HousePrecheckCheck an address

35 Greenbrae CrctToronto · zoning, lot size and permit records

62.5 × 84.0 m4,529 m²on Greenbrae Crctcorner, also on Sedgemount Dr

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 6 storeys, 70 rental units, built 1962More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • 4 development applications open within 300 m, up to 29 storeysNew buildings may go up around here in the next years. More change nearby than at 88% of Toronto houses.
  • City upkeep score: 95 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N50 m
62.5 m frontage84.0 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 8 by-law investigations closed in the last two years

    Good to know

    Closed files (Order Issued Property Standards, Property Standards, Zoning): 26 257750 PRS 00 IR (Property Standards, 2026); 26 205931 PRS 00 IR (Property Standards, 2026); 26 225934 PRS 00 IV (Order Issued Property Standards: Ceiling not maintained free of holes, cracks, damaged..., 2026); and 5 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 4 development applications open within 300 m

    Good to know

    4 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 29 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 95 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (6 storeys, 70 units, built 1962).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

15 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 257750 PRS 00 IRClosed

    Property Standards

    Oct 20, 2026 · 35 GREENBRAE CRCT
  • By-law investigation26 205931 PRS 00 IRClosed

    Property Standards

    Jul 21, 2026 · 35 GREENBRAE CRCT
  • By-law investigation26 225934 PRS 00 IVClosed

    Order Issued Property Standards: Ceiling not maintained free of holes, cracks, damaged and deteriorated materials.Namely, the bathroom ceiling is not maintained free of cracks, damaged and dete; The supplied facility in or on the property is not constructed, installed and/or maintained so that it will function safely and effectively.Namely, the bathtub ; Wall(s) not maintained free of holes, cracks, damaged and deteriorated materials.Namely, the bathroom walls are not maintained free of cracks, damaged and deter

    Jul 17, 2026 · 35 GREENBRAE CRCT
  • By-law investigation26 203671 PRS 00 IRClosed

    Property Standards

    Jul 17, 2026 · 35 GREENBRAE CRCT
  • By-law investigation25 268329 PRS 00 IRClosed

    Property Standards

    Dec 19, 2025 · 35 GREENBRAE CRCT
  • By-law investigation25 181719 PRS 00 IRClosed

    Property Standards

    Jun 23, 2025 · 35 GREENBRAE CRCT
  • By-law investigation25 181709 PRS 00 IRClosed

    Property Standards

    Jun 23, 2025 · 35 GREENBRAE CRCT
  • By-law investigation24 247553 ZON 00 IRClosed

    Zoning

    Dec 6, 2024 · 35 GREENBRAE CRCT
Show 7 older records
  • Zoning review24 199924 LPRClosed
    Aug 17, 2024 · 35 GREENBRAE CRCT
  • Building permit19 234114Closed

    Proposal for repairs to the existing parking garage

    Oct 28, 2019 · 35 GREENBRAE CRCT
  • Building permit17 265667Closed

    REVISION 2 - install a standard double sliding door for unit patio access doorsIncreasing the window opening to include a second exit door from unit G4 . New slab on grade with metal and glass guard with gate to side yard

    May 18, 2018 · 35 GREENBRAE CRCT
  • Building permit14 267577Closed

    Install 3" back flow preventer in existing apartment building

    Jan 13, 2015 · 35 GREENBRAE CRCT
  • Building permit14 187438Closed

    repair 60 balconies

    Jul 16, 2014 · 35 GREENBRAE CRCT
  • Building permit13 117465Closed

    underpinning 3 m of footing to remove impacted soil inner corner south side of building

    Feb 26, 2013 · 35 GREENBRAE CRCT
  • Building permit03 129057Closed

    Install fire alarm retrofit

    Jun 24, 2003 · 35 GREENBRAE CRCT

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
4,529 m²
Frontage
62.5 m
Depth
84 m
Street
Greenbrae Crct
Corner lot
Yes, also on Sedgemount Dr84 m along it
Public lane
None
House footprint
1,223 m²roof up to 25.7 m
Back yard
20.9 mhouse to rear lot line
Side yards
8.1 m and 10.5 mhouse to side lot lines
Buildings on the lot
3house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 5 City trees in front of this lot. The City's street tree inventory lists 5 trees at this address: ginkgo (12 cm), pear chanticleer (11 cm), ginkgo (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%4 of 4 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
6

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 4 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To demolish portions of the existing place of worship and construct a 11-storey residential building. Cross-Reference Zoning By-law Amendment Application No. 22 111976 ESC 24 OZ

    3379-3385 LAWRENCE AVE E · Mar 6, 2024 · 218 m away
  • Minor varianceApproved

    Proposal for interior alterations to existing commercial building.

