HousePrecheckCheck an address

36 North Queen StToronto · zoning, lot size and permit records

Employment · E 1.0≈ 359.3 × 836.9 m198,693 m²on North Queen Stcorner, also on Vansco Rd

Not a home

Ttc Maintenance & Storage Facility (B)

The City of Toronto's real estate inventory lists Ttc Maintenance & Storage Facility (B) here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Transit, rail or parkingGood access, with trains, buses or cars and some noise.
  • Permits or applications open on this parcelRecent records on this lot: 26 121188 (Proposal for site trailers with the elevated walkway and canopy roof structure (143.98..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
≈ 359.3 m frontage≈ 836.9 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

4 records on file: more than at 88% of Toronto houses (median 0).

  • Building permit26 121188Inspectionnew building

    Proposal for site trailers with the elevated walkway and canopy roof structure (143.98 sqm) serve as field offices for staff working on the GO Expansion On-Corridor project.

    May 25, 2026 · 36 NORTH QUEEN ST
  • Zoning review24 229014 ZAPClosed
    Oct 21, 2024 · 36 NORTH QUEEN ST
  • Zoning review24 213340 ZAPCancelled
    Sep 16, 2024 · 36 NORTH QUEEN ST
  • Building permit04 192773Closeddemolition

    Demolition of three storey office building at CP Rail Intermodal Yard.

    Dec 16, 2004 · 36 NORTH QUEEN ST

Lot facts

Area
198,693 m²
Frontage
359.3 mestimated, irregular lot
Depth
836.9 mestimated, irregular lot
Street
North Queen St
Corner lot
Yes, also on Vansco Rd836.9 m along it
Public lane
None
House footprint
294 m²roof up to 17.2 m
Back yard
728.8 mhouse to rear lot line
Side yards
11 m and 331.5 mhouse to side lot lines
Buildings on the lot
3house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone E 1.0 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source
  • 7 City trees in front of this lot. The City's street tree inventory lists 7 trees at this address: elm, siberian (38 cm), honey locust (32 cm), honey locust (29 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
—no decisions on file
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit a vehicle dealership.

    15 LOCKPORT AVE · May 28, 2026 · 369 m away
  • Minor varianceApproved

    To conduct interior and exterior alterations to the existing structure in order to increase the existing office, warehouse, and retail area, and to add an accessory restaurant use.

    111 SHORNCLIFFE RD · Apr 13, 2023 · 472 m away
  • Minor varianceApproved

    To maintain the existing parking deficiency.

    16 NEWBRIDGE RD · Aug 26, 2021 · 338 m away
  • Minor varianceApproved

    To convert a portion of the building into office space.

    15 LOCKPORT AVE · Sep 27, 2018 · 369 m away
  • Minor varianceApproved

    To maintain the existing food processing facility.

    17 NEWBRIDGE RD · Nov 13, 2014 · 365 m away

Latest activity nearby

  • Zoning review

    Pending Cancellation

    24 NEWBRIDGE RD · Nov 7, 2024 · 289 m away
  • Building permitdemolition

    Proposed demolition of existing building.

    30 NEWBRIDGE RD · Apr 8, 2024 · 230 m away
  • Zoning review

    Closed

    30 NEWBRIDGE RD · Dec 19, 2023 · 230 m away
  • Building permit

    Upgrades interior and exterior doors and windows

    30 NEWBRIDGE RD · Nov 1, 2021 · 230 m away
  • Building permit

    Proposed intallation of two additional tanks and installation of drains in an existing industrial building.

    25 NEWBRIDGE RD · Dec 21, 2020 · 299 m away
  • Building permit

    Proposed intallation of two additional tanks to be set in-gorund in an existing industrial building.

    25 NEWBRIDGE RD · Aug 12, 2020 · 299 m away
  • Consent (lot split)Approved

    To obtain consent to the technical severance of the property for the purpose of re-establishing two separate lots.

    24 NEWBRIDGE RD · Jul 30, 2020 · 289 m away
  • Zoning review

    Notice Sent

    24 NEWBRIDGE RD · May 27, 2019 · 289 m away
  • Zoning review

    Closed

    24 NEWBRIDGE RD · Aug 3, 2018 · 289 m away
  • Zoning review

    Cancelled

    24 NEWBRIDGE RD · Aug 1, 2018 · 289 m away

Neighbourhood: Etobicoke City Centre

About the area around the lot, not the lot itself.

Nearest station
Kipling Station18 min walk
Nearest TTC stop
Shorncliffe Ave at Newbridge Rd8 min walk
Nearest traffic count
16,978 vehicles in 14 hVansco Rd / North Queen St, 430 m away, Mar 31, 2026
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Cloverdale Park15 min walk

2021 Census

FigureEtobicoke City CentreMedian neighbourhood
Median household income (2020)$83,000$84,500
Households that own their home50%54%
Population (2021)23,60016,813
Homes built in 1960 or before9%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleEtobicoke City CentreCity median
Assault844.4636.3
Robbery187.769.5
Shootings16.210.5
Auto theft601.8192.6
Theft over $5,000200.646.1
Break and enter210.3172.8
Theft from vehicles278.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.