Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Ravine and natural feature protection (13% of lot)
Needs a closer lookPart of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.
What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.
How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details
Toronto Municipal Code, Chapter 658Building permit open since 2011
Needs a closer lookStill open in the City's records: 11 219492 (Proposed alterations to outside drains and installation of new man hole at existing ele..., 2011, status Work Not Started).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Work or applications in progress
Good to knowRecent records on this lot: 26 112051 (Proposed replacement of the existing conventional fire alarm system with a new addressa..., 2026).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
9 records on file: more than at 99% of Toronto houses (median 0).
- Zoning review26 271889 ZSVNot StartedNov 18, 2026 · 355 ANNETTE ST
- Building permit26 112051Permit Issued
Proposed replacement of the existing conventional fire alarm system with a new addressable fire alarm system.
Mar 6, 2026 · 355 ANNETTE ST - Building permit19 202557Closed
Proposal to install a new air conditioning unit (general purpose room/gymnasium) in existing elementary school - St. Cecilia Catholic School
Sep 9, 2019 · 355 ANNETTE ST - Building permit15 177474Closed
Install a 2" bacflow preventer at St. Cecilia Catholic School
Jun 29, 2015 · 355 ANNETTE ST - Building permit14 173202Closed
Interior alteration to elementary school classrooms. Creation of FDK. Includes some structural work.
Aug 1, 2014 · 355 ANNETTE ST - Zoning review14 190880 ZPRClosedJul 15, 2014 · 355 ANNETTE ST
- Building permit11 219492Work Not Started
Proposed alterations to outside drains and installation of new man hole at existing elementary school.
Jul 4, 2011 · 355 ANNETTE ST - Zoning review10 267802 ZPUClosedSep 29, 2010 · 355 ANNETTE ST
Show 1 older records
- Zoning review02 167032 ZPUClosedAug 26, 2002 · 355 ANNETTE ST
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 6,823 m²
- Frontage
- 61 m
- Depth
- 122.9 m
- Street
- Annette St
- Corner lot
- Yes, also on Evelyn Ave122.9 m along it
- Public lane
- None
- House footprint
- 1,493 m²roof up to 16.6 m
- Back yard
- 25.3 mhouse to rear lot line
- Side yards
- 11.5 m and 29.8 mhouse to side lot lines
- Buildings on the lot
- 3house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- 12 City trees in front of this lot. The City's street tree inventory lists 12 trees at this address: maple, norway deborah (28 cm), tree of heaven (26 cm), elm, siberian (19 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 89%24 of 27 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 4
- Multiplex permits
- 10
- Development applications
- 0
Within 300 m, last 10 years. 14 suite and multiplex permits: more than at 81% of Toronto houses (median 3). 27 variance decisions: more than at 59% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To permit the rear third storey addition, and a new front porch roof, that were constructed beyond the limits of the authorized building permit.
65 WESTHOLME AVE · Jul 15, 2026 · 416 m away - Minor varianceApproved
To alter the existing three-storey semi-detached dwelling by constructing a rear one-storey addition with a ground floor deck and stairs, and a rear third storey terrace (above the existing second storey). The existing rear basement walkout will be demolished.
487 CLENDENAN AVE · Jun 10, 2026 · 476 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear second storey deck with stairs. There will be a total of two residential dwelling units on this lot (one unit occupying the ground level, and one unit occupying the second and third storeys).
389 QUEBEC AVE · May 27, 2026 · 413 m away - Minor varianceApproved
To alter the existing two-storey detached dwelling by constructing a rear one-storey addition with a ground floor deck. Also, to construct a new one-storey detached ancillary structure (storage shed) in the rear yard. The lawfully existing parking space in the rear yard will be removed. There will be no parking space(s) on this lot.
50 GLENWOOD AVE · Mar 11, 2026 · 400 m away - Minor varianceApproved
To construct a new rear detached ancillary building (containing one parking space and an attached storage room with separate access) abutting Lane South Saint Johns East Fairview, in the rear yard of the existing two-and-one-half-storey semi-detached dwelling. The existing rear garage will be demolished.
107 ST JOHN'S RD · Nov 19, 2025 · 495 m away
Latest activity nearby
- Zoning review
Not Started
355 ANNETTE ST · Nov 18, 2026 · 32 m away - Building permit
Proposed powder room at ground floor, remove existing secondary stair and repair existing floor structure.
44 GILMOUR AVE · Sep 23, 2026 · 278 m away - Building permit
Drain - proposal to demolish the existing and construct a new detached garage (one car only) in the rear yard.
15 LAWS ST · Sep 22, 2026 · 252 m away - Building permit
Proposal for interior alterations to improve the layout of existing 3 bedrooms on second floor. Demolish load bearing wall.
84 FAIRVIEW AVE · Sep 4, 2026 · 173 m away - Building permit
Installation of backwater valve on sanitary line
462 ANNETTE ST · Jun 11, 2026 · 289 m away - Building permit
Proposal for interior alteration and deck.
184 EVELYN AVE · May 22, 2026 · 69 m away - Zoning review
Cancelled
51 FAIRVIEW AVE · May 13, 2026 · 179 m away - Building permit
Proposed replacement of the existing conventional fire alarm system with a new addressable fire alarm system.
355 ANNETTE ST · Mar 6, 2026 · 32 m away - Building permit
Proposal for interior alterations in basement
157 EVELYN AVE · Feb 10, 2026 · 90 m away - Consent (lot split)Pending
To obtain consent to create a new easement/right-of-way.
15 LAWS ST · Jan 29, 2026 · 252 m away
Neighbourhood: High Park North
About the area around the lot, not the lot itself.
- Nearest station
- High Park Station15 min walk
- Nearest TTC stop
- Annette St at Evelyn Ave East Side1 min walk
- Nearest cycling route
- Annette StBike Lane, 1 min walk
- Nearest traffic count
- 7,466 vehicles in 8 hEvelyn Ave / Annette St, 90 m away, Jan 9, 2012
- Serious collisions within 500 m
- 12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 1 with cyclists
- Parks
- Ravina Gardens1 min walk
- Maher Circle Parkette6 min walk
- Glenlake Square8 min walk
Schools within 1 km
- ST CECILIA CATHOLIC ELEMENTARY SCHOOL English Separate 1 min walk
- ANNETTE ST JR SR & HIGH PARK ALTERNATIVE JR English Public 3 min walk
- HUMBERSIDE COLLEGIATE INSTITUTE English Public 5 min walk
- WESTERN TECHNICAL COMMERCIAL SCHOOL English Public 6 min walk
- THE STUDENT SCHOOL English Public 6 min walk
- URSULA FRANKLIN ACADEMY English Public 7 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | High Park North | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $83,000 | $84,500 |
| Households that own their home | 33% | 54% |
| Population (2021) | 21,855 | 16,813 |
| Homes built in 1960 or before | 38% | 29% |
| Homes needing major repairs | 8% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | High Park North | City median |
|---|---|---|
| Assault | 677.9 | 636.3 |
| Robbery | 43.1 | 69.5 |
| Homicide | 3.9 | 5.3 |
| Shootings | 3.9 | 10.5 |
| Auto theft | 74.5 | 192.6 |
| Theft over $5,000 | 27.4 | 46.1 |
| Break and enter | 133.2 | 172.8 |
| Theft from vehicles | 152.8 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.