HousePrecheckCheck an address

365 Church StToronto · zoning, lot size and permit records

Also 365 Church St, 369 Church St, 373 Church St, 373 Church St, 90 McGill St and 1 more

39.2 × 48.5 m1,636 m²on Granby Stcorner, also on Church St

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.2 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • 6 development applications open within 300 m, up to 43 storeysNew buildings may go up around here in the next years. More change nearby than at 98% of Toronto houses.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
39.2 m frontage48.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Property Standards, Zoning): 26 122729 PRS 00 IR (Property Standards, 2026); 25 267924 ZON 00 IR (Zoning, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A0159/14TEY (To alter the redevelopment plan for a 31-storey condominium mixed-use building with 360..., 2014).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 6 development applications open within 300 m

    Good to know

    6 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 43 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • 1 short-term rental registrations here

    Good to know

    1 active short-term rental registration at this address (Condominium).

    What it means. Short-term rentals are allowed only in the operator's own principal residence, so a buyer cannot count on the same rental income. In a condo, check the building's rules too.

    How to confirm. The City's short-term rental page explains registration and the principal residence rule. Details

    City of Toronto, Short-term Rental Registrations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

25 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 122729 PRS 00 IRClosed

    Property Standards

    Feb 27, 2026 · 365 CHURCH ST
  • By-law investigation25 267924 ZON 00 IRClosed

    Zoning

    Dec 18, 2025 · 365 CHURCH ST
  • Building permit21 247930Closed

    To erect and display one illuminated wall sign.***LAZEEZ SHAWARMA***

    Dec 22, 2021 · 373 CHURCH ST
  • Building permit21 202717Closed

    Proposal for interior alterations to unit 4 on level 1 for a restaurant less than 30 seats - Lazeez Restaurant. Scope includes plumbing for proposed fixtures, new kitchen cooking equipment, new make-up air unit, kitchen hood & exhaust fan for kitchen area.

    Sep 30, 2021 · 373 CHURCH ST
  • Building permit18 119194Closed

    Revision 2. Revised the electrical drawings according to the approved drawings in revison 1. See the description below for revision 1Rev 01 - to add structural supports for suspended mechanical units that were part of the original submission. This was requested by the mechanical plans examiner.Proposal to construct interior alterations for a proposed take out restaurant.

    Sep 24, 2018 · 365 CHURCH ST
  • Building permit18 210352Closed

    To erect and display two overhanging structure signs on the first storey of the westerly elevation, one measuring 4.0 m by 0.46 m at a height of 4.5 m and one measuring 0.3 m by 0.3 m at a height of 2.8 m. **FLEETS FOOD**

    Sep 11, 2018 · 365 CHURCH ST
  • Building permit17 278148Closed

    Revision 1. Enclosing new plumbing that penetrates mezzanine below suite. Mechanical drawing (plumbing) details and elevation of the required 2 hr fire-rated enclosure for tenant piping in mezzanine space below was not included as part of original building permit.

    May 9, 2018 · 373 CHURCH ST
  • Building permit18 147369Closed

    To erect and display one illuminated overhanging structure sign displaying static copy, located on the first storey of the westerly elevation, measruing 3.35 m by 0.48 m at a height of 3.67 m. ******ASSEMBLI****

    May 7, 2018 · 365 CHURCH ST
Show 17 older records
  • Building permit17 197782Closed

    Proposal to install 4 electromagnetic locks on the ground floor.

    Jul 14, 2017 · 365 CHURCH ST
  • Building permit13 243000Closednew building

    Proposal to construct a new 31 sty condo with 387 residential units, commercial at grade, and 4 levels of below grade parking.

    Oct 7, 2016 · 365 CHURCH ST
  • Development application16 121275 STE 27 CDClosed

    Proposal for draft plan of condo related to 31 storey condo with 387 residential units, commercial at grade, and 4 levels of below grade parking.

    Feb 26, 2016 · 365 CHURCH ST
  • Zoning review13 255435 PSPClosed
    Oct 17, 2014 · 365 CHURCH ST
  • Building permit14 159508Approved

    Proposal for an alternate solution for the stand pipe system for the related building permit 13-243000.

