional operation of the building ; (iv) The required minimum height of the first storey above ground in any principal building is 5.0 metres , measured between the top of the floor of the first storey and the underside of the ceiling of the first storey ; (v) Despite (X)(ii) above, the following structures /items may exceed the height limits as described: (a) structures on any roof used for outdoor amenity space or open air recreation, maintenance, safety, wind or green roof purposes to a maximum vertical projection of 2.0 metres above the height limits ; (b) elevator overruns and related enclosures, including stair towers, to a maximum of 5.0 metres above height limits ; (c) parapets up to 2.0 metres above height limits; (d) terraces and patios, including associated railings, and architectural and landscape features up to 2.0 metres above height limits; (e) chimneys, vents, stacks, or other heating, cooling, or ventilation equipment or window-washing equipment on the roof of the building , or a fence, wall, or structure enclosing such elements, up to 5.0 metres above height limits, provided such are set back a minimum of 10 metres from the lot line

  25. Rule Y

    Buildings or structures above ground are to be set back a minimum of 20.0 metres from the UT zone overlaying the Metrolinx rail corridor immediately north of the lands subject to this exception, except for: (i) buildings or structures used for transportation uses, which may include P ersonal Service Shops , Service Retail, Retail Stores, Take-out Eating Establishments , and accessory uses; (ii) district energy uses; and (iii) district heating and cooling plant

  26. Rule Z

    All buildings or structures above ground must be set back a minimum of 5.0 metres from any OR and/or (H) OR zone

