HousePrecheckCheck an address

350 Parliament StToronto · zoning, lot size and permit records

93.7 × 165.8 m13,290 m²on Cole Stcorner, also on Parliament Stbacks onto Callaghan Lane

Not a home

Lord Dufferin Jr & Sr Public School

The City's school locations place Lord Dufferin Jr & Sr Public School on this parcel. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A school next doorDrop-off traffic around 8 to 9 am and 3 to 4 pm on school days, children walking; a short walk for a family.
  • Permits or applications open on this parcelStill open in the City's records: 16 176289 (Proposal for waterproofing and concrete repairs at deteriorated hydro vault located on..., 2016, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 6 development applications open within 300 m, up to 35 storeysNew buildings may go up around here in the next years. More change nearby than at 98% of Toronto houses.
N50 m
93.7 m frontage165.8 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2016

    Needs a closer look

    Still open in the City's records: 16 176289 (Proposal for waterproofing and concrete repairs at deteriorated hydro vault located on..., 2016, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 6 development applications open within 300 m

    Good to know

    6 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 35 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

6 records on file: more than at 95% of Toronto houses (median 0).

  • Building permit16 176289Inspection

    Proposal for waterproofing and concrete repairs at deteriorated hydro vault located on the grounds of existing elementary school (former laneway, lands conveyed from city).

    Jul 14, 2016 · 350 PARLIAMENT ST
  • Zoning review12 221948 ZPUClosed
    Jul 31, 2012 · 350 PARLIAMENT ST
  • Building permit12 212274Closed

    Proposal for interior alterations to ground floor (kindergarten area) of existing elementary school - Lord Dufferin Public School.

    Jul 20, 2012 · 350 PARLIAMENT ST
  • Zoning review12 205897 ZPRClosed
    Jul 5, 2012 · 350 PARLIAMENT ST
  • Zoning review12 156515 ZPRClosed
    Apr 18, 2012 · 350 PARLIAMENT ST
  • Building permit08 118656Closed

    Replace existing sanitary drainage and storm line in existing secondary school.

    Mar 31, 2008 · 350 PARLIAMENT ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
13,290 m²
Frontage
93.7 m
Depth
165.8 m
Street
Cole St
Corner lot
Yes, also on Parliament St165.8 m along it
Public lane
Callaghan Lane, 74.4 m along it
House footprint
3,463 m²roof up to 14.4 m
Back yard
13.5 mhouse to rear lot line
Side yards
3 m and 6.2 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 12 City trees in front of this lot. The City's street tree inventory lists 12 trees at this address: linden, littleleaf (85 cm), honey locust (69 cm), ash, green (40 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
93%41 of 44 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
18
Development applications
15

Within 300 m, last 10 years. 19 suite and multiplex permits: more than at 87% of Toronto houses (median 3). 44 variance decisions: more than at 79% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new four-storey apartment building with a west side courtyard area at the centre of the building, a front (north) green roof, and a maintenance equipment storage area on the roof level. There will be a total of 17 bicycle parking spaces on the lot and no vehicular parking spaces will be provided. Also, to construct a rear one-storey detached ancillary building (waste storage enclosure) on the southwest corner on the lot. There will be a total of 15 residential dwelling units (12 studio units and 3 one bedroom units) on the lot.

    185 GERRARD ST E · Oct 14, 2026 · 462 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half semi-detached building (houseplex), which is currently under construction (Building Permit 25 258356 BLD), by constructing a side (east) basement walkout with a flat roof canopy. Also, to maintain the existing rear second storey roof deck with stairs, and third storey roof deck. There will be two existing units and two new units for a total of four residential dwelling units on this lot (one unit occupying the basement level, two units occupying the first level, and one unit occupying the second and third levels).

    183 CARLTON ST · Jul 22, 2026 · 452 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a side (south) two storey addition. Also, to construct rear ground floor and second storey bay windows, a rear second storey balcony, and a rear third storey rooftop pergola and terrace extension (above the second storey roof).

    380 BERKELEY ST · Jun 3, 2026 · 352 m away
  • Minor varianceApproved

    To alter the existing three-storey mixed-use building by converting the storage room on the second and third levels into seven additional hostel suites (three on the second level, and four on the third level). The existing pharmacy and cafeteria on the ground level, 19 hostel suites on the second level, and 20 hostel suites on the third level will be maintained and unaltered.

