HousePrecheckCheck an address

38 Lee Centre DrToronto · zoning, lot size and permit records

≈ 150.7 × 99.9 m11,610 m²on Lee Centre Dr

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 1.2 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 24 127136 (Proposal to repair and reinstate a portion of the building due to fire damage, 2024, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
  • 2 open by-law investigations at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 26 268093 PRS 00 IR (Property Standards, 2026, status Rescheduled); 26 233192 PRS 00 IR (Property Standards, 2026, status Rescheduled).

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N50 m
≈ 150.7 m frontage≈ 99.9 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (20% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • 2 open by-law investigations

    Needs a closer look

    Not resolved in the City's records: 26 268093 PRS 00 IR (Property Standards, 2026, status Rescheduled); 26 233192 PRS 00 IR (Property Standards, 2026, status Rescheduled).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Building permit open since 2024

    Needs a closer look

    Still open in the City's records: 24 127136 (Proposal to repair and reinstate a portion of the building due to fire damage, 2024, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Natural Heritage System (17% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

12 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 268093 PRS 00 IRRescheduled

    Property Standards

    Nov 10, 2026 · 38 LEE CENTRE DR
  • By-law investigation26 233192 PRS 00 IRRescheduled

    Property Standards

    Sep 5, 2026 · 38 LEE CENTRE DR
  • Building permit24 127136Inspection

    Proposal to repair and reinstate a portion of the building due to fire damage

    May 8, 2024 · 38 LEE CENTRE DR
  • Building permit23 192459Cancelled

    Proposal to repair and reinstate a portion of the building due to fire damage

    Aug 22, 2023 · 38 LEE CENTRE DR
  • Building permit14 264279Closed

    install 1 3" backflow prevention device

    Jan 5, 2015 · 38 LEE CENTRE DR
  • Building permit04 107965Closed

    INSTALL 12 MAGLOCKS IN RESIDENTIAL CONDOMINIUM

    Feb 9, 2004 · 38 LEE CENTRE DR
  • Building permit02 144918Closednew building

    HVAC - NEW 34 STOREY CONDO BUILDING "ELLIPSE EAST TOWER" - New Building

    May 5, 2003 · 38 LEE CENTRE DR
  • Building permit01 189618Closednew building

    HVAC - 30 Storey residential condominium building with two levels of underground parking - New Building

    May 5, 2003 · 38 LEE CENTRE DR
Show 4 older records
  • Building permit02 196765Closed

    Plumbing - PART FOUNDATION FOR EAST TOWER - Partial Permit - Foundation See folder 02-144918 - full permit

    Dec 19, 2002 · 38 LEE CENTRE DR
  • Building permit02 162368Closed

    PART PERMIT "SUPERSTRUCTURE" PERMIT # 01189618

    Aug 13, 2002 · 38 LEE CENTRE DR
  • Building permit01 203501Closed

    PART PERMIT FOUNDATIONS - PERMIT REFRENCE #01-189618

    May 16, 2002 · 38 LEE CENTRE DR
  • Zoning review02 105745 PSPClosed
    Jan 24, 2002 · 38 LEE CENTRE DR

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
11,610 m²
Frontage
150.7 mestimated, irregular lot
Depth
99.9 mestimated, irregular lot
Street
Lee Centre Dr
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    —no decisions on file
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    0

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      Interior alterations to the north wing to convert the existing church space into a day nursery.

      801 PROGRESS AVE · Sep 10, 2025 · 339 m away
    • Minor varianceApproved

      Landscaping and Parking Variances required from associated Consent application B0033/22SC. Cross reference associated MV application A0234/22SC. Note: This revised public notice is being issued to correctly state the variances being requested.

      124-126 MILNER AVE · May 4, 2023 · 396 m away
    • Minor varianceApproved

      Landscaping and Parking Variances required from associated Consent application B0033/22SC. Cross reference associated MV application A0235/22SC. Note: This revised public notice is being issued to correctly state the variances being requested.