  27. Rule AA

    Notwithstanding (Z) above, the building / structure generally illustrated by the outline on Diagram 2, labeled as Building 36, as well as any additions and expansions thereto, may have a 2 metre setback from the OR or (H)OR zone provided that either the (H) has been lifted from the relevant EO lands or the Toronto and Region Conservation has issued a permit under Ontario Regulation 166/06 or its successor respecting said building / structure , and any additions and expansions thereto; (BB) Building s or structures in an EO zone must be set back above ground from the street lines for those streets identified on Diagram 7 By-law 1281-2018 as indicated on Table 2 of By-law 1281-2018; (CC) For the purposes of this exception, 'tower' means the portions of a building which collectively enclose the entirety of a storey higher than 36.0 metres above grade ; (DD) Above a height of 36 metres, a minimum separation distance of 25 metres must be provided between the main walls of any tower and another tower on the lands, as measured from exterior main walls ; (EE) The maximum number of towers in each Quadrant as identified on Diagram 5 is: (i) Quadrant 1: 3 (ii) Quadrant 2: 5 (iii) Quadrant 3: 2 (iv) Quadrant 4: 3; (FF) No minimum setback requirements apply to the portions of buildings or structures below ground; (GG) Notwithstanding (BB) and (DD) above, elements of a building may encroach into a required building setback as follows: (i) structural elements related to the Broadview Avenue underpass beneath the railway station; (ii) cornices, sills, eaves, window washing equipment, railings, balustrades awnings, piers and sun-shades, to a maximum horizontal projection of 0.5 metres into any required setback; (iii) chimneys, vents and stacks, provided such are set back a minimum of 10 metres from the lot line ; (iv) terraces, and patios, including associated railings, and architectural and landscape features; (v) balconies to a maximum horizontal projection of 2.0 metres; and (vi) canopies including supporting structures , covered walkways, privacy screens, planters, awnings, fences, lighting, bollards, safety railings, trellises, guards, guardrails, retaining walls, wheel chair ramps, bicycle parking facilities, ornamental or architectural features, landscape features, doors and door swings, facilities accessory to a day nursery , and art installations; (HH) Parking spaces for uses on lands zoned (H)EO will be provided in accordance with Chapter 200; (II) Despite Regulation 60.5.80.10, required parking spaces and loading spaces for uses on lands zoned by this exception may be provided anywhere on the lands subject to this exception; (JJ) Despite Chapter 200.5.10.1 and Chapter 200.10.1, off- street motor vehicle parking spaces must be provided for every building or structure erected or enlarged on the lands subject to this exception, in accordance with the following: (i) Parking spaces must be provided as follows: (a) the minimum number of required parking spaces is 0.3 spaces per 100 square metres of gross floor area ; and (b) the maximum number of parking spaces permitted to be located in each quadrant of the lands as illustrated on Diagram 5 is as follows: Quadrant 1: 1570; Quadrant 2: 1885; Quadrant 3: 370; and Quadrant 4: 535; (ii) Despite Regulation 60.5.80.10, required parking spaces to support development must be located in a parking garage ; (iii) A parking garage is permitted only below-ground, exclusive of accesses; (iv) Despite (JJ)(ii) above, a parking garage may be located in an above-ground building or portion thereof provided that: (a) the use, exclusive of accesses, is not located within 10 metres of an exterior wall facing a street ; and (b) the portion of the building between the exterior wall facing the street and the area used for parking is solely occupied by other uses permitted by this Exception, exclusive of accesses; (KK) Despite Regulation 60.5.100.1(1), any driveway is restricted to a maximum width of 7.5 metres for a minimum depth of 3.0 metres measured from the street line ; (LL) Despite (KK) above, a maximum of two driveways on the lands subject to this exception may have a maximum width of 11 metres for a minimum depth of 3.0 metres measured from a lot line abutting a street ; (MM) Despite Chapter 200.15, the following requirements apply to accessible parking spaces : (i) For the purposes of this clause, "accessible" means free of a physical, architectural or design barriers that would restrict access or use to a person with a disability as defined in the Accessibility for Ontarians with Disabilities Act, 2005, S.O. 2005, c. 11; (ii) an accessible parking space must have the following minimum dimensions: (a) length of 5.6 metres; (b) width of 3.4 metres; and (c) vertical clearance of 2.1 metres; (iii) The minimum dimensions of an accessible parking space that is adjacent and parallel to a drive aisle from which vehicle access is provided is: (a) length of 7.1 metres (b) width of 2.6 metres; and (c) vertical clearance of 2.1 metres; (iv) The entire length of an accessible parking space must be adjacent to a 1.5 metre wide accessible barrier free aisle or path as shown on Diagram 1 and Diagram 2 of By-law 579-2017; (v) Accessible parking spaces must be the parking spaces closest to a barrier free: (a) entrance to a building ; (b) passenger elevator that provides access to the first storey of the building ; and (c) shortest route from the required entrances in (a) and (b); (vi) Clearly identified off street accessible parking spaces must be provided on the same lot as every building or structure erected or enlarged, if the total parking space requirement is 5 or more, in compliance with the following: (a) if the number of required parking spaces is 5 to 24, a minimum of 1 parking space must comply with the minimum dimensions for an accessible parking space ; (b) if the number of required parking spaces is 25 to 100, a minimum of 1 parking space for every 25 parking spaces or part thereof must comply with the minimum dimensions for an accessible parking space ; and (c) if the number of required parking spaces is more than 100, a minimum of 4 parking spaces plus 1 parking space for every 50 parking spaces or part thereof in excess of 100 parking spaces , must comply with the minimum dimensions for an accessible parking space ; (NN) Despite Chapter 230.5.10, bicycle parking spaces must be provided for all uses on the lands at the Office Bicycle Parking Space Rates, as in Table 230.5.10.1(1); (OO) Access to long-term bicycle parking spaces located anywhere but on the first storey must be provided through a dedicated ramp and/or a dedicated elevator; (PP) Despite Regulation 220.5.1.10(1), calculation of required loading spaces will be undertaken separately for each quadrant of the lands shown on Diagram 5 of By-law 1281-2018; (QQ) Areas for required loading spaces may be connected below-ground through the lands subject to this exception; (RR) Despite Chapter 220.5.10, loading spaces on the lands will be provided at the office loading space requirements rates; (SS) Nothing in this exception or By-law 569-2013 applies to prevent the use of the lands, or the erection or use of a building , structure , or portion thereof on the lands subject to this exception for any of the following: (i) transportation uses ; (ii) structures used in connection with any of the uses listed under 90.30.20.10 or 90.30.20.20 constructed or operated by, or on behalf of the City of Toronto; and (iii) flood protection structures and facilities; (TT) The floor area of any building or structure devoted exclusively to any of the purposes in (SS) above are excluded from any calculations of gross floor area and required parking spaces for the lands required elsewhere by this exception or By-law 569-2013; Prevailing By-laws and Prevailing Sections: (A) City of Toronto By-law438-86 Section 12(2)270, only as applicable to (Q) and (R) above.