    311 SHERBOURNE ST · Jun 3, 2026 · 396 m away
  • Minor varianceApproved

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition with a ground floor stair landing, and a side (south) basement walkout. The existing basement walkout and rear deck with be demolished, and a portion of the rear second storey roof will be reconstructed. Also, to construct one additional parking space (for a total of two parking spaces), abutting the laneway.

    388 BERKELEY ST · Feb 18, 2026 · 374 m away

Latest activity nearby

  • Minor variancePending

    To alter the development standards (as approved under Site Specific Zoning By-law 770-2023), for the 10-storey (39.95 m, including the mechanical penthouse) approved mixed-use building with a two-level underground parking garage, by increasing the building height to 16-storeys (58.4 m, including the mechanical penthouse), resulting in increased residential gross floor area, and modified setbacks. There will be a total of 32 vehicular parking spaces, including three obstructed resident parking spaces. There will be a total of 150 purpose-built rental residential dwelling units on this lot. A related Site Plan Control application (File Number 21 227303 STE 13 SA) is currently under review. This application is necessitated to further increase the building height (14-storeys and 51.65 m), and residential gross floor area approved in Minor Variance Decision A0395/24TEY.

    401 DUNDAS ST E · Nov 25, 2026 · 190 m away
  • Zoning review

    Not Started

    405 PARLIAMENT ST · Nov 23, 2026 · 204 m away
  • Minor variancePending

    In Progress

    306 GERRARD ST E · Nov 10, 2026 · 231 m away
  • Building permit

    Proposal to lower the existing basement via underpinning, interior alterations unfinished basement renovation in single family dwelling

    231 SEATON ST · Nov 10, 2026 · 219 m away
  • Building permit

    Electromagnetic locks for a proposed multi-unit residential building. (2 Maglocks)

    227 GERRARD ST E · Nov 4, 2026 · 282 m away
  • Building permit

    REVISION-01Propose to relocate washer/dryer from ground floor to second-floor mechanical room, convert existing ground-floor enclosure into a washroom, and add a capped plumbing rough-in for a future kitchenette sink.

    29 OAK ST · Oct 28, 2026 · 155 m away
  • Building permit

    Basement underpinning

    321 ONTARIO ST · Oct 22, 2026 · 137 m away
  • Zoning review

    Closed

    306 GERRARD ST E · Oct 7, 2026 · 231 m away
  • Building permit

    Proposed Fire Damage Restoration - BLD & HVA - To restore the unit to pre-loss conditions, complete removal and replacement of the unit interior finishes will be required. Selective removal and replacement of the fire damaged floor joists shall be conducted. Following the reinstallation of the floor joists, the jack posts must be installed to the underside of the roof joists.

    401 PARLIAMENT ST · Sep 28, 2026 · 187 m away
  • Building permit

    1 wall sign**1 OAK DENTAL**

    1 OAK ST · Sep 23, 2026 · 90 m away

Neighbourhood: Moss Park

About the area around the lot, not the lot itself.

Nearest station
TMU Station19 min walk
Nearest TTC stop
Parliament St at Oak St1 min walk
Nearest cycling route
Gerrard St EBike Lane, 3 min walk
Nearest traffic count
7,566 vehicles in 14 hOak St / Parliament St, 60 m away, Aug 20, 2024
Serious collisions within 500 m
132021–2026, killed or seriously injured: 3 fatal, 10 with pedestrians, 1 with cyclists
Parks
Oak Street Parkette2 min walk
Anniversary Park3 min walk
Ontario Street Parkette5 min walk

Schools within 1 km

  • LORD DUFFERIN JR & SR PUBLIC SCHOOL English Public 1 min walk
  • SPRUCECOURT JR PUBLIC SCHOOL English Public 8 min walk
  • NELSON MANDELA PARK PUBLIC SCHOOL English Public 10 min walk
  • ECOLE ELEMENTAIRE GABRIELLE ROY French Public 10 min walk
  • LIBERTY PREP SCHOOL Private 10 min walk
  • ST PAUL CATHOLIC ELEMENTARY SCHOOL English Separate 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMoss ParkMedian neighbourhood
Median household income (2020)$65,000$84,500
Households that own their home35%54%
Population (2021)21,49016,813
Homes built in 1960 or before17%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMoss ParkCity median
Assault2226.8636.3
Robbery166.669.5
Homicide3.45.3
Shootings3.410.5
Auto theft81.6192.6
Theft over $5,00064.646.1
Break and enter350.2172.8
Theft from vehicles275.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.