HousePrecheckCheck an address

370 Hopewell AveToronto · zoning, lot size and permit records

Also 380 Hopewell Ave, 390 Hopewell Ave, 400 Hopewell Ave

92.4 × 41.0 m3,633 m²on Hopewell Ave

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.4 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
92.4 m frontage41.0 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    9 records on file: more than at 99% of Toronto houses (median 0).

    • Building permit21 169433Closed

      Construct interior alterations due to fire damage to units 116,117,118,217,218,219, 220 and 221

      Jun 28, 2021 · 370 HOPEWELL AVE
    • Building permit21 158456Closed

      Proposal for hvac restoration work to units 116,117,118,217,218,219,220 due to fire damage in the existing stacked townhouses

      May 27, 2021 · 370 HOPEWELL AVE
    • Building permit21 108384Closed

      Proposal for hvac restoration work to units 111, 112, 113, 212, 213, 214 due to fire damage in the existing apartment building.

      Jan 29, 2021 · 370 HOPEWELL AVE
    • Building permit20 220847Closed

      Proposal for restoration work to units 111, 212 & 214 due to fire damage.

      Dec 17, 2020 · 370 HOPEWELL AVE
    • Building permit20 203823Closed

      Proposal for the partial demolition of units 111, 212, and 214 as a result of fire damage - refer to drawings.

      Nov 10, 2020 · 370 HOPEWELL AVE
    • Development application16 137285 NNY 15 CDClosed

      Application for a standard residential condominium to register 81 residential units and 97 underground parking spaces.

      Apr 7, 2016 · 396 HOPEWELL AVE
    • Building permit13 169375Closeddemolition

      Demolition of two storey industrial manufacturing plant

      Jun 25, 2013 · 400 HOPEWELL AVE
    • Development application11 259822 NNY 15 SAClosed

      The proposed development is comprised of a combination of stack townhouse buildings, arranged in four blocks. A total of 102 dwelling units are proposed for the site and will consist of 67 one-bedroom units and 25 two-bedroom. A private driveway is proposed off Hopewell Avenue which will allow access to the parking level. A total of 110 parking spaces are provided for residents and visitors.

      Aug 18, 2011 · 396 HOPEWELL AVE
    Show 1 older records
    • Development application11 259843 NNY 15 OZClosed

      The proposed development is comprised of a combination of stack townhouse buildings, arranged in four blocks. A total of 102 dwelling units are proposed for the site and will consist of 67 one bedroom units and 35 two-bedroom. A private driveway is proposed off Hopewell Avenue which will allow access to the parking level. A total of 110 parking spaces are provided for residents and visitors. REVISED proposal for 81 stacked back to back townhouses (66 2 bedroom, 15 1 bedroom units) with 95 parking space.

      Aug 18, 2011 · 396 HOPEWELL AVE

    Check before you build

    • Zoning not in By-law 569-2013

      Needs a closer look

      This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

      Zoning By-law 569-2013

    Lot facts

    Area
    3,633 m²
    Frontage
    92.4 m
    Depth
    41 m
    Street
    Hopewell Ave
    Corner lot
    No
    Public lane
    None
    Max height
    —
    Max lot coverage
    —

      Around this lot

      Minor variances approved
      82%36 of 44 decisions
      Garden suite permits
      6
      Laneway suite permits
      0
      Multiplex permits
      15
      Development applications
      0

      Within 300 m, last 10 years. 21 suite and multiplex permits: more than at 89% of Toronto houses (median 3). 44 variance decisions: more than at 79% of Toronto houses (median 19).

      Recent variance decisions in the same zone

      • Minor varianceApproved

        To permit a home occupation - personal service shop use within the existing detached garage in the rear yard of the property.

        391 WHITMORE AVE · Oct 29, 2026 · 142 m away
      • Minor varianceApproved

        To construct a three-storey detached fourplex in conjunction with a two-storey laneway suite at the rear of the property.

        101 LIVINGSTONE AVE · Oct 15, 2026 · 312 m away
      • Minor varianceApproved

        To legalize and maintain the existing detached garage as re-constructed.

        405 WHITMORE AVE · Sep 3, 2026 · 164 m away
      • Minor varianceRefused

        To construct a new detached house with a rear terrace.

        416 RIDELLE AVE · Aug 20, 2026 · 359 m away
      • Minor varianceApproved

        To alter the existing one-storey detached dwelling by constructing a second storey addition.

        57 FAIRLEIGH CRES · Aug 6, 2026 · 420 m away

      Latest activity nearby

      • Building permitmultiplex

        REV01: Proposal to revise building permit plans as noted on plans.Addition to existing basement and first floor, new second and third floor additions. Rear balconies, stairs and underpinning of existing basement.