  28. Older by-law A · diagram area

    On the lands shown as (H)EO on Diagram 2 to By-law 1281-2018, if the applicable requirements in Section 9 and Schedules A, B and C of By-law 1281-2018 are complied with, none of the provisions of 5.10.40.70(1) through (4), 60.5.40.10, 60.5.40.60(1), 60.5.40.70, or 60.40.1.10 apply to prevent the erection or use of land, buildings or structures on the lands if in compliance with Regulations

  29. Older by-law B

    to (TT) below; (B) Despite Regulation 800.50.825, street means an existing or future street identified on Diagram 7 of By-law 1281-2018

  30. Older by-law C

    In addition to uses permitted in Regulation 60.40.20.10(1)(A) and 60.40.20.10(1)(B), the following additional uses are permitted in an EO District on the lands: (i) Amusement Arcade (ii) An Eating Establishment, Retail Store or Take-out Eating Establishment all of which may include food or beverage manufacturing (iii) Cabaret (iv) District Heating and Cooling Plant (v) Entertainment Place of Assembly (vi) Nightclub (vii) Ornamental Structure (viii) Pet Services (ix) Post-Secondary School

  31. Older by-law D

    Regulation 60.40.20.100(5) does not apply

  32. Older by-law E

    Regulation 60.40.20.100(6) does not apply

  33. Older by-law F

    Regulation 60.40.20.100(7) does not apply

  34. Older by-law G

    Regulations 60.40.20.100(14)(B), 60.40.20.100(14)(C), and 60.40.20.100(F) do not apply

  35. Older by-law H

    Despite Regulations 60.40.20.20(1)(A) and (B), a district heating and cooling plant is permitted if it is in combination with another permitted use on the lands and complies with all Municipal, Provincial and Federal by-laws, statutes and Regulations

  36. Older by-law I

    Other uses combined with eating establishments are not subject to the interior floor area restrictions set out in Regulation 150.100.20.1

  37. Older by-law J

    Vehicle service shops are not subject to the conditions set out in Regulation 150.94

  38. Older by-law K

    In addition to uses permitted in Regulation 60.40.20.20(1)(B), the following additional uses are permitted if they comply with the specific conditions associated with the reference number(s) for each use in Regulation 60.40.20.100 and the Conditions identified at (M) below: (i) Day Nursery (ii) Outdoor Sales or Display (iii) Vehicle Service Shop (iv) Vehicle Washing Establishment

  39. Older by-law L

    In addition to the Conditions at Regulation 60.40.20.100, the following additional conditions apply: (i) A day nursery in the EO and (H)EO zone is permitted provided it is located on the first storey of a building ; (ii) Outdoor sale or display of goods or commodities in the EO and (H)EO zone: (a) may not be located in areas required by this By-law for parking, loading, driveways or landscaping ; and (b) there may be no storage or warehousing of goods in a vehicle ; (iii) A Vehicle Service Shop in the EO and (H)EO zone must: (a) be wholly below grade ; or (b) not located within 5 metres of an exterior building wall, exclusive of accesses; (iv) A Vehicle Washing Establishment in the EO and (H)EO zone must: (a) be below ground in a parking garage ; and (b) comply with the specific use Regulations in Section 150.96

  40. Older by-law M

    In the EO and (H)EO zone, if a vehicle washing establishment is located inside a building and below ground, the provisions of Regulations 150.96.20.1(2) and (3) do not apply

  41. Older by-law N

    Despite Regulation 60.40.20.10(1)(A), the following uses are not permitted in an EO zone on the lands: (i) Cold Storage (ii) Dry Cleaning or Laundry Plant

  42. Older by-law O

    Despite Regulation 60.40.20.20, the following uses are not permitted in an EO zone on the lands: (i) Drive Through Facility (ii) Food Manufacturing Use (iii) Furniture Manufacturing Use (iv) Medical Equipment and Supplies Manufacturing Use (v) Metal Products Manufacturing Use (vi) Open Storage (vii) Pharmaceutical and Medicine Manufacturing Use (viii) Place of Worship (ix) Plastic Product Manufacturing Use (x) Transportation Product and Vehicle Manufacturing Use

