HousePrecheckCheck an address

351 Passmore AveToronto · zoning, lot size and permit records

Employment · EH 0.7 (x25)121.9 × 217.2 m26,338 m²on Passmore Ave

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
121.9 m frontage217.2 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    7 records on file: more than at 97% of Toronto houses (median 0).

    • Zoning review22 115951 ZPRClosed
      Feb 21, 2022 · 351 PASSMORE AVE
    • Building permit22 102603Cancelled

      To erect and display one first party, illuminated, electronic moving copy ground sign. The sign is located in Ward #23 Scarborough North, and is subject to Sign District E - Employment.SIGN DIMENSIONS:1.26m L x 1.34m W x 0.25m D x 2.21m H.**Samco**

      Jan 18, 2022 · 351 PASSMORE AVE
    • Building permit16 269057Closed

      Add spray booth and make-up air unit

      Mar 29, 2017 · 351 PASSMORE AVE
    • Building permit13 152469Closed

      Construct new mezzanine, new glazed vestibule enclosure beneath existing front canopy. Also make interior alterations.

      Jul 16, 2013 · 351 PASSMORE AVE
    • Building permit12 256993Cancelled

      construct interior alterations into two units by using existing demising wall, constructing an exit corridor and installing 2 TL doors

      Oct 2, 2012 · 351 PASSMORE AVE
    • Building permit09 169250Closed

      Install one premise isolation backflow preventor

      Oct 14, 2009 · 351 PASSMORE AVE
    • Building permit07 113037Cancelled

      construction of new exterior concrete pad to support new dust extraction equipment - pad only

      Mar 2, 2007 · 351 PASSMORE AVE

    Check before you build

    • Site-specific exception 900.22.10(25)

      Needs a closer look

      3 site-specific rules and 3 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

      Zoning By-law 569-2013, Chapter 900
    Exception 900.22.10(25)Applies

    These parts of the exception apply to this lot's address.

    1. Rule A

      Open storage must be restricted to the rear yard

    2. Rule B

      The maximum height is restricted to the height of the principal building

    3. Rule C

      Despite regulation 60.30.20.10(1) the following uses are not permitted: Asphalt Plant; Hazardous substance manufacturing, processing or warehousing; Abattoir, Slaughterhouse or Rendering of Animals Factory; and Waste Transfer Station . Prevailing By-laws and Prevailing Sections: (None Apply)

    4. Older by-law A

      Open storage must be restricted to the rear yard

    5. Older by-law B

      The maximum height is restricted to the height of the principal building

    6. Older by-law C

      Despite regulation 60.30.20.10(1) the following uses are not permitted: Asphalt Plant; Hazardous substance manufacturing, processing or warehousing; Abattoir, Slaughterhouse or Rendering of Animals Factory; and Waste Transfer Station . Prevailing By-laws and Prevailing Sections: (None Apply)

    By-law 569-2013, Chapter 900

    Lot facts

    Area
    26,338 m²
    Frontage
    121.9 m
    Depth
    217.2 m
    Street
    Passmore Ave
    Corner lot
    No
    Public lane
    None
    House footprint
    14,245 m²roof up to 14.8 m
    Back yard
    33.8 mhouse to rear lot line
    Side yards
    13.2 m and 17.4 mhouse to side lot lines
    Buildings on the lot
    2house, garage, sheds
    Max height
    —
    Max lot coverage
    —

    House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    • Zone EH 0.7 (x25) (Employment Heavy Industrial). Chapter 60, section 60.30 of the by-law. Source

    Around this lot

    Minor variances approved
    —no decisions on file
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    0

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

    Latest activity nearby

    • Building permit

      adding manufacturing equipments in an existing industrial suite, confirming travel distance, exit sign and emergency lights. adding 4 roof top units for heating, ventilation and cooling equipments

      81 MAYBROOK DR · Nov 24, 2026 · 173 m away
    • Zoning review

      Not Started

      385 PASSMORE AVE · Nov 20, 2026 · 248 m away
    • Building permit

      FS - Sprinkler Shop Drawing - Proposal for alterations to office area.

      81 MAYBROOK DR · May 4, 2026 · 173 m away
    • Zoning review

      Notice Sent

      350 PASSMORE AVE · Feb 5, 2026 · 208 m away
    • Zoning review

      Notice Sent

      350 PASSMORE AVE · Feb 5, 2026 · 208 m away
    • Zoning review

      Cancelled

      350 PASSMORE AVE · Dec 8, 2025 · 208 m away
    • Zoning review

      Notice Sent

      350 PASSMORE AVE · Mar 28, 2024 · 208 m away
    • Building permit

      Proposal for the installation of a wastewater treatment system.

      365 PASSMORE AVE · Jul 13, 2023 · 96 m away
    • Building permit

      To erect and display one non illuminated wall sign***GEORGE A, WRIGHT***

      17 STATE CROWN BLVD · Jun 8, 2023 · 253 m away
    • Building permit

      PROPOSED: INSTALL NEW OS&Y DOUBLE CHECK DETECTOR BACKFLOW PREVENTER ASSEMBLY IN EXISTING PUMP ROOM.

      345 PASSMORE AVE · Mar 6, 2023 · 134 m away

    Neighbourhood: Milliken

    About the area around the lot, not the lot itself.

    Nearest TTC stop
    Passmore Ave at State Crown Blvd2 min walk
    Nearest cycling route
    Milliken Park TrlMulti-Use Trail - Existing Connector, 9 min walk
    Nearest traffic count
    3,618 vehicles in 8 hPassmore Ave / Maybrook Dr, 220 m away, Sep 27, 2018
    Serious collisions within 500 m
    02021–2026, killed or seriously injured
    Parks
    Milliken Park9 min walk
    Muirlands Park13 min walk

    Schools within 1 km

    • MACKLIN PUBLIC SCHOOL English Public 15 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureMillikenMedian neighbourhood
    Median household income (2020)$81,000$84,500
    Households that own their home88%54%
    Population (2021)23,98016,813
    Homes built in 1960 or before2%29%
    Homes needing major repairs4%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleMillikenCity median
    Assault334.2636.3
    Robbery197.569.5
    Shootings1910.5
    Auto theft607.7192.6
    Theft over $5,000125.346.1
    Break and enter254.5172.8
    Theft from vehicles398.8188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.