From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Heritage property: in a Heritage Conservation District (Part V)
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage RegisterBuilding permit open since 2022
Needs a closer lookStill open in the City's records: 22 233736 (Emergency repairs to localized roof leak and compromised roof joists,Roof repair uncove..., 2022, status Permit Issued).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Work or applications in progress
Good to knowRecent records on this lot: 25 251167 (ONE GROUND SIGN DEVELOPMENT SIGN WITH QR CODE**SOMETHING NEW IS COMING**, 2025).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications9 development applications open within 300 m
Good to know9 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 49 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
6 records on file: more than at 95% of Toronto houses (median 0).
- Building permit25 251167Permit Issued
ONE GROUND SIGN DEVELOPMENT SIGN WITH QR CODE**SOMETHING NEW IS COMING**
Nov 14, 2025 · 355 SHERBOURNE ST - Zoning review25 218807 POZClosedSep 16, 2025 · 355 SHERBOURNE ST
- Development application25 218807 STE 13 OZClosed
The application proposes to redevelop the subject site with a 48-storey mixed-use building, which includes the retention and adaptive reuse of the heritage building. The proposal includes a total of 440 dwelling units and approximately 37,026.8 square metres of gross floor area, including 1,453 square metres of community space and 35,573.8 square metres of residential space for a density of 15.31 FSI.
Sep 2, 2025 · 355 SHERBOURNE ST · City file - Building permit22 233736Permit Issued
Emergency repairs to localized roof leak and compromised roof joists,Roof repair uncovered failed roof joists immediate emergency repair required to make safe.
Dec 28, 2022 · 353 SHERBOURNE ST - Zoning review21 175955 POZClosedFeb 24, 2022 · 355 SHERBOURNE ST
- Development application21 175955 STE 13 OZClosed
Official Plan and Zoning By-law amendment for a 12-storey (42-metre) mixed-use building that would be integrated into retained portions of the existing place of worship on the lot. 3086 square metres of community space are proposed, and 100 rental residential dwelling units (7942 square metres of residential floor area) are proposed.
Jun 25, 2021 · 355 SHERBOURNE ST · City file
Check before you build
Site-specific exception 900.11.10(671)
Needs a closer look16 site-specific rules and 16 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
On 353-355 Sherbourne Street and 157 Carlton Street, if the requirements of Section 6 and Schedule A of By-law 812-2022 are complied with, a building or structure may be constructed, used or enlarged in compliance with Regulations
- Rule B
to (P) below; (B) Despite Regulations 40.5.40.10(1) and (2), the height of a building or structure is the distance between the Canadian Geodetic Datum of 98.808 metres and elevation of the highest point of the building or structure
- Rule C
Despite Regulation 40.10.40.1(1), non-residential use portions of the building are permitted to be located on the second storey of the building
- Rule D
Despite Regulation 40.10.40.1(2), for any non-residential use: (i) the floor level of the first storey is permitted to be 1.0 metre from the Canadian Geodetic Datum of 98.808 metres; (ii) the floor level of the first storey must have a pedestrian access ramp which rises no more than 0.06 metres vertically for every 1.0 metre horizontally; and (iii) provisions (i) and (ii) above do not apply to the area labelled as 'Existing Church' as shown on Diagram 3 of By-law 812-2022
- Rule E
Despite Regulation 40.10.40.10(2), the permitted maximum height of a building or structure is the number following the 'HT' symbol in metres as shown on Diagram 3 of By-law 812-2022
- Rule F
Despite Regulations 40.5.40.10(4), (6), (8) and Provision (E) above, the following equipment and structures may project beyond the permitted maximum height as shown on Diagram 3 of By-law 812-2022: (i) equipment used for the functional operation of the building including electrical, utility, mechanical and ventilation equipment, enclosed stairwells, roof access, maintenance equipment storage, elevator shafts, chimneys, and vents, by a maximum of 6.0 metres; (ii) structures that enclose, screen or cover the equipment, structures and parts of a building listed in Provision (F)(i) above, inclusive of a mechanical penthouse, by a maximum of 6.0 metres; (iii) window washing equipment, by a maximum of 6.0 metres; (iv) planters, landscaping features, guard rails, and divider screens on a balcony and/or terrace, by a maximum of 1.8 metres; and (v) trellises, pergolas, and unenclosed structures providing safety or wind protection to rooftop amenity space , by a maximum of 3.0 metres
- Rule G
