Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
TRCA regulated area (100% of lot)
Needs a closer lookPart of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.
What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.
How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details
Ontario Regulation 41/24, TRCA Regulation LimitRavine and natural feature protection (100% of lot)
Needs a closer lookPart of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.
What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.
How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details
Toronto Municipal Code, Chapter 658Natural Heritage System (100% of lot)
Good to knowPart of the lot is in the Natural Heritage System shown on Official Plan Map 9.
What it means. New buildings or additions in that part need a natural heritage impact study.
How to confirm. City Planning confirms the policies that apply. Details
City of Toronto Official Plan, Map 9Work or applications in progress
Good to knowRecent records on this lot: 25 125964 (Workshop and transfer station will be used by contractor STRABAG Eglinton Project for A..., 2025).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications1 Committee of Adjustment file on this lot
Good to know1 approved. A0114/19EYK (To construct a TTC Access Hub on the northeast corner of Jane Street and Eglinton Avenu..., 2019).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)1 development application open within 300 m
Good to know1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 14 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
7 records on file: more than at 97% of Toronto houses (median 0).
- Development application26 212122 WET 05 SAClosed
Proposed standalone facility designed to accommodate critical equipment required to supplytraction power to the transit line. At street level, the building is conceived as a single-storey structure.
Jul 31, 2026 · 3650 EGLINTON AVE W · City file - Building permit25 151447Closed
REV 01: Approxiately 70m^2 maintenance shed. 1.2m foundations to support modular steel struture, pre-finished metal panel and 2430mm fence enclosed yard.Proposal to construct a new maintenance shed Ferge Brown Park
Mar 9, 2026 · 3700 EGLINTON AVE W - Building permit25 201370Closed
The proposed work involves the size-for-size relocation and replacement of an existing 150mm diameter water service for Fergy Brown Park. This relocation is required to eliminate conflicts with the proposed caisson installation associated with the Crosstown LRT project. The scope of work is limited to approximately 60 metres of the service line and does not include any upgrades or modifications to the existing facility or the remainder of the water service. The new segment will be installed to closely match the existing alignment while ensuring compliance with municipal design standards and maintaining uninterrupted service during construction.
Oct 1, 2025 · 3700 EGLINTON AVE W - Building permit25 125964Under Review
Workshop and transfer station will be used by contractor STRABAG Eglinton Project for AdvanceTunnel Contract 2 for the Eglinton Crosstown West Extension. Both structures are temporary and willbe constructed within site premisses (Metrolinx Land).
Mar 7, 2025 · 3650 EGLINTON AVE W - Zoning review23 189994 ZAPNotice SentAug 17, 2023 · 3650 EGLINTON AVE W
- Building permit18 239251Closed
Replace the existing shelter with a new Wheel-Trans Mobility Transit Hub Shelter
Nov 1, 2019 · 3650 EGLINTON AVE W - Minor varianceA0114/19EYKApproved
To construct a TTC Access Hub on the northeast corner of Jane Street and Eglinton Avenue West.
Apr 11, 2019 · 3650 EGLINTON AVE W
Lot facts
- Area
- 103,077 m²
- Frontage
- 362.6 mestimated, irregular lot
- Depth
- 402.8 mestimated, irregular lot
- Street
- Eglinton Ave W
- Corner lot
- Yes, also on Sunnybrae Cres402.8 m along it
- Public lane
- None
- House footprint
- 218 m²roof up to 5.4 m
- Back yard
- 169.1 mhouse to rear lot line
- Side yards
- 160.6 m and 181.1 mhouse to side lot lines
- Buildings on the lot
- 1house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Mount Dennis Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Zone OR (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source
- 20 City trees in front of this lot. The City's street tree inventory lists 20 trees at this address: maple, norway (34 cm), maple, norway (29 cm), maple, norway (29 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 100%5 of 5 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 2
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 5 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To construct a TTC Access Hub on the northeast corner of Jane Street and Eglinton Avenue West.
3650 EGLINTON AVE W · Apr 11, 2019 · 64 m away
Latest activity nearby
- Building permit
Proposal for a rear addition.
55 BARTONVILLE AVE W · Sep 11, 2026 · 276 m away - Building permit
Proposed interior alterations to convert an existing room into an additional exam room and storage room.
