HousePrecheckCheck an address

38 Barton AveToronto · zoning, lot size and permit records

Residential · R (d0.6)≈ 23.6 × 37.8 m678 m²on Barton Avecorner, also on Markham St

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 4 storeys, 18 rental units, built 1919More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelStill open in the City's records: 99 107668 (Fire alarm and emergency lighting retrofit, 2000, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 1 development application open within 300 m, up to 3 storeysNew buildings may go up around here in the next years. More change nearby than at 76% of Toronto houses.
  • City upkeep score: 75 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: BathurstThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
≈ 23.6 m frontage≈ 37.8 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2000

    Needs a closer look

    Still open in the City's records: 99 107668 (Fire alarm and emergency lighting retrofit, 2000, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 22 by-law investigations closed in the last two years

    Good to know

    Closed files (Order Issued Property Standards, Property Standards): 26 262217 PRS 00 IV (Order Issued Property Standards: The supplied piece(s) of equipment and/or appliance(s)..., 2026); 26 261017 PRS 00 IR (Property Standards, 2026); 26 210780 PRS 00 IR (Property Standards, 2026); and 19 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 75 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (4 storeys, 18 units, built 1919).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

23 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 262217 PRS 00 IVClosed

    Order Issued Property Standards: The supplied piece(s) of equipment and/or appliance(s) in or on the property is not kept in a satisfactory working condition.

    Oct 27, 2026 · 38 BARTON AVE
  • By-law investigation26 261017 PRS 00 IRClosed

    Property Standards

    Oct 27, 2026 · 38 BARTON AVE
  • By-law investigation26 210780 PRS 00 IRClosed

    Property Standards

    Jul 29, 2026 · 38 BARTON AVE
  • By-law investigation26 195942 PRS 00 IRClosed

    Property Standards

    Jul 4, 2026 · 38 BARTON AVE
  • By-law investigation26 161839 PRS 00 IRClosed

    Property Standards

    May 16, 2026 · 38 BARTON AVE
  • By-law investigation26 161763 PRS 00 IRClosed

    Property Standards

    May 16, 2026 · 38 BARTON AVE
  • By-law investigation26 161677 PRS 00 IRClosed

    Property Standards

    May 15, 2026 · 38 BARTON AVE
  • By-law investigation26 158684 PRS 00 IRClosed

    Property Standards

    May 11, 2026 · 38 BARTON AVE
Show 15 older records
  • By-law investigation26 156966 PRS 00 IRClosed

    Property Standards

    May 7, 2026 · 38 BARTON AVE
  • By-law investigation26 148942 PRS 00 IVClosed

    Order Issued Property Standards: Interior door(s), frames(s), glass pane(s), and/or hardware not maintained in good repair.

    Apr 18, 2026 · 38 BARTON AVE
  • By-law investigation26 146187 PRS 00 IRClosed

    Property Standards

    Apr 18, 2026 · 38 BARTON AVE
  • By-law investigation25 262011 PRS 00 IVClosed

    Order Issued Property Standards

    Nov 21, 2025 · 38 BARTON AVE
  • By-law investigation25 256993 PRS 00 IRClosed

    Property Standards

    Nov 21, 2025 · 38 BARTON AVE
  • By-law investigation25 241645 PRS 00 IRClosed

    Property Standards

    Oct 18, 2025 · 38 BARTON AVE
  • By-law investigation25 202792 PRS 00 IVClosed

    Order Issued Property Standards: Ceiling not maintained free of holes, cracks, damaged and deteriorated materials.

    Jul 25, 2025 · 38 BARTON AVE
  • By-law investigation25 199723 PRS 00 IRClosed

    Property Standards

    Jul 25, 2025 · 38 BARTON AVE
  • By-law investigation25 127703 PRS 00 IRClosed

    Property Standards

    Mar 11, 2025 · 38 BARTON AVE
  • By-law investigation25 101493 PRS 00 IRClosed

    Property Standards

    Jan 6, 2025 · 38 BARTON AVE
  • By-law investigation25 100748 PRS 00 IVClosed

    Order Issued Property Standards: The plumbing system is not kept free from leaks or defects.

    Jan 3, 2025 · 38 BARTON AVE
  • By-law investigation25 100658 PRS 00 IRClosed

    Property Standards

    Jan 3, 2025 · 38 BARTON AVE
  • By-law investigation25 100560 PRS 00 IRClosed

    Property Standards

    Jan 3, 2025 · 38 BARTON AVE
  • By-law investigation24 252083 PRS 00 IRClosed

    Property Standards

    Dec 19, 2024 · 38 BARTON AVE
  • Building permit99 107668Inspection

    Fire alarm and emergency lighting retrofit.

    Jan 5, 2000 · 38 BARTON AVE

Lot facts

Area
678 m²
Frontage
23.6 mestimated, irregular lot
Depth
37.8 mestimated, irregular lot
Street
Barton Ave
Corner lot
Yes, also on Markham St37.8 m along it
Public lane
None
House footprint
496 m²roof up to 19.8 m
Back yard
0.9 mhouse to rear lot line
Side yards
0 m and 9.8 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
1house, garage, sheds
Max height
11 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Bathurst. The lot is inside the Bathurst Major Transit Station Area approved by the Province (Site and Area Specific Policy 661). Source
  • Zone R (d0.6) (Residential). Chapter 10, section 10.10 of the by-law. Source
  • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: hackberry (8 cm), oak, swamp white (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
91%70 of 77 decisions
Garden suite permits
2
Laneway suite permits
12
Multiplex permits
10
Development applications
3

Within 300 m, last 10 years. 24 suite and multiplex permits: more than at 91% of Toronto houses (median 3). 77 variance decisions: more than at 98% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceRefused

    To construct a new rear two-storey detached ancillary building (containing a garden suite) with a new rear walkway and two bicycle parking spaces in the rear yard. There will be a total of two residential dwelling units on this lot (one unit within the main dwelling and one unit in the ancillary building). The existing two-storey ancillary building (shed) will be demolished.

