HousePrecheckCheck an address

3530 Sheppard Ave EToronto · zoning, lot size and permit records

≈ 182.1 × 218.5 m30,357 m²on Sheppard Ave Ecorner, also on Eaglestone Rd

Not a home

Holy Spirit Catholic Elementary School

The City's school locations place Holy Spirit Catholic Elementary School on this parcel. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A school next doorDrop-off traffic around 8 to 9 am and 3 to 4 pm on school days, children walking; a short walk for a family.
  • Permits or applications open on this parcelRecent records on this lot: 25 182257 (Replacement of the Fire Alarm System at the school with new, 2025); 19 156995 (Proposal to add two certified portables to site of existing elementary school, 2019). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
≈ 182.1 m frontage≈ 218.5 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2012

    Needs a closer look

    Still open in the City's records: 12 179934 (2 proposed portables, 2012, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 25 182257 (Replacement of the Fire Alarm System at the school with new, 2025); 19 156995 (Proposal to add two certified portables to site of existing elementary school, 2019).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A057/06SC (The owner proposes to renovate a portion of Holy Spirit Catholic School for a Best Star..., 2006).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

19 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit25 182257Permit Issued

    Replacement of the Fire Alarm System at the school with new.

    Jul 24, 2025 · 3530 SHEPPARD AVE E
  • Building permit25 152162Cancelled

    Replacement of the Fire Alarm System at the School with New.

    May 1, 2025 · 3530 SHEPPARD AVE E
  • Building permit22 144288Closed

    Proposal for a new exterior wall opening and installation of new exterior door to provide separate entrance for child care program.

    Jun 27, 2022 · 3530 SHEPPARD AVE E
  • Building permit21 244446Cancelled

    replace backflow preventors

    Dec 2, 2021 · 3530 SHEPPARD AVE E
  • Building permit20 102489Closed

    Install of new a/c unit for cooling centre in gym - Holy Spirit Catholic School

    Jan 21, 2020 · 3530 SHEPPARD AVE E
  • Building permit19 156995Under Review

    Proposal to add two certified portables to site of existing elementary school.

    May 21, 2019 · 3530 SHEPPARD AVE E
  • Building permit13 271902Closed

    Rev # 1 - add new resource room and maintain fire protection in existing building and delete spray fireproofing at roof of addition. [Propose one storey addition for three Full Day Kindergarten classrooms and renovations to "Holy Spirit Catholic School" See 13-215210 ZPR]

    Aug 26, 2014 · 3530 SHEPPARD AVE E
  • Zoning review14 206063 ZPRClosed
    Aug 13, 2014 · 3530 SHEPPARD AVE E
Show 11 older records
  • Zoning review13 215210 ZPRClosed
    Aug 2, 2013 · 3530 SHEPPARD AVE E
  • Building permit12 179934Permit Issued

    2 proposed portables

    Aug 22, 2012 · 3530 SHEPPARD AVE E
  • Building permit11 222592Closed - Dormant

    placement of two (2) portable classrooms at Holy Spirit

    Jun 29, 2011 · 3530 SHEPPARD AVE E
  • Building permit10 215127Closeddemolition

    Demolish 2 portables

    Oct 4, 2010 · 3530 SHEPPARD AVE E
  • Zoning review09 152737 ZPUClosed
    Jul 31, 2009 · 3530 SHEPPARD AVE E
  • Building permit08 151672Closed

    repair exterior brick & re-clad elementary school

    Jun 9, 2008 · 3530 SHEPPARD AVE E
  • Building permit06 119023Closed

    relocate 2 portables for Best Start/Child Care

    May 9, 2006 · 3530 SHEPPARD AVE E
  • Minor varianceA057/06SCApproved

    The owner proposes to renovate a portion of Holy Spirit Catholic School for a Best Start Daycare Program. In order to provide this program, a variance is required for on-site parking. A shared parking agreement between the school and the adjacent Holy Spirit Catholic Church is in place and would satisfy the owner's request for 3 parking spaces.

    May 3, 2006 · 3530 SHEPPARD AVE E
  • Zoning review06 101062 ZPRClosed
    Jan 6, 2006 · 3530 SHEPPARD AVE E
  • Building permit05 148327Closed

    TEMPORARY TENTS TO BE INSTALLED FROM JULY 18 - 31/05 , CERT. 00-55020 AND CERT. 00-55011

    Jun 22, 2005 · 3530 SHEPPARD AVE E
  • Building permit01 117001Closeddemolition

    DEMOLITION OF THREE PORTABLE CLASSROOMS

    Mar 13, 2001 · 3530 SHEPPARD AVE E

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
30,357 m²
Frontage
182.1 mestimated, irregular lot
Depth
218.5 mestimated, irregular lot
Street
Sheppard Ave E
Corner lot
Yes, also on Eaglestone Rd218.5 m along it
Public lane
None
House footprint
1,699 m²roof up to 15.3 m
Back yard
33.9 mhouse to rear lot line
Side yards
66.1 m and 85.3 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 16 City trees in front of this lot. The City's street tree inventory lists 16 trees at this address: elm, siberian (75 cm), elm, american (56 cm), elm, siberian (36 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%3 of 3 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 3 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new two-storey detached dwelling with a secondary suite in the basement, front porch, rear basement walkout and rear ground floor deck. Cross-reference Consent and Minor Variance Applications B0025/24SC and A0148/24SC.