        30 DANESBURY AVE · Nov 6, 2026 · 264 m away
      • Minor variancePending

        To legalize and maintain the existing one-storey front addition (porch enclosure).

        94 LIVINGSTONE AVE · Nov 5, 2026 · 272 m away
      • Zoning review

        Application On Hold

        980 ROSELAWN AVE · Oct 30, 2026 · 134 m away
      • Minor varianceApproved

        To permit a home occupation - personal service shop use within the existing detached garage in the rear yard of the property.

        391 WHITMORE AVE · Oct 29, 2026 · 142 m away
      • Building permit

        Proposed rear addition and one storey addition above the existing detached house, with a new partially covered rear deck, a rear basement walkout, and new front stairs. Also, to construct a new ancillary structure and an inground swimming pool in the rear yard.

        483 RIDELLE AVE · Oct 14, 2026 · 277 m away
      • Zoning review

        Closed

        978 ROSELAWN AVE · Oct 5, 2026 · 134 m away
      • Building permitnew building, new house

        Revision to add the 3rd floor.Proposal to construct a two storey dwelling.

        385 WHITMORE AVE · Oct 5, 2026 · 140 m away
      • Building permit

        To upgrade water service line from property to City's portion

        367 HOPEWELL AVE · Oct 1, 2026 · 59 m away
      • Zoning review

        Notice Sent

        22 BELGRAVIA AVE · Sep 25, 2026 · 289 m away
      • Consent (lot split)Pending

        To obtain consent to sever the property into two residential properties. These lands were subject to a previous consent application (B070/13NY) however as the conditions were not satisfied within the required one year time period, the consent lapsed.

        26 DANESBURY AVE · Sep 18, 2026 · 239 m away

      Neighbourhood: Briar Hill-Belgravia

      About the area around the lot, not the lot itself.

      Nearest station
      Oakwood Station6 min walk
      Nearest TTC stop
      Roselawn Ave at Times Rd3 min walk
      Nearest cycling route
      Beltline TrlMulti-Use Trail, 1 min walk
      Nearest traffic count
      9,082 vehicles in 14 hRoselawn Ave / Danesbury Ave, 130 m away, Mar 10, 2026
      Serious collisions within 500 m
      62021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 1 with cyclists
      Parks
      Kay Gardner Beltline Park1 min walk
      Walter Saunders Memorial Park2 min walk
      J.T. Watson Parkette8 min walk

      Schools within 1 km

      • ST THOMAS AQUINAS CATHOLIC ELEMENTARY SCHOOL English Separate 9 min walk
      • STS COSMAS AND DAMIAN CATHOLIC ELEMENTARY SCHOOL English Separate 11 min walk
      • FAIRBANK PUBLIC SCHOOL English Public 13 min walk
      • LYCEE FRANCAIS DE TORONTO Private 14 min walk
      • J R WILCOX COMMUNITY SCHOOL English Public 14 min walk
      • WEST PREPARATORY JR PUBLIC SCHOOL English Public 15 min walk

      Being near a school does not mean the lot is in its catchment; check with the board.

      2021 Census

      FigureBriar Hill-BelgraviaMedian neighbourhood
      Median household income (2020)$81,000$84,500
      Households that own their home48%54%
      Population (2021)14,57516,813
      Homes built in 1960 or before37%29%
      Homes needing major repairs9%7%

      Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

      Police-reported crime, 2025

      Per 100,000 peopleBriar Hill-BelgraviaCity median
      Assault684.5636.3
      Robbery73.369.5
      Shootings12.210.5
      Auto theft262.8192.6
      Theft over $5,00048.946.1
      Break and enter207.8172.8
      Theft from vehicles146.7188.1

      Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

      Something here not right?

      Sources

      • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
      • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
      • Development applications: Rezoning, site plan, subdivision and condominium applications.
      • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
      • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
      • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
      • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
      • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
      • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
      • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
      • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
      • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
      • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
      • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
      • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
      • Address points: loaded Nov 29, 2026, published Nov 27, 2026
      • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
      • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
      • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
      • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
      • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
      • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
      • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
      • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
      • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
      • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
      • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
      • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
      • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
      • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
      • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
      • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
      • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
      • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
      • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
      • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
      • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
      • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
      • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
      • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
      • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
      • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
      • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
      • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
      • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
      • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
      • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
      • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
      • School locations: loaded Oct 14, 2026, published May 27, 2026
      • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
      • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
      • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
      • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
      • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
      • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
      • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
      • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
      • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
      • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
      • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
      • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
      • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
      • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

      Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

      Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

      Flag an error

      What is not right?

      The problem

      The records come from the City's open data; we check each flag against them. Your email is used only to answer this.