    179 HOWLAND AVE · Oct 21, 2026 · 467 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half storey semi-detached dwelling by constructing a rear one-storey ground floor addition with a second storey terrace above, and a new rear ground floor deck with stairs. The existing rear walkout basement, rear enclosed porch with stairs, and rear storage space will be demolished.

    679 EUCLID AVE · Oct 21, 2026 · 473 m away
  • Minor varianceApproved

    To construct a one-storey detached ancillary building (gym) with a covered porch (located at the northeast corner of the building), in the rear yard.

    11 BARTON AVE · Oct 14, 2026 · 279 m away
  • Minor varianceApproved

    To alter the existing three-storey semi-detached dwelling by enclosing the rear third storey balcony into habitable space.

    774 MARKHAM ST · Sep 9, 2026 · 95 m away
  • Minor varianceApproved

    To alter the existing three-storey townhouse dwelling by constructing a rear third storey addition above the rear two-storey portion of the dwelling.

    735 MARKHAM ST · Aug 12, 2026 · 52 m away

Latest activity nearby

  • Building permitsecondary suite

    REV01: Proposal for revisions to 24 235092 BLD 00 SR to create a second unit.Proposal for interior alterations and rear deck

    31 OLIVE AVE · Nov 23, 2026 · 212 m away
  • Building permit

    Administrative party permit in conjunction with the building permit for 60 Olive Ave.

    62 OLIVE AVE · Nov 17, 2026 · 294 m away
  • Building permitsecondary suite

    Rev 01: Permit RevisionInterior alterations to an existing semi-detached dwelling, including the remodeling of existing kitchens and washrooms. Work involves strictly non-load-bearing partition removals and layout modifications on the main and second floors. A new washroom is proposed on the third floor, which will be equipped with a mechanical exhaust fan vented to the exterior. The project also includes the vertical enlargement of one existing window on the rear third-floor elevation. The existing finished basement is to remain completely unaltered; no secondary suite, separate entrance, or change of major occupancy is proposed.

    587 PALMERSTON AVE · Nov 17, 2026 · 229 m away
  • Building permit

    Party wall admin permit for work at 774 Markham St. Permit no. 26-251105 BLD 00 SR.

    776 MARKHAM ST · Nov 16, 2026 · 98 m away
  • Building permit

    Backwater valve

    865 BATHURST ST · Oct 23, 2026 · 176 m away
  • Building permit

    Replacement of passenger elevator between eastbound platform and concourse level of the Station. Minor concrete work at elevator lintels and jambs repairs to damaged walls, Minor concrete repairs within pit, re-level pit to provide slope to drain, replacement of CCTV camera and connection of elevator to FA system for recall, including lobby FAIDs. Replacement of existing HVAC system.

    819 BATHURST ST · Oct 20, 2026 · 292 m away
  • Zoning review

    Notice Sent

    80 BARTON AVE · Oct 15, 2026 · 197 m away
  • Minor varianceApproved

    To construct a one-storey detached ancillary building (gym) with a covered porch (located at the northeast corner of the building), in the rear yard.

    11 BARTON AVE · Oct 14, 2026 · 279 m away
  • Building permit

    Administrative Permit to Underpin Shared Party Wall (10m) related to 25 253762 BLD 00 SR (18 BARTON AVE)

    16 BARTON AVE · Oct 14, 2026 · 140 m away
  • Building permit

    Proposed one-storey rear addition to an existing two-storey semi-detached home and a basement bathroom

    60 OLIVE AVE · Oct 8, 2026 · 291 m away

Neighbourhood: Annex

About the area around the lot, not the lot itself.

Nearest station
Bathurst Station6 min walk
Nearest TTC stop
Bathurst St at Barton Ave2 min walk
Nearest cycling route
Barton AveSigned Route (No Pavement Markings), 1 min walk
Nearest traffic count
1,642 vehicles in 8 hBarton Ave / Markham St, 30 m away, Oct 12, 2005
Serious collisions within 500 m
52021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 1 with cyclists
Parks
Monsignor Fraser College Park2 min walk
Ed and Anne Mirvish Parkette4 min walk
St. Alban's Square4 min walk

Schools within 1 km

  • MONSIGNOR FRASER COLLEGE - ANNEX CAMPUS English Separate 1 min walk
  • PALMERSTON AVENUE JR PUBLIC SCHOOL English Public 2 min walk
  • ROYAL ST GEORGES COLLEGE SCHOOL - MAIN ADDRESS Private 5 min walk
  • ROYAL ST GEORGES COLLEGE SCHOOL - SEE HOUSE Private 5 min walk
  • ROYAL ST GEORGE'S COLLEGE- SR SCHOOL Private 5 min walk
  • ROYAL ST GEORGE'S COLLEGE SCHOOL - JR SCHOOL Private 5 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureAnnexMedian neighbourhood
Median household income (2020)$85,000$84,500
Households that own their home41%54%
Population (2021)29,30016,813
Homes built in 1960 or before40%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleAnnexCity median
Assault1080.9636.3
Robbery80.569.5
Homicide5.25.3
Shootings5.210.5
Auto theft116.9192.6
Theft over $5,000114.346.1
Break and enter387.1172.8
Theft from vehicles220.9188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.