Despite Regulation 40.10.40.40(1), the permitted maximum gross floor area is 11,150 square metres, of which: (i) the permitted maximum gross floor area for residential uses is 8,150 square metres; (ii) the permitted maximum gross floor area for non-residential uses is 3,300 square metres; and (iii) the required minimum gross floor area for a community centre is 2,600 square metres
- Rule H
The maximum permitted number of dwelling units is 108, of which: (i) a minimum of 15 percent must be two-bedroom dwelling units ; (ii) a minimum of 10 percent must be three-or-more-bedroom dwelling units ; and (iii) a minimum of 15 percent of the total number of dwelling units must be: (a) a combination of two-bedroom and three-bedroom dwelling units ; or (b) dwelling units that can be converted to two-bedroom and three-bedroom dwelling units through the use of accessible or adaptable design measures
- Rule I
Despite Regulation 40.10.40.60(1)(C), a platform attached to the front main wall may be located at the second storey
- Rule J
Despite Regulation 40.10.40.70(2) and Clause 600.10.10.1, the required minimum building setbacks are as shown in metres on Diagram 3 of By-law 812-2022
- Rule K
Despite Regulation 40.10.40.70(2)(G) and 40.10.40.70(2)(H), the building may penetrate a 45-degree angular plane equal to 80 percent of the width of the street right-of-way on which the lot fronts
- Rule L
Despite Regulation 40.10.50.10(2), no fence is required along the portion of the lot line abutting a lot in the Residential or Residential Apartment Zone category
- Rule M
Despite Regulation 40.10.50.10(3), no strip of soft landscaping is required along the part of the lot line abutting a lot in the Residential or Residential Apartment Zone category
- Rule N
Despite Regulation 40.10.90.40(1) and Regulation 40.10.100.40(1), vehicle access to a loading space may be provided from Sherbourne Street
- Rule O
Despite Regulations 200.5.10.1(1), no vehicle parking spaces are required to be provided and maintained on the lot
- Rule P
Despite Regulation 220.5.10.1(8), a minimum of one Type 'G' loading space is required to be provided and maintained on the lands. Prevailing By-laws and Prevailing Sections: (None Apply)
- Older by-law A
On 353-355 Sherbourne Street and 157 Carlton Street, if the requirements of Section 6 and Schedule A of By-law 812-2022 are complied with, a building or structure may be constructed, used or enlarged in compliance with Regulations
- Older by-law B
to (P) below; (B) Despite Regulations 40.5.40.10(1) and (2), the height of a building or structure is the distance between the Canadian Geodetic Datum of 98.808 metres and elevation of the highest point of the building or structure
- Older by-law C
Despite Regulation 40.10.40.1(1), non-residential use portions of the building are permitted to be located on the second storey of the building
- Older by-law D
Despite Regulation 40.10.40.1(2), for any non-residential use: (i) the floor level of the first storey is permitted to be 1.0 metre from the Canadian Geodetic Datum of 98.808 metres; (ii) the floor level of the first storey must have a pedestrian access ramp which rises no more than 0.06 metres vertically for every 1.0 metre horizontally; and (iii) provisions (i) and (ii) above do not apply to the area labelled as 'Existing Church' as shown on Diagram 3 of By-law 812-2022
- Older by-law E
Despite Regulation 40.10.40.10(2), the permitted maximum height of a building or structure is the number following the 'HT' symbol in metres as shown on Diagram 3 of By-law 812-2022
- Older by-law F
Despite Regulations 40.5.40.10(4), (6), (8) and Provision (E) above, the following equipment and structures may project beyond the permitted maximum height as shown on Diagram 3 of By-law 812-2022: (i) equipment used for the functional operation of the building including electrical, utility, mechanical and ventilation equipment, enclosed stairwells, roof access, maintenance equipment storage, elevator shafts, chimneys, and vents, by a maximum of 6.0 metres; (ii) structures that enclose, screen or cover the equipment, structures and parts of a building listed in Provision (F)(i) above, inclusive of a mechanical penthouse, by a maximum of 6.0 metres; (iii) window washing equipment, by a maximum of 6.0 metres; (iv) planters, landscaping features, guard rails, and divider screens on a balcony and/or terrace, by a maximum of 1.8 metres; and (v) trellises, pergolas, and unenclosed structures providing safety or wind protection to rooftop amenity space , by a maximum of 3.0 metres
- Older by-law G
Despite Regulation 40.10.40.40(1), the permitted maximum gross floor area is 11,150 square metres, of which: (i) the permitted maximum gross floor area for residential uses is 8,150 square metres; (ii) the permitted maximum gross floor area for non-residential uses is 3,300 square metres; and (iii) the required minimum gross floor area for a community centre is 2,600 square metres
- Older by-law H