  43. Older by-law P

    Uses listed in Regulation 60.40.20.10(1) and 60.40.20.20(1) that are not listed in (N) and (O) above are permitted in an EO zone on the lands, if they comply with the specific conditions associated with the reference number(s) for each use in Regulation 60.40.20.100 and the relevant specific use requirements of Section 150

  44. Older by-law Q

    The following uses are permitted in an (H)EO zone, until such time as an (H) holding symbol is lifted from any of the (H)EO zoned lands: (i) Artist Studio (ii) Beverage Manufacturing use, provided that no individual beverage manufacturing use may exceed 2,500 square metres of gross floor area (iii) Bus station (iv) Cartage, express or truck transport yard or terminal for one or more highway transportation companies or organizations (v) Club (vi) Community health centre (vii) Contractor’s Establishment (viii) Custom Workshop (ix) Day Nursery (x) Eating Establishment (xi) Flood protection structures and facilities (xii) Financial Institution (xiii) Industrial Sales and Service Use (xiv) Industrial catering service (xv) Laboratory (xvi) Manufacturing Use (xvii) Market Garden (xviii) Medical Office (xix) Open Storage (xx) Ornamental structure (xxi) Park (xxii) Parking Garage (xxiii) Performing Arts Studio (xxiv) Personal Service Shop (xxv) Post office (xxvi) Public Parking (xxvii) Public transit (xxviii) Public Works Yard (xxix) Pumping station (xxx) Printing Establishment (xxxi) Production Studio (xxxii) Railway, including service and repair yards (xxxiii) Railway station (xxxiv) Railway tracks (xxxv) Retail Service (xxxvi) Retail Store (xxxvii) Shipping Terminal (xxxviii) Software Development and Processing (xxxix) Stable (xl) Take-out Eating Establishment (xli) Temporary sale/rental centre (xlii) Trade school (xliii) Vehicle Repair Shop (xliv) Vehicle Service Shop (xlv) Vehicle Washing Establishment (xlvi) Veterinary Hospital (xlvii) Warehouse (xlviii) Wholesaling Use

  45. Older by-law R

    Following the removal of any (H) holding symbol from any portion of the (H)EO zoned lands, the following uses are prohibited in an (H)EO zoned lands: (i) The uses listed in (N) and (O) above (ii) Apparel and Textile Manufacturing Use (iii) Cartage, express or truck transport yard or terminal for one or more highway transportation companies or organizations (iv) Clay Product Manufacturing Use (v) Computer, Communications, Electronics, or Optical Media Manufacturing Use (vi) Contractor’s Establishment (vii) Public Works Yard (viii) Pumping station (ix) Shipping Terminal (x) Stable

  46. Older by-law S

    Despite any other provision of this Exception, the uses permitted in (C)-(L) above are permitted, and the uses prohibited in (N), (O) and (R) above are not permitted, in the building or structure generally illustrated by the outline on Diagram 2 attached to By-law 1281-2018, labeled as Former Building 36, as well as any additions and expansions to thereto, both prior to and following the removal of the (H) holding symbol from the EO(H) zone (as though there was no (H) holding symbol on Former Building 36)

  47. Older by-law T

    The maximum non-residential gross floor area permitted in each quadrant identified on Diagram 5 attached to By-law 1281-2018 is as follows: (i) Quadrant 1: 314,400 square metres (ii) Quadrant 2: 342,600 square metres (iii) Quadrant 3: 92,600 square metres (iv) Quadrant 4: 176,400 square metres

  48. Older by-law U

    Subject to (T) above, the maximum non-residential gross floor area for each quadrant identified on Diagram 5 attached to By-law 1281-2018 that may be occupied by the following: Cabarets, Clubs, Eating Establishments, Entertainment Places of Assembly, Financial Institutions, Industrial Sales and Service Uses, Medical Office, Massage Therapy , Nightclubs , Outdoor Sales or Display, Personal Service Shops, Pet Services, Places of Assembly, Recreation Uses, Retail Services, Retail Stores, Self-storage Warehouse, Service Shops, Take-out Eating Establishments and Wellness Centres , is as follows: (i) Quadrant 1: 40,700 square metres (ii) Quadrant 2: 72,500 square metres (iii) Quadrant 3: 22,400 square metres (iv) Quadrant 4: 49,600 square metres

