HousePrecheckCheck an address

35 Mariner TerToronto · zoning, lot size and permit records

38.9 × 44.3 m1,608 m²on Mariner Ter

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.2 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 23 135751 (Reprogramming of networked fire alarm system to interconnected fire alarm systems servi..., 2023, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 m, up to 49 storeysNew buildings may go up around here in the next years. More change nearby than at 85% of Toronto houses.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
38.9 m frontage44.3 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2023

    Needs a closer look

    Still open in the City's records: 23 135751 (Reprogramming of networked fire alarm system to interconnected fire alarm systems servi..., 2023, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Zoning): 25 226926 ZON 00 IR (Zoning, 2025); 25 201138 ZON 00 IR (Zoning, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 49 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

10 records on file: more than at 99% of Toronto houses (median 0).

  • By-law investigation25 226926 ZON 00 IRClosed

    Zoning

    Sep 17, 2025 · 35 MARINER TER
  • By-law investigation25 201138 ZON 00 IRClosed

    Zoning

    Jul 28, 2025 · 35 MARINER TER
  • Building permit23 135751Inspection

    Reprogramming of networked fire alarm system to interconnected fire alarm systems serving each condo board.

    Apr 24, 2023 · 35 MARINER TER
  • Building permit22 224681Cancelled

    Reprogramming of networked fire alarm system to interconnected fire alarm systems

    Nov 1, 2022 · 35 MARINER TER
  • Building permit13 102730Closed

    Proposal to install 1 backflow prevention device in an existing residential condo.

    Feb 1, 2013 · 35 MARINER TER
  • Building permit11 205119Closed - Dormant

    This is for the installation of a 3" backflow prevention device, located in the basement mechanical room.

    Jul 15, 2011 · 35 MARINER TER
  • Building permit05 209584Closed

    Make interior alterations to condominium; Suite 5503 (SPH #03).

    Mar 15, 2006 · 35 MARINER TER
  • Building permit05 206757Closed

    to relocate duct work in condo unit 5503. capacity not to change

    Dec 15, 2005 · 35 MARINER TER
Show 2 older records
  • Building permit04 195138Closed

    Install one maglock on P1 parking level

    Nov 25, 2004 · 35 MARINER TER
  • Zoning review04 176064 PLOClosed
    Sep 22, 2004 · 35 MARINER TER

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
1,608 m²
Frontage
38.9 m
Depth
44.3 m
Street
Mariner Ter
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—
  • 6 City trees in front of this lot. The City's street tree inventory lists 6 trees at this address: elm (20 cm), elm, american (20 cm), elm, accolade (20 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%2 of 2 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
5

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 2 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 493-2024) for the 21-storey mixed-use building (located at the northwest corner of the lot, municipally known as 396 Queens Quay West) by increasing the height of the mechanical penthouse, reducing the width of 32 parking spaces, and reducing the indoor amenity space (which will be used for storage space for outdoor furniture).

    350 QUEENS QUAY W · Jun 17, 2026 · 262 m away
  • Minor varianceApproved

    To convert the existing commercial space (located on the first floor lobby, and second levels of the building, municipally known as 350 Queens Quay West) into a hotel use, and to expand the permitted hotel use areas (on the second level of the building, municipally known as 390 Queens Quay West). Also, to alter the existing building municipally known as 396 Queens Quay West, by constructing a seventh level shaft on the roof area.

    350 QUEENS QUAY W · Apr 9, 2025 · 262 m away
  • Minor varianceApproved

    To permit a new eating establishment with an entertainment area (bowling alley) on Level P2 of Building D ("The Well").

    480 FRONT ST W · Sep 21, 2022 · 470 m away
  • Minor varianceApproved

    To construct a new four-storey building for a "Flying Theatre", (known as Flyover Canada, a theatre simulator attraction) and ancillary retail uses.

    292 BREMNER BLVD · Jul 28, 2021 · 492 m away
  • Minor varianceApproved

    To construct an enclosure and service platform around the existing generator.