The maximum permitted number of dwelling units is 108, of which: (i) a minimum of 15 percent must be two-bedroom dwelling units ; (ii) a minimum of 10 percent must be three-or-more-bedroom dwelling units ; and (iii) a minimum of 15 percent of the total number of dwelling units must be: (a) a combination of two-bedroom and three-bedroom dwelling units ; or (b) dwelling units that can be converted to two-bedroom and three-bedroom dwelling units through the use of accessible or adaptable design measures
- Older by-law I
Despite Regulation 40.10.40.60(1)(C), a platform attached to the front main wall may be located at the second storey
- Older by-law J
Despite Regulation 40.10.40.70(2) and Clause 600.10.10.1, the required minimum building setbacks are as shown in metres on Diagram 3 of By-law 812-2022
- Older by-law K
Despite Regulation 40.10.40.70(2)(G) and 40.10.40.70(2)(H), the building may penetrate a 45-degree angular plane equal to 80 percent of the width of the street right-of-way on which the lot fronts
- Older by-law L
Despite Regulation 40.10.50.10(2), no fence is required along the portion of the lot line abutting a lot in the Residential or Residential Apartment Zone category
- Older by-law M
Despite Regulation 40.10.50.10(3), no strip of soft landscaping is required along the part of the lot line abutting a lot in the Residential or Residential Apartment Zone category
- Older by-law N
Despite Regulation 40.10.90.40(1) and Regulation 40.10.100.40(1), vehicle access to a loading space may be provided from Sherbourne Street
- Older by-law O
Despite Regulations 200.5.10.1(1), no vehicle parking spaces are required to be provided and maintained on the lot
- Older by-law P
Despite Regulation 220.5.10.1(8), a minimum of one Type 'G' loading space is required to be provided and maintained on the lands. Prevailing By-laws and Prevailing Sections: (None Apply)
Lot facts
- Area
- 2,418 m²
- Frontage
- 44.2 m
- Depth
- 55.1 m
- Street
- Sherbourne St
- Corner lot
- Yes, also on Carlton St55.1 m along it
- Public lane
- Central Hospital Lane, 51.4 m along it
- House footprint
- 1,289 m²roof up to 27.4 m
- Back yard
- 0.1 mhouse to rear lot line
- Side yards
- 0.3 m and 6.9 mhouse to side lot lines
- Buildings on the lot
- 4house, garage, sheds
- Max height
- 12 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Site and Area Specific Policy 778. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
- Major Transit Station Area: College. The lot is inside the College Major Transit Station Area approved by the Province (Site and Area Specific Policy 603). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Priority retail street: Carlton Street. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 1.5 (c1.0; r1.0) SS2 (x671) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
Around this lot
- Minor variances approved
- 97%29 of 30 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 2
- Multiplex permits
- 17
- Development applications
- 26
Within 300 m, last 10 years. 19 suite and multiplex permits: more than at 87% of Toronto houses (median 3). 30 variance decisions: more than at 63% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the existing two-and-one-half semi-detached building (houseplex), which is currently under construction (Building Permit 25 258356 BLD), by constructing a side (east) basement walkout with a flat roof canopy. Also, to maintain the existing rear second storey roof deck with stairs, and third storey roof deck. There will be two existing units and two new units for a total of four residential dwelling units on this lot (one unit occupying the basement level, two units occupying the first level, and one unit occupying the second and third levels).
183 CARLTON ST · Jul 22, 2026 · 110 m away - Minor varianceApproved
To alter the existing three-storey mixed-use building by converting the storage room on the second and third levels into seven additional hostel suites (three on the second level, and four on the third level). The existing pharmacy and cafeteria on the ground level, 19 hostel suites on the second level, and 20 hostel suites on the third level will be maintained and unaltered.
311 SHERBOURNE ST · Jun 3, 2026 · 179 m away - Minor varianceApproved
To alter the existing three-storey semi-detached building (currently vacant and with the front and rear portion of the building, abutting Doctor O Lane, attached below grade) by converting it to a mixed-use building (service hub for the Indigenous community) with four dwelling units and community and office space on the basement, first, and second floors, by constructing front and side (west) basement additions, an enlarged ground floor terrace (at the west portion of the building), three new dormers at the rear portion of the second floor, and a rear second floor balcony at the east portion of the building. There will be a total of four residential dwelling units within this building.