    3430 LAWRENCE AVE E · Mar 9, 2023 · 221 m away
  • Minor varianceApproved

    To constuct a new rear yard deck.

    8 SIX NATIONS AVE · Sep 15, 2022 · 162 m away
  • Minor varianceApproved

    To permit the construction of a new two storey dwelling with integral garage and finished basement . The existing dwelling is to be demolished. This development requires variances to the Zoning By-law.

    353 BELLAMY RD N · Jan 13, 2022 · 409 m away
  • Minor varianceApproved

    To permit the construction of a new 2-storey detached dwelling with walkout basement in the back.

    38 EASTPARK BLVD · Sep 22, 2021 · 314 m away

Latest activity nearby

  • Building permitsecondary suite

    Restoration of a fire-damaged house, Prop. Basement Apartment, Enlargement of one Window

    20 LONGHOUSE PL · Nov 16, 2026 · 272 m away
  • Building permit

    Interior alteration to combine existing retail units into a supermarket, including construction of a new 199m² mezzanine and associated structural modifications.

    3434 LAWRENCE AVE E · Oct 22, 2026 · 290 m away
  • Building permit

    Proposed like-for-like fire pump replacement due to end of service life.

    3379 LAWRENCE AVE E · Oct 21, 2026 · 218 m away
  • Building permit

    Proposal for an alternative solution to address the amount of exposed mass timber within the ground floor.

    3379-3385 LAWRENCE AVE E · Sep 4, 2026 · 213 m away
  • Building permit

    Proposed interior alterations to lobby and management office.

    3379 LAWRENCE AVE E · Sep 2, 2026 · 218 m away
  • Building permit

    Tim Hortons #102844 - Interior Alterations

    3495 LAWRENCE AVE E · Sep 1, 2026 · 253 m away
  • Building permit

    Interior alterations to install a new interior vestibule at Corridor 103 to enhance vault security, including associated M&E work. Replace main interior entry doors and hardware to provide employee-only access while maintaining free egress. Refresh interior finishes and install new furniture throughout the bank branch.

    3495 LAWRENCE AVE E · Aug 26, 2026 · 253 m away
  • Building permit

    Replacement of existing sprinkler system and installation of new double check detector assemblybackflow preventer.

    65 GREENBRAE CRCT · Aug 14, 2026 · 191 m away
  • Zoning review

    Closed

    3401 A-3561 A LAWRENCE AVE E · Jul 30, 2026 · 226 m away
  • Zoning review

    Closed

    3434 LAWRENCE AVE E · Jul 16, 2026 · 290 m away

Neighbourhood: Woburn North

About the area around the lot, not the lot itself.

Nearest station
Eglinton GO Station33 min walk
Nearest TTC stop
Lawrence Ave East at Opposite Cedarbrae Mall1 min walk
Nearest cycling route
Cedarbrook Park TrlMulti-Use Trail - Entrance, 6 min walk
Nearest traffic count
28,379 vehicles in 14 hLawrence Ave E / Greenbrae Crct / Greencedar Crct, 150 m away, Oct 22, 2024
Serious collisions within 500 m
52021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 0 with cyclists
Parks
Greenbrae Parkette2 min walk
Lusted Park4 min walk
Cedarbrook Park6 min walk

Schools within 1 km

  • AL-QASIM ACADEMY Private 6 min walk
  • CEDARBRAE COLLEGIATE INSTITUTE English Public 9 min walk
  • TREDWAY WOODSWORTH PUBLIC SCHOOL English Public 12 min walk
  • ST ROSE OF LIMA CATHOLIC ELEMENTARY SCHOOL English Separate 12 min walk
  • AL-MADRASAH AL-INAMIYYAH PRIVATE SCHOOL Private 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureWoburn NorthMedian neighbourhood
Median household income (2020)$74,500$84,500
Households that own their home54%54%
Population (2021)26,58016,813
Homes built in 1960 or before23%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleWoburn NorthCity median
Assault768.9636.3
Robbery76.569.5
Shootings13.910.5
Auto theft316.6192.6
Theft over $5,00062.646.1
Break and enter180.9172.8
Theft from vehicles281.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.