    59 ARAGON AVE · May 7, 2025 · 492 m away
  • Minor varianceApproved

    To construct a new two-storey detached dwelling with a secondary suite in the basement, front porch, rear basement walkout and rear ground floor deck. Cross-reference Consent and Minor Variance Applications B0025/24SC and A0148/24SC.

    59 ARAGON AVE · May 7, 2025 · 492 m away
  • Minor varianceApproved

    To alter the development standards for a residential building (as approved under Site Specific Zoning By-law 838-2022), by increasing the lot coverage and total density, reducing the setbacks and separations, reducing the required number of parking spaces and reducing the required soft landscaping, amongst other matters. Cross-Reference Site Plan Application 23 129529 ESC 22 SA.

    3459-3471 SHEPPARD AVE E · Jul 24, 2024 · 332 m away
  • Minor varianceApproved

    To amend the Tam O'Shanter Community Zoning By-law 12360 to increase the maximum permitted dwelling units and a new minimum for required vehicular parking spaces. (Site Plan Control Application: 14 179177 ESC 40 SA) (Previous Minor Variance Approval: A0295/20SC)

    3445 SHEPPARD AVE E · Aug 23, 2023 · 406 m away
  • Minor varianceApproved

    Allowance to increase the total interior floor area of eating and take out establishments to 1,103 m². Previous committee of adjustment applications (A244/02SC) approved variances to permit a place of worship and parking supply, (A195/08SC) approved a variance to permit a dry cleaning plant, (A195/14SC) refused variances for parking supply and an increase for total interior floor area for eating establishments and take-out eating establishments, which was appealed to the OMB (Case Number PL141133) and the variances were authorized to permit 107 parking spaces and a proposed interior floor area of 939 m² for all eating establishment uses.

    3571 SHEPPARD AVE E · Mar 10, 2022 · 304 m away

Latest activity nearby

  • Zoning review

    Not Started

    2360 BIRCHMOUNT RD · Nov 10, 2026 · 296 m away
  • Zoning review

    Not Started

    2360 BIRCHMOUNT RD · Nov 6, 2026 · 296 m away
  • Building permit

    Replace existing garbage enclosure at rear of apartment building.

    25 BAY MILLS BLVD · Oct 21, 2026 · 151 m away
  • Building permit

    REVISION - revised interior layoutProposed restoration of fire damaged dwelling to original condition.

    21 DAVISBROOK BLVD · Sep 9, 2026 · 218 m away
  • Building permitsecondary suite

    REVISION - addition of walkout stair, shed and interior alteration at ground and second floorProposal for multiple projects: addition for three levels = 94.46 m2; interior alterations for three levels = 236.43 m2; new porch and a new walkout; creation of second unit in the basement

    31 DAVISBROOK BLVD · Apr 1, 2026 · 273 m away
  • Zoning review

    Closed

    365 BAY MILLS BLVD · Mar 30, 2026 · 146 m away
  • Building permit

    Proposal to repalce existing fire alarm control panel w/ voice communication system, as they have become defective

    2350 BIRCHMOUNT RD · Feb 20, 2026 · 228 m away
  • Building permit

    Replacement of the Fire Alarm System at the school with new.

    3530 SHEPPARD AVE E · Jul 24, 2025 · 19 m away
  • Building permitsecondary suite

    Proposal to legalize the existing finished basement into a second unit.

    51 MALAMUTE CRES · Jun 12, 2025 · 257 m away
  • Building permit

    Replacement of the Fire Alarm System at the School with New.

    3530 SHEPPARD AVE E · May 1, 2025 · 19 m away

Neighbourhood: Tam O'Shanter-Sullivan

About the area around the lot, not the lot itself.

Nearest station
Agincourt GO Station23 min walk
Nearest TTC stop
3530 Sheppard Ave East3 min walk
Nearest cycling route
West Highland Creek TrlMulti-Use Trail, 8 min walk
Nearest traffic count
14,168 vehicles in 14 hSheppard Ave E: Bay Mills Blvd - Amethyst Rd, 160 m away, Oct 19, 2025
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
Parks
Ron Watson Park7 min walk
Lynngate Park7 min walk
Stephen Leacock Park9 min walk

Schools within 1 km

  • HOLY SPIRIT CATHOLIC ELEMENTARY SCHOOL English Separate 1 min walk
  • PAULINE JOHNSON JR PUBLIC SCHOOL English Public 7 min walk
  • JOHN BUCHAN SR & STEPHEN LEACOCK C.I. English Public 7 min walk
  • LYNNGATE JR PUBLIC SCHOOL English Public 9 min walk
  • TAM O'SHANTER JR PUBLIC SCHOOL English Public 9 min walk
  • INGLEWOOD HEIGHTS JR PUBLIC SCHOOL English Public 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureTam O'Shanter-SullivanMedian neighbourhood
Median household income (2020)$76,500$84,500
Households that own their home56%54%
Population (2021)27,20516,813
Homes built in 1960 or before17%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleTam O'Shanter-SullivanCity median
Assault446.6636.3
Robbery96.869.5
Homicide3.15.3
Shootings12.510.5
Auto theft209.2192.6
Theft over $5,00034.446.1
Break and enter124.9172.8
Theft from vehicles256.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.