209 CARLTON ST · Jul 30, 2025 · 229 m away - Minor varianceApproved
To alter the existing three-storey apartment building (containing 35 rental dwelling units) by converting the basement level (storage rooms and building management office) and a portion of the ground floor (vacant space) into an additional 11 rental dwelling units. There will be a total of 46 rental dwelling units on this lot.
134 CARLTON ST · Jul 9, 2025 · 241 m away - Minor varianceApproved
To alter the existing three-storey commercial building (containing office uses) by converting the west half of the first storey, and the second and third storeys into a hotel use with a common use area located on the ground floor. The existing east half of the building and the existing pharmacy (located on the ground floor) will be maintained. There will be a total of 39 hotel rooms within this mixed-use building.
311 SHERBOURNE ST · May 7, 2025 · 179 m away
Latest activity nearby
- Building permit
REV01: Proposed revision to existing building permit to add 7 suites along north side of existing 3 storey building and new laundry room in basement.Proposal for interior alterations to convert existing offices on ground, second & third floor into hotel / hostel use.
311 SHERBOURNE ST · Nov 9, 2026 · 179 m away - Building permit
FS - Sprinkler Shop Drawing - Proposal for interior alteration and addition to change the vacant residential semi detached house to a supportive housing (residential and ancillary office) building
209 CARLTON ST · Nov 9, 2026 · 229 m away - Building permit
PROPOSAL TO REPLACE DAMAGED SECOND FLOOR DECK PLATFORM FRAMINGEXISTING DECK POSTS AND FOUNDATIONS TO REMAIN UNCHANGED
416 ONTARIO ST · Nov 6, 2026 · 206 m away - Building permit
Electromagnetic locks for a proposed multi-unit residential building. (2 Maglocks)
227 GERRARD ST E · Nov 4, 2026 · 248 m away - Building permit
Proposal for the legalization of the 5th unit at the existing 4th unit building.
216 GERRARD ST E · Nov 2, 2026 · 190 m away - Zoning review
Closed
405 SHERBOURNE ST · Oct 30, 2026 · 189 m away - Zoning review
Closed
140 CARLTON ST · Oct 27, 2026 · 219 m away - Building permit
Proposal to construct pedestrian ramp.
117 PEMBROKE ST · Oct 27, 2026 · 293 m away - Building permit
Proposal for backwater valve installation
490 ONTARIO ST · Oct 23, 2026 · 205 m away - Building permit
Layout changes + addition of a bathroom in units1A, 12, 24 & 25.
134 CARLTON ST · Oct 23, 2026 · 241 m away
Neighbourhood: Moss Park
About the area around the lot, not the lot itself.
- Nearest station
- College Station14 min walk
- Nearest TTC stop
- Sherbourne St at Carlton St1 min walk
- Nearest cycling route
- Sherbourne StCycle Track, 1 min walk
- Nearest traffic count
- 15,547 vehicles in 14 hSherbourne St / Carlton St / Allan Gardens Trl, 50 m away, Jun 19, 2024
- Serious collisions within 500 m
- 72021–2026, killed or seriously injured: 1 fatal, 5 with pedestrians, 1 with cyclists
- Parks
- Allan Gardens1 min walk
- Winchester Square Park2 min walk
- Montague Parkette3 min walk
Schools within 1 km
- OUR LADY OF LOURDES CATHOLIC ELEMENTARY SCHOOL English Separate 6 min walk
- WINCHESTER JR & SR PUBLIC SCHOOL English Public 6 min walk
- NATIONAL BALLET SCHOOL - MARGARET MCCAIN ACEDEMIC CENTRE Private 6 min walk
- NATIONAL BALLET SCHOOL Private 7 min walk
- LE COLLEGE FRANCAIS - CARLTON CAMPUS Private 7 min walk
- NATIONAL BALLET SCHOOL - THE SHOE ROOM Private 8 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Moss Park | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $65,000 | $84,500 |
| Households that own their home | 35% | 54% |
| Population (2021) | 21,490 | 16,813 |
| Homes built in 1960 or before | 17% | 29% |
| Homes needing major repairs | 8% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Moss Park | City median |
|---|---|---|
| Assault | 2226.8 | 636.3 |
| Robbery | 166.6 | 69.5 |
| Homicide | 3.4 | 5.3 |
| Shootings | 3.4 | 10.5 |
| Auto theft | 81.6 | 192.6 |
| Theft over $5,000 | 64.6 | 46.1 |
| Break and enter | 350.2 | 172.8 |
| Theft from vehicles | 275.4 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.