1286 WESTON RD · Aug 10, 2026 · 271 m away - Development application
Proposed standalone facility designed to accommodate critical equipment required to supplytraction power to the transit line. At street level, the building is conceived as a single-storey structure.
3650 EGLINTON AVE W · Jul 31, 2026 · 22 m away · City file - Development application
The proposed development consists of a 14-storey mixed-use building comprising 149 residential dwelling units (including 20 rental replacement units), 152.50m² of retail space at grade, and 3,221.95 m² of community/non-profit office space on the lower floors, to be occupied and operated by LEF and partner organizations. The total gross floor area is 13,649.01 m². One level of underground parking accommodating 18 vehicle spaces is proposed, with vehicular access from Somerville Avenue.
1250 WESTON RD · Apr 24, 2026 · 291 m away - Building permit
Renovation of the existing basement space and elevator extension and replacement in the existing medical office.
1286 WESTON RD · Apr 1, 2026 · 271 m away - Building permit
REV 01: Approxiately 70m^2 maintenance shed. 1.2m foundations to support modular steel struture, pre-finished metal panel and 2430mm fence enclosed yard.Proposal to construct a new maintenance shed Ferge Brown Park
3700 EGLINTON AVE W · Mar 9, 2026 · 141 m away - Building permit
Proposal for interior alterations to basement to add additional exam rooms.
1284 WESTON RD · Jan 27, 2026 · 271 m away - Building permit
The proposed work involves the size-for-size relocation and replacement of an existing 150mm diameter water service for Fergy Brown Park. This relocation is required to eliminate conflicts with the proposed caisson installation associated with the Crosstown LRT project. The scope of work is limited to approximately 60 metres of the service line and does not include any upgrades or modifications to the existing facility or the remainder of the water service. The new segment will be installed to closely match the existing alignment while ensuring compliance with municipal design standards and maintaining uninterrupted service during construction.
3700 EGLINTON AVE W · Oct 1, 2025 · 141 m away - Zoning review
Closed
1272 WESTON RD · Sep 19, 2025 · 282 m away - Building permit
Workshop and transfer station will be used by contractor STRABAG Eglinton Project for AdvanceTunnel Contract 2 for the Eglinton Crosstown West Extension. Both structures are temporary and willbe constructed within site premisses (Metrolinx Land).
3650 EGLINTON AVE W · Mar 7, 2025 · 64 m away
Neighbourhood: Mount Dennis
About the area around the lot, not the lot itself.
- Nearest station
- Mount Dennis Station12 min walk
- Nearest TTC stop
- Jane St at Eglinton Ave West North Side4 min walk
- Nearest cycling route
- Eglinton Ave West TrlMulti-Use Trail - Boulevard, 3 min walk
- Nearest traffic count
- 705 vehicles in 8 hBala Ave / Bartonville Ave W, 270 m away, Mar 10, 1999
- Serious collisions within 500 m
- 42021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
- Parks
- Fergy Brown Park1 min walk
- Eglinton Flats3 min walk
- Pearen Park3 min walk
Schools within 1 km
- BALA AVENUE COMMUNITY SCHOOL English Public 6 min walk
- ROSELANDS JR PUBLIC SCHOOL English Public 10 min walk
- OUR LADY OF VICTORY CATHOLIC ELEMENTARY SCHOOL English Separate 11 min walk
- YORK HUMBER HIGH SCHOOL English Public 12 min walk
- DENNIS AVENUE COMMUNITY SCHOOL (CLOSED LOCATION) English Public 13 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Mount Dennis | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $70,500 | $84,500 |
| Households that own their home | 48% | 54% |
| Population (2021) | 13,055 | 16,813 |
| Homes built in 1960 or before | 30% | 29% |
| Homes needing major repairs | 10% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Mount Dennis | City median |
|---|---|---|
| Assault | 562.1 | 636.3 |
| Robbery | 83.3 | 69.5 |
| Homicide | 6.9 | 5.3 |
| Shootings | 13.9 | 10.5 |
| Auto theft | 152.7 | 192.6 |
| Theft over $5,000 | 13.9 | 46.1 |
| Break and enter | 124.9 | 172.8 |
| Theft from vehicles | 180.4 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.