  49. Older by-law V

    For the purposes of this exception, Street-related retail and service uses means one or more of: art gallery, artist studio, eating establishments , financial institutions , personal service shops , pet services, retail stores , and take-out eating establishments

  50. Older by-law W

    No building or structure subject to an Animation Zone frontage(s) as shown on Diagram 8 may be erected or used on a lot unless a minimum of 80 percent of the cumulative length of the exterior main walls of the building or structure at the first storey above ground along the "Animation Zone" frontage(s) is occupied by one or more of the following uses: art galleries , artist studios, community centres, day nurseries , libraries, markets, museums , performing arts studios , publicly accessible and programmable office and other lobbies, publicly accessible post-secondary schools , recreation uses , and street-related retail and service uses : (i) For each building or structure , a minimum of 10 percent of each 80 percent provided in accordance with (W) above will comprise street-related retail and service uses units that are subject to the following requirements: (a) each street-related retail and service uses unit will be limited to a maximum of 250 square metres of interior gross floor area , and (b) the length of each street-related retail and service uses unit will be limited to a maximum of 7 metres; (ii) the principal public entrance to each shop or use is located in the exterior wall of the building which is directly accessible by pedestrians along a route not more than 5 metres from: (a) the frontage of the lot on which the shop or use is located; or (b) a building setback line from a street on which the shop or use has frontage, provided the line is established by this Exception; and (iii) the level of the floor of the principal public entrance is within 0.2 metres of the level of the public sidewalk opposite such entrance

  51. Older by-law X

    Despite Regulation 60.40.40.10: (i) For the purposes of this exception, grade means the Canadian Geodetic Datum elevation of 78.6 metres; (ii) The maximum building height above grade for the areas shown on Diagrams 6, 6A and 6B collectively attached to By-law 1281-2018, is as indicated on Table 1 of By-law 1281-2018; (iii) For the purposes of this exception, storey means the portion of a building that is between the top of a floor and the top of the floor next above it, and if there is no floor above it, the portion between the top of the floor and the ceiling above it. The following will not be considered a storey : a mezzanine floor level which is located above the first floor level above-ground, not exceeding 30 percent of the interior floor area of the first floor level above-ground, and limited in use to accessory uses such as storage, mechanical, electrical, and other areas dedicated to the functional operation of the building ; (iv) The required minimum height of the first storey above ground in any principal building is 5.0 metres , measured between the top of the floor of the first storey and the underside of the ceiling of the first storey ; (v) Despite (X)(ii) above, the following structures /items may exceed the height limits as described: (a) structures on any roof used for outdoor amenity space or open air recreation, maintenance, safety, wind or green roof purposes to a maximum vertical projection of 2.0 metres above the height limits ; (b) elevator overruns and related enclosures, including stair towers, to a maximum of 5.0 metres above height limits ; (c) parapets up to 2.0 metres above height limits; (d) terraces and patios, including associated railings, and architectural and landscape features up to 2.0 metres above height limits; (e) chimneys, vents, stacks, or other heating, cooling, or ventilation equipment or window-washing equipment on the roof of the building , or a fence, wall, or structure enclosing such elements, up to 5.0 metres above height limits, provided such are set back a minimum of 10 metres from the lot line

  52. Older by-law Y

    Buildings or structures above ground are to be set back a minimum of 20.0 metres from the UT zone overlaying the Metrolinx rail corridor immediately north of the lands subject to this exception, except for: (i) buildings or structures used for transportation uses, which may include P ersonal Service Shops , Service Retail, Retail Stores, Take-out Eating Establishments , and accessory uses; (ii) district energy uses; and (iii) district heating and cooling plant

  53. Older by-law Z

    All buildings or structures above ground must be set back a minimum of 5.0 metres from any OR and/or (H) OR zone

