HousePrecheckCheck an address

35 Ourland AveToronto · zoning, lot size and permit records

83.5 × 155.8 m12,969 m²on Ourland Avecorner, also on Merriday St

Not a home

The Mildenhall Montessori School

The City's school locations place The Mildenhall Montessori School on this parcel. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A school next doorDrop-off traffic around 8 to 9 am and 3 to 4 pm on school days, children walking; a short walk for a family.
N50 m
83.5 m frontage155.8 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    4 records on file: more than at 88% of Toronto houses (median 0).

    • Zoning review26 207603 ZZUClosed
      Jul 23, 2026 · 35 OURLAND AVE
    • Zoning review20 102854 ZPRClosed
      Jan 9, 2020 · 35 OURLAND AVE
    • Zoning review15 204404 ZPRClosed
      Aug 10, 2015 · 35 OURLAND AVE
    • Building permit12 298232Closed

      To erect and display one non-illuminated ground sign on the westerly frontage of the subject property, in conjunction with a montessori school. **Mildenhall Montessori** **TDSB**

      Jan 14, 2013 · 35 OURLAND AVE

    Check before you build

    • Zoning not in By-law 569-2013

      Needs a closer look

      This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

      Zoning By-law 569-2013

    Lot facts

    Area
    12,969 m²
    Frontage
    83.5 m
    Depth
    155.8 m
    Street
    Ourland Ave
    Corner lot
    Yes, also on Merriday St155.8 m along it
    Public lane
    None
    House footprint
    1,949 m²roof up to 13.1 m
    Back yard
    92.8 mhouse to rear lot line
    Side yards
    4 m and 18.4 mhouse to side lot lines
    Buildings on the lot
    1house, garage, sheds
    Max height
    —
    Max lot coverage
    —

    House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    • 18 City trees in front of this lot. The City's street tree inventory lists 18 trees at this address: linden, littleleaf (60 cm), oak, swamp white (20 cm), oak, swamp white (18 cm). Diameter is the trunk at breast height. Source

    Around this lot

    Minor variances approved
    90%19 of 21 decisions
    Garden suite permits
    3
    Laneway suite permits
    0
    Multiplex permits
    2
    Development applications
    1

    Within 300 m, last 10 years. 5 suite and multiplex permits: more than at 59% of Toronto houses (median 3). 21 variance decisions: more than at 52% of Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To construct a new detached dwelling with an attached garage.

      349 MELROSE ST · May 14, 2026 · 380 m away
    • Minor varianceApproved

      To construct a new detached dwelling with an attached garage.

      349 MELROSE ST · May 14, 2026 · 380 m away
    • Minor varianceApproved

      To enclose the existing front yard porch.

      10 HAROLD ST · Mar 26, 2026 · 474 m away
    • Minor varianceApproved

      To construct a new attached garage.

      19 ST GEORGE ST · Feb 26, 2026 · 315 m away
    • Minor varianceRefused

      To construct a fourplex with an attached garage.

      139 HAY AVE · Jan 15, 2026 · 173 m away

    Latest activity nearby

    • Zoning review

      Closed

      414 MELROSE ST · Sep 15, 2026 · 290 m away
    • Zoning review

      Closed

      414 MELROSE ST · Sep 15, 2026 · 290 m away
    • Building permitgarden suite

      Proposal to convert existing garage to garden suite.

      25 WILLOWBROOK RD · Aug 7, 2026 · 202 m away
    • Zoning review

      Closed

      35 OURLAND AVE · Jul 23, 2026 · 58 m away
    • Building permitdemolition

      Proposal to demolish existing building, sever lot and construct a new single family detached dwelling (Part 1)

      150 SIMPSON AVE · Jun 24, 2026 · 97 m away
    • Building permit

      Drain - Proposal to demolish existing building, sever lot and construct a new detached single family dwelling (Part 2).

      150 SIMPSON AVE · Jun 24, 2026 · 97 m away
    • Building permit

      Drain - Proposal to demolish existing building, sever lot and construct a new detached single family dwelling (Part 1).

      150 SIMPSON AVE · Jun 22, 2026 · 97 m away
    • Zoning review

      Notice Sent

      367 MELROSE ST · Apr 28, 2026 · 294 m away
    • Zoning review

      Notice Sent

      367 MELROSE ST · Apr 28, 2026 · 294 m away
    • Building permitgarden suite, multiplex

      Proposal for garden suite at rear of property.Main dwelling will be a fourplex (25 245185 BLD 00 NH).

      166 HAY AVE · Apr 1, 2026 · 179 m away

    Neighbourhood: Mimico-Queensway

    About the area around the lot, not the lot itself.

    Nearest station
    Mimico GO Station11 min walk
    Nearest TTC stop
    Islington Ave at Judson St North Side4 min walk
    Nearest cycling route
    Royal York RdBike Lane, 11 min walk
    Nearest traffic count
    15,805 vehicles in 14 hIslington Ave / Judson St, 300 m away, Apr 13, 2025
    Serious collisions within 500 m
    22021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 2 with cyclists
    Parks
    Ourland Park2 min walk
    Coronation Park - Etobicoke9 min walk
    Alan - Oxford Parkette9 min walk

    Schools within 1 km

    • THE MILDENHALL MONTESSORI SCHOOL Private 1 min walk
    • OAK LEARNERS Private 11 min walk
    • GEORGE R GAULD JR SCHOOL English Public 14 min walk
    • ST LEO CATHOLIC ELEMENTARY SCHOOL English Separate 15 min walk
    • ST LEO CATHOLIC ELEMENTARY SCHOOL (FUTURE ADDRESS FOR MAIN ENTRANCE) English Separate 15 min walk
    • MIMICO ADULT CENTRE English Public 15 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureMimico-QueenswayMedian neighbourhood
    Median household income (2020)$84,000$84,500
    Households that own their home53%54%
    Population (2021)17,04516,813
    Homes built in 1960 or before43%29%
    Homes needing major repairs7%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleMimico-QueenswayCity median
    Assault4209.2636.3
    Robbery41.569.5
    Homicide4.25.3
    Auto theft224.2192.6
    Theft over $5,00066.446.1
    Break and enter132.8172.8
    Theft from vehicles99.6188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.