      124-126 MILNER AVE · May 4, 2023 · 396 m away
    • Minor varianceApproved

      The applicant is seeking relief from the provisions of the Zoning By-law to permit an interior mezzanine addition.

      165 MILNER AVE · Mar 21, 2019 · 462 m away
    • Minor varianceApproved

      The applicant is seeking relief from the provisions of the Zoning By-law to construct a one storey industrial addition to the existing two storey building.

      165 MILNER AVE · May 31, 2018 · 462 m away

    Latest activity nearby

    • Zoning review

      Closed

      108 CORPORATE DR · Nov 11, 2026 · 185 m away
    • Building permit

      Proposed sprinkler system upgrade and relocation of exit door.

      115 MILNER AVE · Oct 15, 2026 · 297 m away
    • Building permit

      Addition of a new wall within existing Switchboard B1 Electrical Room on the second floor to accommodate new equipment layout

      740 PROGRESS AVE · Sep 1, 2026 · 189 m away
    • Building permit

      To erect and display one illuminated wall sign***SHONAN SANDWICH & SWEET***

      26 LEE CENTRE DR · Aug 31, 2026 · 164 m away
    • Building permit

      Revision 1: Revision is to include addition of new walls on the 2nd floor for conduits to pass through. Proposal to construct interior alterations for 3 new Electrical rooms on the 1st floor a and new wall to accommodate equipment removal.

      740 PROGRESS AVE · Aug 10, 2026 · 189 m away
    • Zoning review

      Notice Sent

      733-735 PROGRESS AVE · Jun 29, 2026 · 279 m away
    • Building permit

      Proposal for localized repairs to site features, waterproofing and concrete foundation.

      36 LEE CENTRE DR · May 19, 2026 · 122 m away
    • Building permit

      Proposal to install a new fire alarm system.

      36 LEE CENTRE DR · Apr 16, 2026 · 122 m away
    • Building permit

      Proposal to Install one (1) maglock on ground floor.

      740 PROGRESS AVE · Mar 16, 2026 · 189 m away
    • Building permit

      1st floor infrastructure Upgrades - CDC Replacement. Proposal to Install total of one (1) maglock, on1st floor. Please see the attached Dwg. # E4-02.

      740 PROGRESS AVE · Feb 11, 2026 · 189 m away

    Neighbourhood: Woburn North

    About the area around the lot, not the lot itself.

    Nearest station
    McCowan Rt Station15 min walk
    Nearest TTC stop
    Corporate Dr at Lee Centre Dr (West)3 min walk
    Nearest traffic count
    4,469 vehicles in 8 hLee Centre Dr / Corporate Dr, 140 m away, Mar 21, 2016
    Serious collisions within 500 m
    02021–2026, killed or seriously injured
    Parks
    Lee Centre Park1 min walk
    Hillsborough Park3 min walk
    White Haven Park8 min walk

    Schools within 1 km

    • MADINATUL ULOOM ACADEMY INC Private 6 min walk
    • MADINATUL ULOOM ISLAMIC GIRLS ACADEMY Private 7 min walk
    • AL HAADI SCHOOL Private 8 min walk
    • MADINATUL ULOOM ISLAMIC ACADEMY & OXFORD COLLEGE & FH INTERNATIONAL Private 9 min walk
    • WHITE HAVEN JR PUBLIC SCHOOL English Public 10 min walk
    • ADVANCED CHRISTIAN ACADEMY Private 11 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureWoburn NorthMedian neighbourhood
    Median household income (2020)$74,500$84,500
    Households that own their home54%54%
    Population (2021)26,58016,813
    Homes built in 1960 or before23%29%
    Homes needing major repairs8%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleWoburn NorthCity median
    Assault768.9636.3
    Robbery76.569.5
    Shootings13.910.5
    Auto theft316.6192.6
    Theft over $5,00062.646.1
    Break and enter180.9172.8
    Theft from vehicles281.8188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.