  54. Older by-law AA

    Notwithstanding (Z) above, the building / structure generally illustrated by the outline on Diagram 2, labeled as Building 36, as well as any additions and expansions thereto, may have a 2 metre setback from the OR or (H)OR zone provided that either the (H) has been lifted from the relevant EO lands or the Toronto and Region Conservation has issued a permit under Ontario Regulation 166/06 or its successor respecting said building / structure , and any additions and expansions thereto; (BB) Building s or structures in an EO zone must be set back above ground from the street lines for those streets identified on Diagram 7 By-law 1281-2018 as indicated on Table 2 of By-law 1281-2018; (CC) For the purposes of this exception, 'tower' means the portions of a building which collectively enclose the entirety of a storey higher than 36.0 metres above grade ; (DD) Above a height of 36 metres, a minimum separation distance of 25 metres must be provided between the main walls of any tower and another tower on the lands, as measured from exterior main walls ; (EE) The maximum number of towers in each Quadrant as identified on Diagram 5 is: (i) Quadrant 1: 3 (ii) Quadrant 2: 5 (iii) Quadrant 3: 2 (iv) Quadrant 4: 3; (FF) No minimum setback requirements apply to the portions of buildings or structures below ground; (GG) Notwithstanding (BB) and (DD) above, elements of a building may encroach into a required building setback as follows: (i) structural elements related to the Broadview Avenue underpass beneath the railway station; (ii) cornices, sills, eaves, window washing equipment, railings, balustrades awnings, piers and sun-shades, to a maximum horizontal projection of 0.5 metres into any required setback; (iii) chimneys, vents and stacks, provided such are set back a minimum of 10 metres from the lot line ; (iv) terraces, and patios, including associated railings, and architectural and landscape features; (v) balconies to a maximum horizontal projection of 2.0 metres; and (vi) canopies including supporting structures , covered walkways, privacy screens, planters, awnings, fences, lighting, bollards, safety railings, trellises, guards, guardrails, retaining walls, wheel chair ramps, bicycle parking facilities, ornamental or architectural features, landscape features, doors and door swings, facilities accessory to a day nursery , and art installations; (HH) Parking spaces for uses on lands zoned (H)EO will be provided in accordance with Chapter 200; (II) Despite Regulation 60.5.80.10, required parking spaces and loading spaces for uses on lands zoned by this exception may be provided anywhere on the lands subject to this exception; (JJ) Despite Chapter 200.5.10.1 and Chapter 200.10.1, off- street motor vehicle parking spaces must be provided for every building or structure erected or enlarged on the lands subject to this exception, in accordance with the following: (i) Parking spaces must be provided as follows: (a) the minimum number of required parking spaces is 0.3 spaces per 100 square metres of gross floor area ; and (b) the maximum number of parking spaces permitted to be located in each quadrant of the lands as illustrated on Diagram 5 is as follows: Quadrant 1: 1570; Quadrant 2: 1885; Quadrant 3: 370; and Quadrant 4: 535; (ii) Despite Regulation 60.5.80.10, required parking spaces to support development must be located in a parking garage ; (iii) A parking garage is permitted only below-ground, exclusive of accesses; (iv) Despite (JJ)(ii) above, a parking garage may be located in an above-ground building or portion thereof provided that: (a) the use, exclusive of accesses, is not located within 10 metres of an exterior wall facing a street ; and (b) the portion of the building between the exterior wall facing the street and the area used for parking is solely occupied by other uses permitted by this Exception, exclusive of accesses; (KK) Despite Regulation 60.5.100.1(1), any driveway is restricted to