HousePrecheckCheck an address

38 Cecil StToronto · zoning, lot size and permit records

Also 40 Cecil St

Residential · R (f4.5; d1.0) (x835)39.3 × 56.9 m2,180 m²on Huron Stcorner, also on Cecil Stbacks onto Ln N Cecil E Huron

Not a home

Cecil Street Parkette/Hydro Transformer Station

The City of Toronto's real estate inventory lists Cecil Street Parkette/Hydro Transformer Station here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelStill open in the City's records: 20 164617 (Revision 01 - to assemble busbar cable conduits over the buildings roofProposal for str..., 2022, status Revision Issued); 11 130481 (Proposal to install 1 backflow prevention device and 1 hotwater tank in existing Hydro..., 2011, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 1 development application open within 300 m, up to 31 storeysNew buildings may go up around here in the next years. More change nearby than at 96% of Toronto houses.
  • Major Transit Station Area: Queens ParkThe City plans more homes around the station: good for transit, and more building over time.
N20 m
39.3 m frontage56.9 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2011

    Needs a closer look

    Still open in the City's records: 20 164617 (Revision 01 - to assemble busbar cable conduits over the buildings roofProposal for str..., 2022, status Revision Issued); 11 130481 (Proposal to install 1 backflow prevention device and 1 hotwater tank in existing Hydro..., 2011, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Order Issued Property Standards, Property Standards): 25 210415 PRS 00 IV (Order Issued Property Standards, 2025); 25 205433 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 31 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • By-law investigation25 210551 WST 00 IVClosed

    Notice Issued Waste: Owner of land failed to clean and clear refuse that has been thrown, placed, dumped or deposited, including but not limited to

    Aug 14, 2025 · 38 CECIL ST
  • By-law investigation25 210541 WST 00 IRClosed

    Waste

    Aug 14, 2025 · 38 CECIL ST
  • By-law investigation25 210415 PRS 00 IVClosed

    Order Issued Property Standards

    Aug 5, 2025 · 38 CECIL ST
  • By-law investigation25 205433 PRS 00 IRClosed

    Property Standards

    Aug 5, 2025 · 38 CECIL ST
  • Building permit20 164617Revision Issued

    Revision 01 - to assemble busbar cable conduits over the buildings roofProposal for structural modifications to assemble busbar cable conduits on the rooftop of existing Hydro Transformer Substation.

    Feb 4, 2022 · 38 CECIL ST
  • Building permit21 166600Closed

    PROPOSED: Installation of emergency backup sump pit and pump, and discharge line to exiting sanitary manhole for basement level floor drains.

    Jun 30, 2021 · 38 CECIL ST
  • Building permit11 130481Permit Issued

    Proposal to install 1 backflow prevention device and 1 hotwater tank in existing Hydro Substation.

    Mar 22, 2011 · 38 CECIL ST

Check before you build

  • Site-specific exception 900.2.10(835)

    Needs a closer look

    1 site-specific rule and 5 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(835)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The lands must comply with exception 900.2.10(4).

  2. Older by-law A

    Section 12(1) 116 of former City of Toronto By-law 438-86

  3. Older by-law B

    Section 12(1) 233 of former City of Toronto By-law 438-86

  4. Older by-law C

    Section 12(2) 256 of former City of Toronto By-law 438-86

  5. Older by-law D

    Section 12(5)(h) of former City of Toronto By-law 438-86

  6. Older by-law H

    On 38 Cecil St., former City of Toronto by-law 699-82

6 parts for other addresses
  • E On or between the even numbered addresses of 40-42 Baldwin St., the odd numbered addresses of 181-201A Beverley St., the odd numbered addresses of 201-203 …
  • F On the lands municipally known as 136 Beverley St. in 1988, Section 12(2) 77 of former City of Toronto By-law 438-86
  • G On 206 Beverley St., former City of Toronto by-law 20-72
  • I On the even numbered addresses of 30-36 D'Arcy St., former City of Toronto by-law 82-93
  • J On 6 Henry St., former City of Toronto by-law 42-76
  • K On 125 Huron St., former City of Toronto by-law 9420.
By-law 569-2013, Chapter 900

Lot facts

Area
2,180 m²
Frontage
39.3 m
Depth
56.9 m
Street
Huron St
Corner lot
Yes, also on Cecil St56.9 m along it
Public lane
Ln N Cecil E Huron, 63.4 m along it
House footprint
518 m²roof up to 15.8 m
Back yard
14.3 mhouse to rear lot line
Side yards
6.6 m and 16.2 mhouse to side lot lines
Buildings on the lot
4house, garage, sheds
Max height
13 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Queens Park. The lot is inside the Queens Park Major Transit Station Area approved by the Province (Site and Area Specific Policy 611). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Minimum frontage 4.5 m. Frontage is about 39.3 m: meets the zone minimum. Source
  • Zone R (f4.5; d1.0) (x835) (Residential). Chapter 10, section 10.10 of the by-law. Source

Around this lot

Minor variances approved
95%18 of 19 decisions
Garden suite permits
3
Laneway suite permits
9
Multiplex permits
24
Development applications
11

Within 300 m, last 10 years. 36 suite and multiplex permits: more than at 96% of Toronto houses (median 3). 19 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing rear two-storey detached ancillary building (containing one laneway suite and a two-car garage, abutting the laneway) by constructing a one-storey addition (patio enclosure) on the south side of this building. There is a total of two residential dwelling units on this lot (one unit within the main building and one unit within the ancillary building).