    May 21, 2014 · 365 CHURCH ST
  • Minor varianceA0159/14TEYApproved

    To alter the redevelopment plan for a 31-storey condominium mixed-use building with 360 residential dwelling units, approved under Site Specific By-laws 69-2014 by increasing the residential gross floor area and number of dwelling units, and decreasing the height of the fifth floor balconies, indoor and outdoor residential amenity space and residential parking.

    Apr 30, 2014 · 365 CHURCH ST
  • Zoning review13 267611 ZPRClosed
    Nov 20, 2013 · 365 CHURCH ST
  • Development application13 249997 STE 27 SAClosed

    To permit the construction of a new building containing 388 residential condo units comprised of 86 studio, 240 one-bedroom units and 62 two-bedroom units with a total residential GFA of 22,850 m2 and a total non-residential GFA of 250 m2. 57 residential parking spaces including 13 visitor parking spaces and 6 car share spaces will be provided in 3 levels of underground parking. The proposal includes 765 m2 of interior amenity space and 720 m2 of exterior amenity space.

    Oct 11, 2013 · 365 CHURCH ST
  • Building permit13 133908Closed

    DEVELOPMENT SIGN To erect and display a non-illuminted static copy wall sign at the southerly elevation of the building in conjunction with a proposed new development on the adjacent lot. **Menkes** *365 Church**

    Apr 5, 2013 · 373 CHURCH ST
  • Building permit12 281216Cancelled

    RENEWAL DEVELOPMENT SIGNSTo erect and display a single-faced non-illuminated static copy ground sign at the southern frontage of the property in conjunction with the sales and marketing of an existing new development.**365 Church St****Menkes**

    Nov 22, 2012 · 365 CHURCH ST
  • Building permit11 181917Closeddemolition

    This is for the demolition of a three storey mixed use building. The ground floor is a retail use and the second and third floors are a residential use with four residential units.

    Nov 8, 2011 · 373 CHURCH ST
  • Building permit11 261742Closed

    To erect and display one ground sign, containing two sign faces, each with static copy and each 3.66 metres wide by 5.18 metres long and at a height of 6.4 metres, at the south-westerly corner of the premises and fronting Church Street, in conjunction with the sales and marketing of a new residential condominium building to be located on the premises. **Menkes** 365 Church**

    Nov 1, 2011 · 365 CHURCH ST
  • Zoning review11 261698 ZSVClosed
    Aug 23, 2011 · 365 CHURCH ST
  • Zoning review11 105386 PRZClosed
    Jan 12, 2011 · 365 CHURCH ST
  • Development application10 316211 STE 27 OZClosed

    Application appealed to OMB. To permit the construction of a new building containing 360 residential condo units comprised of 70 studio, 234 one-bedroom units, 56 two-bedroom units, and 1 three bedroom unit with a total residential GFA of 21,259.48 m2. 118 residential parking spaces, 13 visitor parking spaces and 6 car share spaces will be provided. The proposal includes 1,440 m2 of amenity space of 720 m2 will be interior amenity space, and 720 m2 will be exterior amenity space.

    Dec 17, 2010 · 365 CHURCH ST
  • Zoning review95 025623 LTOClosed
    Sep 18, 1995 · 365 CHURCH ST
  • Zoning review94 025186 LTOClosed
    Jul 19, 1994 · 365 CHURCH ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
1,636 m²
Frontage
39.2 m
Depth
48.5 m
Street
Granby St
Corner lot
Yes, also on Church St48.5 m along it
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    94%16 of 17 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    2
    Development applications
    17

    Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 17 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To construct a new four-storey apartment building with a west side courtyard area at the centre of the building, a front (north) green roof, and a maintenance equipment storage area on the roof level. There will be a total of 17 bicycle parking spaces on the lot and no vehicular parking spaces will be provided. Also, to construct a rear one-storey detached ancillary building (waste storage enclosure) on the southwest corner on the lot. There will be a total of 15 residential dwelling units (12 studio units and 3 one bedroom units) on the lot.

      185 GERRARD ST E · Oct 14, 2026 · 464 m away
    • Minor varianceApproved

      To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building.

