HousePrecheckCheck an address

346 Yonge StToronto · zoning, lot size and permit records

Also 1 Elm St, 3 Elm St, 5 Elm St

Commercial residential · CR 4.0 (c4.0; r1.5) SS1 (x2553)7.2 × 37.1 m261 m²on Yonge Stcorner, also on Elm St

Not a home

A commercial or mixed-use building

4 different civic addresses share this parcel, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 20 203072 (REV 02: As-built extrerior encroachmentsREV01: Proposed revision - see Appendix A Inter..., 2026); 23 103385 (Revision due to change in height from grade of overhanging signs 2 and 4. ***SCOTIA BAN..., 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 19 development applications open within 300 m, up to 85 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: CollegeThe City plans more homes around the station: good for transit, and more building over time.
N10 m
7.2 m frontage37.1 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Order Issued Property Standards, Property Standards): 25 121093 PRS 00 IV (Order Issued Property Standards: The roof or one of it's components is not free from da..., 2025); 25 120944 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 20 203072 (REV 02: As-built extrerior encroachmentsREV01: Proposed revision - see Appendix A Inter..., 2026); 23 103385 (Revision due to change in height from grade of overhanging signs 2 and 4. ***SCOTIA BAN..., 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 19 development applications open within 300 m

    Good to know

    19 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 85 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

33 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit20 203072Revision Issued

    REV 02: As-built extrerior encroachmentsREV01: Proposed revision - see Appendix A Interior and Exterior Renovation of Exisitng Building

    Aug 17, 2026 · 346 YONGE ST
  • Building permit23 103385Issuance Pending

    Revision due to change in height from grade of overhanging signs 2 and 4. ***SCOTIA BANK***

    Sep 4, 2025 · 346 YONGE ST
  • Building permit24 204356Closed

    Proposal for structural reinforcing of the foundation walls. See also 24 186300 UNS and 2021-229252 UNS

    Apr 17, 2025 · 346 YONGE ST
  • By-law investigation25 121093 PRS 00 IVClosed

    Order Issued Property Standards: The roof or one of it's components is not free from dangerous accumulations of ice and/or snow.

    Feb 24, 2025 · 346 YONGE ST
  • By-law investigation25 120944 PRS 00 IRClosed

    Property Standards

    Feb 24, 2025 · 346 YONGE ST
  • Zoning review24 195339 LPRClosed
    Aug 9, 2024 · 3 ELM ST
  • Zoning review23 106968 LTOClosed
    Jan 25, 2023 · 5 ELM ST
  • Zoning review22 230697 ZSVClosed
    Nov 17, 2022 · 346 YONGE ST
Show 25 older records
  • Building permit22 148173Closed

    structural reinforcing of the existing columns and beams on site

    Jul 19, 2022 · 346 YONGE ST
  • Zoning review21 215811 ZPRClosed
    Sep 21, 2021 · 346 YONGE ST
  • Building permit21 127119Closed

    To erect and display three illuminated wall signs.***BINI TATTOO AND PIERCING PA LOUR***

    Mar 31, 2021 · 346 YONGE ST
  • Zoning review19 199560 ZPRClosed
    Aug 1, 2019 · 346 YONGE ST
  • Zoning review18 221648 LTOClosed
    Sep 7, 2018 · 3 ELM ST
  • Building permit17 203200Closed

    Proposal to install a 1 inch backflow prevention device.

    Aug 18, 2017 · 346 YONGE ST
  • Building permit16 118353Closed

    In conjunction with a two storey building on the premises, proposal to erect and display five static illuminated wall signs on the north and east first storey building elevations. Three of the proposed signs are 0.71 metres vertically by 3.49 metres horizontally and two of the proposed signs are 0.71 metres vertically by 2.45 metres horizontally, all at a height of 3.91 metres above grade.**PIZZA PIZZA**

    Mar 15, 2016 · 346 YONGE ST
  • Zoning review15 256780 ZSVClosed
    Nov 25, 2015 · 346 YONGE ST
  • Building permit15 183379Closed

    Proposed tea shop Restaurant with occupants of 8 patrons and 2 staffs.

