HousePrecheckCheck an address

380 Goldhawk TrlToronto · zoning, lot size and permit records

106.8 × 197.4 m20,227 m²on Goldhawk Trl

Not a home

Banting And Best Public School

The City's school locations place Banting And Best Public School on this parcel. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A school next doorDrop-off traffic around 8 to 9 am and 3 to 4 pm on school days, children walking; a short walk for a family.
  • Permits or applications open on this parcelStill open in the City's records: 18 246395 (Proposal to replace fire alarm system, 2018, status Work Not Started); 17 208283 (Proposed solar photovoltaic panels on roof top, 2017, status Permit Issued); 13 110379 (fire alarm panel upgrade, 2013, status Permit Issued); and 1 more. Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
106.8 m frontage197.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 4 building permits open, the oldest since 2012

    Needs a closer look

    Still open in the City's records: 18 246395 (Proposal to replace fire alarm system, 2018, status Work Not Started); 17 208283 (Proposed solar photovoltaic panels on roof top, 2017, status Permit Issued); 13 110379 (fire alarm panel upgrade, 2013, status Permit Issued); and 1 more.

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

10 records on file: more than at 99% of Toronto houses (median 0).

  • Building permit24 171426Closed

    REPLACEMENT OF EXISTING WINDOW AND SKYLIGHT WITH NEW

    Jul 25, 2024 · 380 GOLDHAWK TRL
  • Building permit21 228545Closed

    PROPOSAL TO REPLACE EXISTING PORTABLE CLASSROOM (1) ON EXISTING ELEMENTARY SCHOOL SITE

    Dec 13, 2021 · 380 GOLDHAWK TRL
  • Building permit21 164862Closed

    Proposal for fire alarm replacement.

    Jun 11, 2021 · 380 GOLDHAWK TRL
  • Building permit18 246395Work Not Started

    Proposal to replace fire alarm system.

    Oct 25, 2018 · 380 GOLDHAWK TRL
  • Building permit17 208283Permit Issued

    Proposed solar photovoltaic panels on roof top.

    Aug 25, 2017 · 380 GOLDHAWK TRL
  • Building permit13 129731Closed

    addition to school for FDK- all day kindergarten program BANTING AND BEST P.S.

    Jun 13, 2013 · 380 GOLDHAWK TRL
  • Building permit13 110379Permit Issued

    fire alarm panel upgrade

    Jan 24, 2013 · 380 GOLDHAWK TRL
  • Zoning review12 295970 ZPRClosed
    Dec 19, 2012 · 380 GOLDHAWK TRL
Show 2 older records
  • Building permit12 283486Inspection

    install 1 backflow device

    Dec 7, 2012 · 380 GOLDHAWK TRL
  • Building permit07 264386Closed - Dormant

    One portable classroom

    Nov 21, 2007 · 380 GOLDHAWK TRL

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
20,227 m²
Frontage
106.8 m
Depth
197.4 m
Street
Goldhawk Trl
Corner lot
No
Public lane
None
House footprint
2,896 m²roof up to 9.9 m
Back yard
105.5 mhouse to rear lot line
Side yards
14 m and 16.6 mhouse to side lot lines
Buildings on the lot
8house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    100%1 of 1 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    0

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To permit a proposed sunroom addition at the rear of the house, and a new front entrance enclosure.

      44 FLATWOODS DR · Mar 5, 2020 · 458 m away
    • Minor varianceApproved

      To permit a free-standing, drive-through restaurant at the northeast corner of the Milliken Wells Shopping Centre.

      240 ALTON TOWERS CRCL · Jul 13, 2017 · 239 m away
    • Minor varianceApproved

      To construct a one storey rear addition to the existing two storey detached dwelling.

      48 ENCHANTED HILLS CRES · Nov 3, 2016 · 315 m away
    • Minor varianceApproved

      The applicant proposes to construct an addition to house a choir area on the east side of the existing Church of the Prince of Peace. In 1986 and 1996, the Committee approved variances for reduced rates of parking and allowed 92 parking spaces on-site. A lease agreement exists between the Church and the adjacent Separate School site for an additional 30 spaces.