      332 YONGE ST · Oct 14, 2026 · 476 m away
    • Minor varianceApproved

      To permit the existing entertainment place of assembly (nightclub) use within the two-storey commercial building.

      508 CHURCH ST · Sep 9, 2026 · 393 m away
    • Minor varianceApproved

      To alter the existing three-storey townhouse dwelling by constructing interior alterations to the existing open-to-above area between the basement and ground floor level of the dwelling by enclosing the floor (increasing the area of habitable space).

      97 GRANBY ST · Oct 15, 2025 · 31 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 1017-2022), for the 53-storey mixed-use building, by reducing the non-residential space, and the number of short-term bicycle parking spaces required on-site. There will be a total of 591 residential dwelling units on this site. This is currently under the review of Site Plan Control (File No. 21 206338 STE 13 SA).

      241 CHURCH ST · Jul 30, 2025 · 483 m away

    Latest activity nearby

    • Consent (lot split)Pending

      To obtain consent to sever a portion of stratified land (air-rights at-and-above an elevation of 121 m) for the purpose of a lot addition.

      50 GERRARD ST E · Nov 25, 2026 · 132 m away
    • Building permit

      Proposal for standalone plumbing alterations to townhouse.

      52 GRANBY ST · Nov 25, 2026 · 160 m away
    • Building permit

      Installation of new vertical condensate drain risers to collect condensate from existing piping outlets at the balconies

      145 MUTUAL ST · Nov 20, 2026 · 277 m away
    • Building permit

      1 Wall Sign***** T-DOT DENTAL*****

      306 JARVIS ST · Nov 17, 2026 · 176 m away
    • Zoning review

      Closed

      66 GERRARD ST E · Nov 9, 2026 · 115 m away
    • Zoning review

      Not Started

      66 GERRARD ST E · Nov 4, 2026 · 115 m away
    • Building permit

      REVISION-01Proposal for interior alterations to existing vacant suite for new crisis centre - "Gerstein Crisis Centre"

      355 CHURCH ST · Oct 30, 2026 · 70 m away
    • Building permit

      Proposal to install a maglock in existing office space.

      355 CHURCH ST · Oct 28, 2026 · 70 m away
    • Building permitsecondary suite

      Interior alteration, second floor additional unit

      27 MCGILL ST · Oct 27, 2026 · 231 m away
    • Zoning review

      Closed

      27 CARLTON ST · Oct 26, 2026 · 215 m away

    Neighbourhood: Downtown Yonge East

    About the area around the lot, not the lot itself.

    Nearest station
    College Station6 min walk
    Nearest TTC stop
    Carlton St at Church St2 min walk
    Nearest cycling route
    Gerrard St ECycle Track, 2 min walk
    Nearest traffic count
    11,250 vehicles in 14 hChurch St / McGill St, 40 m away, Jan 20, 2026
    Serious collisions within 500 m
    132021–2026, killed or seriously injured: 1 fatal, 7 with pedestrians, 5 with cyclists
    Parks
    Allan Gardens3 min walk
    Joseph Sheard Parkette4 min walk
    College Park6 min walk

    Schools within 1 km

    • TAIE INTERNATIONAL INSTITUTE SCHOOL Private 2 min walk
    • TORONTO METROPOLITAN UNIVERSITY - THEATRE SCHOOL University 3 min walk
    • LE COLLEGE FRANCAIS - CARLTON CAMPUS Private 3 min walk
    • NATIONAL BALLET SCHOOL - MARGARET MCCAIN ACEDEMIC CENTRE Private 4 min walk
    • CHURCH ST JR & NATIVE LEARNING CTR English Public 5 min walk
    • NATIONAL BALLET SCHOOL Private 5 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureDowntown Yonge EastMedian neighbourhood
    Median household income (2020)$69,500$84,500
    Households that own their home36%54%
    Population (2021)17,70016,813
    Homes built in 1960 or before7%29%
    Homes needing major repairs4%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleDowntown Yonge EastCity median
    Assault2360.8636.3
    Robbery143.369.5
    Shootings11.910.5
    Auto theft75.6192.6
    Theft over $5,00099.546.1
    Break and enter274.7172.8
    Theft from vehicles390.1188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.