a maximum width of 7.5 metres for a minimum depth of 3.0 metres measured from the street line ; (LL) Despite (KK) above, a maximum of two driveways on the lands subject to this exception may have a maximum width of 11 metres for a minimum depth of 3.0 metres measured from a lot line abutting a street ; (MM) Despite Chapter 200.15, the following requirements apply to accessible parking spaces : (i) For the purposes of this clause, "accessible" means free of a physical, architectural or design barriers that would restrict access or use to a person with a disability as defined in the Accessibility for Ontarians with Disabilities Act, 2005, S.O. 2005, c. 11; (ii) an accessible parking space must have the following minimum dimensions: (a) length of 5.6 metres; (b) width of 3.4 metres; and (c) vertical clearance of 2.1 metres; (iii) The minimum dimensions of an accessible parking space that is adjacent and parallel to a drive aisle from which vehicle access is provided is: (a) length of 7.1 metres (b) width of 2.6 metres; and (c) vertical clearance of 2.1 metres; (iv) The entire length of an accessible parking space must be adjacent to a 1.5 metre wide accessible barrier free aisle or path as shown on Diagram 1 and Diagram 2 of By-law 579-2017; (v) Accessible parking spaces must be the parking spaces closest to a barrier free: (a) entrance to a building ; (b) passenger elevator that provides access to the first storey of the building ; and (c) shortest route from the required entrances in (a) and (b); (vi) Clearly identified off street accessible parking spaces must be provided on the same lot as every building or structure erected or enlarged, if the total parking space requirement is 5 or more, in compliance with the following: (a) if the number of required parking spaces is 5 to 24, a minimum of 1 parking space must comply with the minimum dimensions for an accessible parking space ; (b) if the number of required parking spaces is 25 to 100, a minimum of 1 parking space for every 25 parking spaces or part thereof must comply with the minimum dimensions for an accessible parking space ; and (c) if the number of required parking spaces is more than 100, a minimum of 4 parking spaces plus 1 parking space for every 50 parking spaces or part thereof in excess of 100 parking spaces , must comply with the minimum dimensions for an accessible parking space ; (NN) Despite Chapter 230.5.10, bicycle parking spaces must be provided for all uses on the lands at the Office Bicycle Parking Space Rates, as in Table 230.5.10.1(1); (OO) Access to long-term bicycle parking spaces located anywhere but on the first storey must be provided through a dedicated ramp and/or a dedicated elevator; (PP) Despite Regulation 220.5.1.10(1), calculation of required loading spaces will be undertaken separately for each quadrant of the lands shown on Diagram 5 of By-law 1281-2018; (QQ) Areas for required loading spaces may be connected below-ground through the lands subject to this exception; (RR) Despite Chapter 220.5.10, loading spaces on the lands will be provided at the office loading space requirements rates; (SS) Nothing in this exception or By-law 569-2013 applies to prevent the use of the lands, or the erection or use of a building , structure , or portion thereof on the lands subject to this exception for any of the following: (i) transportation uses ; (ii) structures used in connection with any of the uses listed under 90.30.20.10 or 90.30.20.20 constructed or operated by, or on behalf of the City of Toronto; and (iii) flood protection structures and facilities; (TT) The floor area of any building or structure devoted exclusively to any of the purposes in (SS) above are excluded from any calculations of gross floor area and required parking spaces for the lands required elsewhere by this exception or By-law 569-2013; Prevailing By-laws and Prevailing Sections: (A) City of Toronto By-law438-86 Section 12(2)270, only as applicable to (Q) and (R) above.

