HousePrecheckCheck an address

38 Elm StToronto · zoning, lot size and permit records

Commercial residential · CR 7.8 (c2.0; r7.8) SS1 (x2193)≈ 41.2 × 52.5 m997 m²on Elm St

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.1 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 22 227965 (Proposed replacement of one cooling tower, one make-up air unit, two air handling units..., 2022, status Inspection); 19 164674 (Revision 01: redesign of the interior alterations to the unit Proposal for interior alt..., 2020, status Revision Issued); 18 159059 (Proposal for concrete restoration of balcony structure and application of waterproofing..., 2018, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 18 development applications open within 300 m, up to 85 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • 1 open by-law investigation at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 26 142308 PRS 00 IR (Property Standards, 2026, status Rescheduled).
  • Major Transit Station Area: CollegeThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
≈ 41.2 m frontage≈ 52.5 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 open by-law investigation

    Needs a closer look

    Not resolved in the City's records: 26 142308 PRS 00 IR (Property Standards, 2026, status Rescheduled).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 3 building permits open, the oldest since 2018

    Needs a closer look

    Still open in the City's records: 22 227965 (Proposed replacement of one cooling tower, one make-up air unit, two air handling units..., 2022, status Inspection); 19 164674 (Revision 01: redesign of the interior alterations to the unit Proposal for interior alt..., 2020, status Revision Issued); 18 159059 (Proposal for concrete restoration of balcony structure and application of waterproofing..., 2018, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Property Standards, Zoning): 26 240934 ZON 00 IR (Zoning, 2026); 25 162260 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 18 development applications open within 300 m

    Good to know

    18 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 85 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • 2 short-term rental registrations here

    Good to know

    2 active short-term rental registrations at this address (Condominium).

    What it means. Short-term rentals are allowed only in the operator's own principal residence, so a buyer cannot count on the same rental income. In a condo, check the building's rules too.

    How to confirm. The City's short-term rental page explains registration and the principal residence rule. Details

    City of Toronto, Short-term Rental Registrations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

14 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 240934 ZON 00 IRClosed

    Zoning

    Sep 21, 2026 · 38 ELM ST
  • By-law investigation26 142308 PRS 00 IRRescheduled

    Property Standards

    Apr 12, 2026 · 38 ELM ST
  • By-law investigation25 162260 PRS 00 IRClosed

    Property Standards

    May 20, 2025 · 38 ELM ST
  • Building permit22 227965Inspection

    Proposed replacement of one cooling tower, one make-up air unit, two air handling units, and two chillers

    Dec 12, 2022 · 38 ELM ST
  • Building permit19 164674Revision Issued

    Revision 01: redesign of the interior alterations to the unit Proposal for interior alterations to existing residential condo unit 600

    May 21, 2020 · 38 ELM ST
  • Building permit18 236670Closed

    Proposal for interior alterations to washroom and kitchen in unit 703 of the existing apartment building.

    Nov 21, 2018 · 38 ELM ST
  • Building permit18 159059Permit Issued

    Proposal for concrete restoration of balcony structure and application of waterproofing membrane.

    Jun 12, 2018 · 38 ELM ST
  • Building permit15 239414Closed

    Proposal for interior alterations to an existing vacant unit on the ground floor for a new restaurant, less than 30 seats - "Chickery"

    Nov 2, 2015 · 38 ELM ST
Show 6 older records
  • Building permit15 171290Closed

    Installation of a 4" backflow prevention device

    Jul 9, 2015 · 38 ELM ST
  • Building permit12 142879Closed

    This is for the installation of a new fire alarm on all 35 floors within this condominium building. Refer to 655 Bay Street for the associated fire alarm permit of this combined fire alarm system.

    Apr 17, 2012 · 38 ELM ST
  • Building permit12 124366Closed

    Proposal to relocated sprinkler heads and add two new sprinklers in a closet on the second floor. Tenant is a Fitness Centre.

    Feb 28, 2012 · 38 ELM ST
  • Building permit11 313244Closed - Dormant

    Plumbing - permit for interior alterations to fitness centre on second floor of existing condo building.

    Dec 1, 2011 · 38 ELM ST
  • Building permit06 111892Closed

    Install 1 hand sink in existing restaurant kitchen.

    Feb 22, 2006 · 38 ELM ST
  • Building permit02 152246Closed

    install 6 pcs antennas to rooftop. (communication tower)

    Jul 12, 2002 · 38 ELM ST

Check before you build

  • Site-specific exception 900.11.10(2193)

    Needs a closer look

    1 site-specific rule and 4 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2193)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    On a lot , public parking as a principal use in a building or structure is not permitted. [TO: 438-86; 12(2) 132]

  2. Older by-law A

    Section 12(1) 397 of former City of Toronto By-law 438-86

  3. Older by-law B

    Section 12(2) 111 of former City of Toronto By-law 438-86

  4. Older by-law C

    Section 12(2) 256 of former City of Toronto By-law 438-86

  5. Older by-law D

    On 655 Bay St., 38 Elm St., former City of Toronto by-law 881-88. Prevailing By-laws and Prevailing Sections: (A) Section 12(1) 397 of former City of Toronto By-law 438-86; (B) Section 12(2) 111 of former City of Toronto By-law 438-86; (C) Section 12(2) 256 of former City of Toronto By-law 438-86; and (D) On 655 Bay St., 38 Elm St., former City of Toronto by-law 881-88.