    122 D'ARCY ST · Jul 15, 2026 · 265 m away
  • Minor varianceApproved

    To construct a new two-storey detached ancillary building (containing one garden suite), with a cantilevered second storey in the rear yard. There will be a total of five residential dwelling units on this lot (four units within the main dwelling, and one unit within the ancillary building).

    23 ROSS ST · Apr 1, 2026 · 125 m away
  • Minor varianceApproved

    To alter the existing three-storey mixed-use building by converting the existing office space (Unit 1 located within the basement at the southern portion of the building) into medical office space with accessory uses.

    150 BEVERLEY ST · Nov 19, 2025 · 332 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing rear additions on the first and third levels.

    32 E OXFORD ST · Sep 3, 2025 · 337 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a complete third storey addition, and a new rear three-storey addition (with a basement walkout level). Also, to construct a rear exterior staircase that will access each level. There will be a total of 4 residential dwelling units on this lot. The existing rear two-storey ancillary building will be maintained and unaltered.

    28 D'ARCY ST · Feb 26, 2025 · 371 m away

Latest activity nearby

  • Consent (lot split)Pending

    To obtain consent for the technical severance of the property for the purpose of re-establishing two lots which merged on title.

    130 D'ARCY ST · Dec 9, 2026 · 273 m away
  • Zoning review

    Not Started

    462 SPADINA AVE · Nov 23, 2026 · 263 m away
  • Building permit

    2 wall signs + 1 projecting sign**CHERUBIN**

    315 SPADINA AVE · Nov 20, 2026 · 299 m away
  • Minor variancePending

    Accepted

    77 BALDWIN ST · Nov 17, 2026 · 194 m away
  • Building permitsecondary suite

    Revision 01: interior alterations and a 3 storey addition at rear yard. Proposed interior layout modification and 3 storey addition/extension at rear yard. --Party Wall Admin Permits- 2026 216781 BLD 00 SR

    221 BEVERLEY ST · Nov 12, 2026 · 181 m away
  • Building permit

    Interior alterations, HVAC & plumbing. Conversion of existing Heydon Park Secondary School to elementary school.

    70 D'ARCY ST · Nov 10, 2026 · 288 m away
  • Building permit

    Proposal for repair and reinstate a portion of the dwelling due to vehicle impact damage

    196 BEVERLEY ST · Nov 10, 2026 · 159 m away
  • Building permitmultiplex

    Interior alteration to existing apartment 1&2 (first floor) of existing 3 storey Multi Tennant Residential detached dwelling. Replacement of existing basement stair enclosure.

    198 BEVERLEY ST · Nov 9, 2026 · 152 m away
  • Building permit

    Proposal for sprinkler modification and fire alarm audible device relocation in the fitness room.

    251 COLLEGE ST · Nov 4, 2026 · 189 m away
  • Building permitsecondary suite

    Proposed interior alterations, 3rd floor addition, and basement walk-out in front yard.

    77 BALDWIN ST · Oct 28, 2026 · 194 m away

Neighbourhood: Kensington-Chinatown

About the area around the lot, not the lot itself.

Nearest station
Queen's Park Station10 min walk
Nearest TTC stop
College St at Beverley St3 min walk
Nearest cycling route
Beverley StBike Lane, 3 min walk
Nearest traffic count
1,732 vehicles in 8 hCecil St / Huron St, 50 m away, Mar 28, 2013
Serious collisions within 500 m
102021–2026, killed or seriously injured: 1 fatal, 5 with pedestrians, 5 with cyclists
Parks
Julius Deutsch Park1 min walk
Glasgow Street Parkette2 min walk
Lillian H. Smith Park2 min walk

Schools within 1 km

  • BRAEMAR COLLEGE PRIVATE SECONDARY SCHOOL Private 2 min walk
  • BEVERLEY & SUBWAY ACADEMY TWO English Public 3 min walk
  • CORNERSTONE PREPARATORY SCHOOL - MAIN CAMPUS Private 4 min walk
  • HEYDON PARK SECONDARY SCHOOL English Public 5 min walk
  • RONALD MCDONALD HOUSE Private 6 min walk
  • ORDE STREET JR PUBLIC SCHOOL English Public 7 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureKensington-ChinatownMedian neighbourhood
Median household income (2020)$62,000$84,500
Households that own their home32%54%
Population (2021)18,12016,813
Homes built in 1960 or before26%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleKensington-ChinatownCity median
Assault2017.5636.3
Robbery19369.5
Shootings21.910.5
Auto theft118.4192.6
Theft over $5,000219.346.1
Break and enter443172.8
Theft from vehicles850.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.