      265 ALTON TOWERS CRCL · Aug 22, 2007 · 243 m away
    • Minor varianceApproved

      14 Townhouse units to be sold as Freehold Condominium whereby creating 14 individual lots that will not be in compliance with the By-law.

      3358-3360 MCCOWAN RD · Dec 17, 2003 · 443 m away

    Latest activity nearby

    • Building permit

      3 Ground Signs ** TIM HORTONS **

      240 ALTON TOWERS CRCL · May 15, 2026 · 239 m away
    • Zoning review

      Re-Examined

      240 ALTON TOWERS CRCL · Jan 27, 2026 · 239 m away
    • Building permit

      New Exterior Walk-up Stairs from basement

      304 GOLDHAWK TRL · Mar 6, 2025 · 262 m away
    • Building permit

      Proposal to construct a below-grade entrance from side yard.

      14 STRAWBERRY HILLS DR · Oct 28, 2024 · 260 m away
    • Building permit

      REPLACEMENT OF EXISTING WINDOW AND SKYLIGHT WITH NEW

      380 GOLDHAWK TRL · Jul 25, 2024 · 51 m away
    • Building permit

      Proposal to construct interior alterations to set up a Herbs Steam Store

      240 ALTON TOWERS CRCL · Jun 25, 2024 · 239 m away
    • Building permit

      Proposed Fire alarm panel replacement and installation and programming for Elevator recall as per ASME 17.1-2010/CSA B144-10 Safety Code for Elevators

      240 ALTON TOWERS CRCL · Jun 17, 2024 · 239 m away
    • Building permit

      Install first party ground sign

      410 GOLDHAWK TRL · Jun 5, 2024 · 122 m away
    • Building permit

      1 Ground Sign

      410 GOLDHAWK TRL · May 23, 2024 · 122 m away
    • Building permit

      REVISION 01: Amendment:Below grade entrance+ Side Yard ShedProposed basement alterations, below grade entrance, and side yard shed.

      57 DAWNMIST CRES · Jan 23, 2024 · 175 m away

    Neighbourhood: Milliken

    About the area around the lot, not the lot itself.

    Nearest TTC stop
    McCowan Rd at Alton Towers Cir (North)6 min walk
    Nearest cycling route
    Steeles Ave ECycle Track, 6 min walk
    Nearest traffic count
    5,202 vehicles in 14 hGoldhawk Trl / Strawberry Hills Dr / Raynes Cres, 170 m away, Jun 16, 2026
    Serious collisions within 500 m
    02021–2026, killed or seriously injured
    Parks
    Goldhawk Park1 min walk
    Milliken Park6 min walk
    Audrelane Park12 min walk

    Schools within 1 km

    • BANTING AND BEST PUBLIC SCHOOL English Public 1 min walk
    • PRINCE OF PEACE CATHOLIC ELEMENTARY SCHOOL English Separate 3 min walk
    • ECOLE ELEMENTAIRE LAURE RIESE French Public 8 min walk
    • PORT ROYAL PUBLIC SCHOOL English Public 13 min walk
    • AGNES MACPHAIL PUBLIC SCHOOL English Public 13 min walk
    • THE DIVINE INFANT CATHOLIC ELEMENTARY SCHOOL & MSGR FRASIER NORTHEAST English Separate 16 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureMillikenMedian neighbourhood
    Median household income (2020)$81,000$84,500
    Households that own their home88%54%
    Population (2021)23,98016,813
    Homes built in 1960 or before2%29%
    Homes needing major repairs4%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleMillikenCity median
    Assault334.2636.3
    Robbery197.569.5
    Shootings1910.5
    Auto theft607.7192.6
    Theft over $5,000125.346.1
    Break and enter254.5172.8
    Theft from vehicles398.8188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.