By-law 569-2013, Chapter 900

Lot facts

Area
997 m²
Frontage
41.2 mestimated, irregular lot
Depth
52.5 mestimated, irregular lot
Street
Elm St
Corner lot
No
Public lane
None
Max height
61 m
Max lot coverage
—
  • Major Transit Station Area: College. The lot is inside the College Major Transit Station Area approved by the Province (Site and Area Specific Policy 603). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Priority retail street: Elm Street. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 7.8 (c2.0; r7.8) SS1 (x2193) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
92%11 of 12 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
31

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 12 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building.

    332 YONGE ST · Oct 14, 2026 · 149 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 588-2025) for a new 15-storey mixed-use building (East Block fronting Bay Street), by increasing the podium portions of the building heights, equipment height projections, and reducing the minimum height of the first storey. Also, the new 43-storey mixed-use building (West Block fronting Elizabeth Street) will be reducing the size of one parking space length. This is currently being reviewed under Site Plan Control (File Number 20 25 197844 STE 11 SA). There will be a total of 827 purpose-built rental units on this lot (617 residential dwelling units, and 210 affordable dwelling units).

    130 ELIZABETH ST · Jan 14, 2026 · 288 m away
  • Minor varianceApproved

    To permit a place of amusement (arcade) use on this subject lot.

    247 YONGE ST · Jan 8, 2025 · 422 m away
  • Minor varianceApproved

    To construct a new 12-storey mixed-use building with a total of 30 residential dwelling units and two non-residential (commercial) units on this lot. The property owner will be undergoing a Site Plan Control application.

    203 DUNDAS ST W · Oct 16, 2024 · 458 m away
  • Minor varianceApproved

    To alter the development standards for a residential building approved under Site Specific Zoning By-law 1070-2004(OLT) by updating the mechanical systems (including new rooftop enclosed elements and conduit risers at exterior facade of building), which requires modification of the exterior cladding to extend approximately 140 mm beyond the existing cladding.

    50 GERRARD ST E · Jan 31, 2024 · 406 m away

Latest activity nearby

  • Building permit

    Proposal for replacement of existing windows of office floors from Level 2-24.

    700 BAY ST · Nov 24, 2026 · 136 m away
  • Zoning review

    Closed

    335 YONGE ST · Nov 23, 2026 · 209 m away
  • Building permit

    Proposal for interior demolition of existing office floors from Level 2 - 24.

    700 BAY ST · Nov 23, 2026 · 136 m away
  • Building permit

    POST-TENSIONED CABLE REPLACEMENT, LOCALIZED CONCRETE REPAIRS, NEW WATERPROOFING INSTALLATION

    201 ELIZABETH ST · Nov 20, 2026 · 296 m away
  • Building permit

    Four wall signs.***INTERNATIONAL BUSINESS UNIVERSITY***

    655 BAY ST · Nov 19, 2026 · 56 m away
  • Building permit

    Proposed an interior alteration

    595 BAY ST · Nov 19, 2026 · 179 m away
  • Building permit

    Revision No.1: To change Occupancy Type to B1, No new constructionProposal for interior renovation to room 7A refresh mental health pod - 2hr rating and door/hardware replacement, 1 new toilet and 1 fire damper

    170 ELIZABETH ST · Nov 18, 2026 · 259 m away
  • Building permit

    INTERIOR ALTERATIONS AND CHANGE OF USE FROM YOGA STUDIO TO DANCE STUDIO

    121 DUNDAS ST W · Nov 17, 2026 · 285 m away
  • Building permit

    Proposed interior alterations to replace existing revolving door with security gate.See approved AS permit 26-229850-AS

    686 BAY ST · Nov 17, 2026 · 109 m away
  • Building permit

    Proposed interior alterations to an existing office suite, including demolition and construction of interior partitions, millwork, and associated mechanical, electrical, plumbing, sprinkler, and fire alarm modifications. Suite 401

    595 BAY ST · Nov 9, 2026 · 179 m away

Neighbourhood: Yonge-Bay Corridor

About the area around the lot, not the lot itself.

Nearest station
College Station4 min walk
Nearest TTC stop
Bay St at Elm St2 min walk
Nearest cycling route
Bay StBike Lane, 1 min walk
Nearest traffic count
21,755 vehicles in 14 hBay St / Elm St, 90 m away, Oct 9, 2025
Serious collisions within 500 m
132021–2026, killed or seriously injured: 3 fatal, 9 with pedestrians, 3 with cyclists
Parks
College Park2 min walk
Toronto Metropolitan University Square5 min walk
Joseph Sheard Parkette5 min walk

Schools within 1 km

  • TORONTO METROPOLITAN UNIVERSITY - ENTR TO BUSINESS SCHOOL LOBBY University 4 min walk
  • TMU - HEASLIP HOUSE University 5 min walk
  • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF IMAGE ARTS University 6 min walk
  • TORONTO METROPOLITAN UNIVERSITY - THEATRE SCHOOL University 6 min walk
  • TMU - HEIDELBERG CENTRE SCHOOL OF GRAPHIC COMM'NS MGMT University 7 min walk
  • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 7 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureYonge-Bay CorridorMedian neighbourhood
Median household income (2020)$68,500$84,500
Households that own their home32%54%
Population (2021)12,64516,813
Homes built in 1960 or before2%29%
Homes needing major repairs2%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleYonge-Bay CorridorCity median
Assault3361.1636.3
Robbery300.169.5
Homicide125.3
Shootings1210.5
Auto theft162.1192.6
Theft over $5,000210.146.1
Break and enter552.2172.8
Theft from vehicles402.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.