By-law 569-2013, Chapter 900

Lot facts

Area
502 m²
Frontage
41.8 m
Depth
13.2 m
Street
Sunlight Park Rd
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—
  • Unilever Precinct Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone (H) EO (x8) (Employment Office). Chapter 60, section 60.40 of the by-law. Source

Around this lot

Minor variances approved
100%7 of 7 decisions
Garden suite permits
8
Laneway suite permits
1
Multiplex permits
7
Development applications
11

Within 300 m, last 10 years. 16 suite and multiplex permits: more than at 84% of Toronto houses (median 3). 7 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permitgarden suite

    REV01: Proposed revised changes to the rooftop service access.Proposal to construct a 1 storey garden suite with a basement

    26 B LEWIS ST · Sep 23, 2026 · 289 m away
  • Building permitdemolition

    Proposed demolition of main building (Car Dealership). Secondary structures, car wash and storage building will be processed as separate permits.

    11 SUNLIGHT PARK RD · Sep 11, 2026 · 228 m away
  • Building permitgarden suite

    Revision 01 - to change rooftop service access to approved permit 25-258203 BLD 00 SRProposal for a one-storey rear yard garden suite with basement and a front porch.

    24 LEWIS ST · Aug 27, 2026 · 282 m away
  • Building permit

    A proposal to erect and display 3 Ground Signs and 1 Wall Sign, all displaying static copy.***ENBRIDGE***

    405 EASTERN AVE · Jul 21, 2026 · 212 m away
  • Building permit

    Proposed interior alterations for interior renovations to Level 1 entry for security improvements, addition of 3 offices on Level 2, and renovation of Level 3 office and training room areas, including associated mechanical and electrical modifications to suit revised layouts.

    405 EASTERN AVE · Jul 6, 2026 · 212 m away
  • Building permitgarden suite, multiplex, new building, new house

    Proposal to construct a new three-storey 14-unit apartment building that will span over 3 lots (municipally known as 24 Lewis Street, 26 Lewis Street and 26B Lewis Street). This apartment building will contain a total of six residential dwelling units, with front and rear basement walkouts, front and rear porches (platforms) with stairs, front and rear second storey balconies, front and rear rooftop patios with access enclosures, no long-term bicycle parking spaces, and no automobile parking spaces. Also, to construct a one-storey detached ancillary building in the rear yard (one garden suite) with a basement and a rooftop maintenance access. There will be a total of seven residential dwelling units on this lot (six units within the apartment building and one unit within the ancillary building).

    26 B LEWIS ST · Jun 10, 2026 · 289 m away
  • Building permitgarden suite, multiplex, new building, new house

    Proposal to construct a new three storey two unit townhouse apartment building with a front porch, second storey front and rear balconies and a rear porch. Proposal to be reviewed as one building over three lots for a total of 14 units on three lots (16 units with Garden Suites) in conjunction with 24 and 26B Lewis St (rear yard garden suite and ALL proposals on adjacent lots to be reviewed separately). Lot lines between all three lots are proposed to shift.

    26 A LEWIS ST · Jun 10, 2026 · 285 m away
  • Building permitgarden suite, multiplex, new building, new house

    Proposal to construct a new three storey six unit townhouse apartment building with a front porch, front basement walkout, second storey front and rear balconies, rear basement walkout and a rear porch will be constructed. Proposal to be reviewed as one building over three lots for a total of 14 units (16 with Garden Suites) on three lots in conjunction with 26 and 26B Lewis St (rear yard garden suite and ALL proposals on adjacent lots to be reviewed separately). Lot lines between all three lots are proposed to shift.

    24 LEWIS ST · Jun 10, 2026 · 282 m away
  • Building permit

    Deferred Fees from folder 25 258203 (RSN-5746114) ZoningProcess RSN 78599353

    24 LEWIS ST · May 1, 2026 · 282 m away
  • Zoning review

    Cancelled

    405 EASTERN AVE · Mar 11, 2026 · 212 m away

Neighbourhood: South Riverdale

About the area around the lot, not the lot itself.

Nearest station
King Station42 min walk
Nearest TTC stop
Queen St East at Broadview Ave8 min walk
Nearest cycling route
Lower Don River TrlMulti-Use Trail, 4 min walk
Nearest traffic count
14,031 vehicles in 8 hEastern Ave / Eastern Ave Diversion / Broadview Ave, 250 m away, Jun 20, 2023
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Corktown Common4 min walk
Trca Lands ( 51)4 min walk
Saulter Street Parkette5 min walk

Schools within 1 km

  • QUEEN ALEXANDRA MDL SCHOOL English Public 13 min walk
  • DUNDAS JR PUBLIC SCHOOL English Public 13 min walk
  • MORSE STREET JR PUBLIC SCHOOL English Public 13 min walk
  • SEED ALTERNATIVE SCHOOL English Public 14 min walk
  • GEORGE BROWN COLLEGE - YOUNG CENTRE FOR THE PERFORMING ARTS College 15 min walk
  • INGLENOOK COMMUNITY SCHOOL English Public 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureSouth RiverdaleMedian neighbourhood
Median household income (2020)$100,000$84,500
Households that own their home57%54%
Population (2021)27,81516,813
Homes built in 1960 or before52%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleSouth RiverdaleCity median
Assault828.7636.3
Robbery69.369.5
Shootings3.210.5
Auto theft217.4192.6
Theft over $5,00088.246.1
Break and enter264.7172.8
Theft from vehicles349.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.