    320 FRONT ST W · Jul 28, 2021 · 485 m away

Latest activity nearby

  • Zoning review

    Not Started

    10 LOWER SPADINA AVE · Nov 25, 2026 · 209 m away
  • Building permit

    Proposal for interior alterations to party room to install a glass screen.

    26 FORT YORK BLVD · Nov 20, 2026 · 238 m away
  • Building permit

    2 ground signs**1-9 CONCORD CITYPLACE WAY**

    23 SPADINA AVE · Nov 10, 2026 · 167 m away
  • Building permit

    Proposal to construct a new storage room within the P1 level garage area

    5 MARINER TER · Nov 10, 2026 · 137 m away
  • Building permit

    2 ground signs**1-9 CONCORD CITYPLACE WAY**

    23 SPADINA AVE · Oct 26, 2026 · 167 m away
  • Building permit

    Replacement of existing FCU risers' expansion compensators, anchors, and guides. Total of 13 riser sets (supply and return) from the ground floor up to the 41st floor (37th level)

    5 MARINER TER · Oct 22, 2026 · 137 m away
  • Building permit

    Fire Alarm replacement and upgrades at TTC Harbourfront Substation.

    21 LOWER SPADINA AVE · Oct 20, 2026 · 147 m away
  • Building permit

    Application for a permit to erect and display first party three wall signs, illuminated, displaying static copy and erected at above the second storey. (The proposal has received an approved variance:26 129129 ZMP 00 ZR)Dimensions:Wall sign A2-1: 1.22m L x7.5m W X 0.13m D at a height of 9.11m, on the East elevation.Wall sign A2-2: 1.22m L x7.5m W X 0.13m D at a height of 9.11m, on the East elevation.Wall sign A2-3: 1.22m L x7.5m W X 0.13m D at a height of 9.11m, on the West elevation.**CONCORD**

    23 SPADINA AVE · Oct 7, 2026 · 167 m away
  • Building permit

    1 GROUND SIGN**CONCORD**

    23 SPADINA AVE · Oct 5, 2026 · 167 m away
  • Building permit

    REV01: Revisions to the washroom layout and mechanical drawings, including updated HRV location.Conversion of an existing empty shell into a daycare facility

    350 QUEENS QUAY W · Oct 5, 2026 · 262 m away

Neighbourhood: Harbourfront-CityPlace

About the area around the lot, not the lot itself.

Nearest station
St. Andrew Station16 min walk
Nearest TTC stop
Queens Quay Loop at Lower Spadina Ave2 min walk
Nearest cycling route
Canoe Landing Park TrlMulti-Use Trail, 1 min walk
Nearest traffic count
8,389 vehicles in 8 hCanoe Landing Park Trl / Gardiner Expy Lakeshore W Ramp / Lake Shore Blvd W / Southern Linear Park Trl / Spadina Ave / Spadina S Gardiner Expy Ramp, 80 m away, Mar 24, 2021
Serious collisions within 500 m
92021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 3 with cyclists
Parks
Southern Linear Park1 min walk
Canoe Landing3 min walk
Peter Street Basin Park3 min walk

Schools within 1 km

  • JEAN LUMB PUBLIC SCHOOL English Public 3 min walk
  • BISHOP MACDONELL CATHOLIC ELEMENTARY English Separate 3 min walk
  • CITY SCHOOL English Public 9 min walk
  • THE WATERFRONT SCHOOL English Public 10 min walk
  • ALPHA ALTERNATIVE & OASIS ALTERNATIVE English Public 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureHarbourfront-CityPlaceMedian neighbourhood
Median household income (2020)$90,000$84,500
Households that own their home40%54%
Population (2021)28,13516,813
Homes built in 1960 or before0%29%
Homes needing major repairs2%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleHarbourfront-CityPlaceCity median
Assault883.3636.3
Robbery48.169.5
Homicide2.85.3
Shootings8.510.5
Auto theft56.6192.6
Theft over $5,00056.646.1
Break and enter141.6172.8
Theft from vehicles121.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.