HousePrecheckCheck an address

348 Nairn AveToronto · zoning, lot size and permit records

Open space · OR52.6 × 91.5 m4,631 m²on Nairn Ave

Not a home

Charles Caccia Park

The City of Toronto's real estate inventory lists Charles Caccia Park here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelStill open in the City's records: 13 129532 (Construct new accessory control room building, a CSO (Combined Sewer Overflow ) for und..., 2013, status Revocation Pending). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N20 m
52.6 m frontage91.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2013

    Needs a closer look

    Still open in the City's records: 13 129532 (Construct new accessory control room building, a CSO (Combined Sewer Overflow ) for und..., 2013, status Revocation Pending).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

1 records on file: more than at 53% of Toronto houses (median 0).

  • Building permit13 129532Revocation Pendingnew building

    Construct new accessory control room building, a CSO (Combined Sewer Overflow ) for underground storm water management facility in Charles Caccia Park.

    May 6, 2013 · 348 NAIRN AVE

Lot facts

Area
4,631 m²
Frontage
52.6 m
Depth
91.5 m
Street
Nairn Ave
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—
  • Zone OR (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source
  • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: honey locust (50 cm), honey locust (46 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
89%39 of 44 decisions
Garden suite permits
7
Laneway suite permits
1
Multiplex permits
12
Development applications
0

Within 300 m, last 10 years. 20 suite and multiplex permits: more than at 88% of Toronto houses (median 3). 44 variance decisions: more than at 79% of Toronto houses (median 19).

Latest activity nearby

  • Minor variancePending

    To construct a new three-storey detached residential building (houseplex) with a front covered porch with stairs, a rear exterior access staircase (fire escape leading to each level), and a rear basement walkout. Also, to construct a new two-storey ancillary building (containing one garden suite) in the rear yard, abutting Rochdale Avenue. There will be a total of seven residential dwelling units on this lot (six dwelling units within the houseplex, and one dwelling unit within the ancillary building).

    48 ENNERDALE RD · Nov 25, 2026 · 158 m away
  • Building permitmultiplex

    To alter the existing two-storey detached dwelling (containing one dwelling unit) by converting it into a four dwelling units. By constructing side (east) two-storey additions, a third storey addition, a front basement walkout, a front ground floor covered porch with stairs, a rear ground floor patio with stairs, a second storey side (west) inset outdoor patio, and a rear third storey rooftop patio.

    143 HATHERLEY RD · Oct 21, 2026 · 208 m away
  • Building permitgarden suite

    REV01: Proposed revision as per drawingsProposal for second storey addition to existing garage to create garden suite.

    90 ENNERDALE RD · Oct 7, 2026 · 181 m away
  • Zoning review

    Notice Sent

    48 ENNERDALE RD · Aug 21, 2026 · 158 m away
  • Zoning review

    Notice Sent

    48 ENNERDALE RD · Aug 20, 2026 · 158 m away
  • Building permit

    Proposed rear addition (sunroom) and rear wood deck.

    78 HOLMESDALE RD · Aug 11, 2026 · 248 m away
  • Building permitgarden suite

    PROPOSED GARDEN SUITE - CONVERTING EXISTING GARAGE (= 46.65 SQ.M.), PROPOSED 1ST FLOOR ADDITION (= 13.87 SQ.M.) AND PROPOSED SECOND FLOOR ADDITION (= 55.98 SQ.M.)

    143 HATHERLEY RD · Aug 10, 2026 · 208 m away
  • Building permit

    Proposal to construct a canopy above the existing concrete porch

    420 NAIRN AVE · Jul 15, 2026 · 216 m away
  • Building permit

    Demolishing existing unsafe detached garage in rear facing alleyway, and replacing with a new detached garage in same location facing same direction using existing footprint.

    103 HATHERLEY RD · Jul 9, 2026 · 211 m away
  • Zoning review

    Notice Sent

    110 HATHERLEY RD · Jun 30, 2026 · 157 m away

Neighbourhood: Caledonia-Fairbank

About the area around the lot, not the lot itself.

Nearest station
Fairbank Station15 min walk
Nearest TTC stop
Caledonia Rd at Summit Ave8 min walk
Nearest cycling route
Rogers RdBike Lane, 8 min walk
Nearest traffic count
905 vehicles in 8 hHatherley Rd / Harvie Ave (East), 170 m away, May 3, 2023
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Charles Caccia Park1 min walk
Marble Hill Parkette4 min walk
Bert Robinson Park8 min walk

Schools within 1 km

  • BALANCED EDUCATION NETWORK B.E.N. SCHOOL Private 2 min walk
  • ST JOHN BOSCO CATHOLIC ELEMENTARY SCHOOL English Separate 5 min walk
  • FAIRBANK MEMORIAL COMMUNITY SCHOOL English Public 6 min walk
  • F H MILLER JR PUBLIC SCHOOL English Public 10 min walk
  • LYCEE FRANCAIS DE TORONTO Private 12 min walk
  • FAIRBANK PUBLIC SCHOOL English Public 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureCaledonia-FairbankMedian neighbourhood
Median household income (2020)$87,000$84,500
Households that own their home63%54%
Population (2021)10,01516,813
Homes built in 1960 or before53%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleCaledonia-FairbankCity median
Assault552.3636.3
Robbery74.969.5
Shootings9.410.5
Auto theft280.8192.6
Theft over $5,00018.746.1
Break and enter121.7172.8
Theft from vehicles159.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.