    Jul 15, 2015 · 346 YONGE ST
  • Zoning review15 157510 ZZCClosed
    May 15, 2015 · 3 ELM ST
  • Zoning review14 230110 LPRClosed
    Sep 30, 2014 · 346 YONGE ST
  • Zoning review08 155827 ZPRClosed
    May 7, 2008 · 346 YONGE ST
  • Building permit07 109616Closed

    Interior alterations to existing Pizza Pizza on ground floor and underpinning portion of basement. Number of Seats = 24 Number of Staff: 5

    May 18, 2007 · 346 YONGE ST
  • Zoning review04 149360 LTOClosed
    Jun 22, 2004 · 346 YONGE ST
  • Zoning review00 012049 LTOClosed
    Jan 12, 2000 · 1 ELM ST
  • Zoning review98 025966 LTOClosed
    Apr 9, 1998 · 346 YONGE ST
  • Building permit97 017367Closed

    H.V.A.C. ALTER PLANS 389064 BY INSTALL ROOF TOP AIR-CONDITIONING AND HEATING IN PLACE OF SPLIT AIR-CONDITIONING FOR 2ND FLOOR SEE 375735 RETAIL STORE - ELPRO PHOTO CTR TENANT: RUBY LEE CONFIRMED ADDRESS: 346 YONGE ST

    Jun 9, 1997 · 5 ELM ST
  • Building permit96 019635Closed

    INSTALL AIR CONDITIONING UNIT AND RELATED DUCTWORK TO SERVICE 2ND FLOOR RETAIL STORE. -- COOLING ONLY. SEE 375735 'ELPRO PHOTO CTR" /LM

    Sep 9, 1996 · 5 ELM ST
  • Building permit95 018707Closed

    MAKE INTERIOR ALTERATIONS ON 2ND FLOOR.

    Jul 24, 1995 · 5 ELM ST
  • Zoning review90 028365 LTOClosed
    Apr 23, 1990 · 346 YONGE ST
  • Zoning review88 030881 LTOClosed
    Dec 12, 1988 · 346 YONGE ST
  • Zoning review88 030200 LTOClosed
    Mar 8, 1988 · 346 YONGE ST
  • Zoning review86 028563 LTOClosed
    Dec 8, 1986 · 346 YONGE ST
  • Zoning review81 030668 LTOClosed
    Sep 15, 1981 · 5 ELM ST
  • Zoning review81 030332 LTOClosed
    May 29, 1981 · 5 ELM ST

Check before you build

  • Site-specific exception 900.11.10(2553)

    Needs a closer look

    10 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2553)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 12(1) 334 of former City of Toronto By-law 438-86

  2. Older by-law B

    Section 12(1) 335 of former City of Toronto By-law 438-86

  3. Older by-law C

    Section 12(1) 397 of former City of Toronto By-law 438-86

  4. Older by-law D

    Section 12(1) 431 of former City of Toronto By-law 438-86

  5. Older by-law E

    Section 12(2) 132 of former City of Toronto By-law 438-86

  6. Older by-law F

    Section 12(2) 256 of former City of Toronto By-law 438-86

  7. Older by-law G

    Section 12(2) 258 of former City of Toronto By-law 438-86

  8. Older by-law H

    Section 12(2) 260 of former City of Toronto By-law 438-86

  9. Older by-law I

    Section 12(2) 316 of former City of Toronto By-law 438-86

  10. Older by-law J

    Former City of Toronto by-law 97-0194.

By-law 569-2013, Chapter 900

Lot facts

Area
261 m²
Frontage
7.2 m
Depth
37.1 m
Street
Yonge St
Corner lot
Yes, also on Elm St37.1 m along it
Public lane
None
House footprint
239 m²roof up to 43.2 m
Back yard
3.1 mhouse to rear lot line
Side yards
0 m and 0 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
1house, garage, sheds
Max height
20 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Site and Area Specific Policy 174. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Major Transit Station Area: College. The lot is inside the College Major Transit Station Area approved by the Province (Site and Area Specific Policy 603). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Priority retail street: Elm Street, Yonge Street. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 4.0 (c4.0; r1.5) SS1 (x2553) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: ash, green (23 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
92%12 of 13 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
29

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 13 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building.

    332 YONGE ST · Oct 14, 2026 · 42 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 588-2025) for a new 15-storey mixed-use building (East Block fronting Bay Street), by increasing the podium portions of the building heights, equipment height projections, and reducing the minimum height of the first storey. Also, the new 43-storey mixed-use building (West Block fronting Elizabeth Street) will be reducing the size of one parking space length. This is currently being reviewed under Site Plan Control (File Number 20 25 197844 STE 11 SA). There will be a total of 827 purpose-built rental units on this lot (617 residential dwelling units, and 210 affordable dwelling units).

    130 ELIZABETH ST · Jan 14, 2026 · 378 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1017-2022), for the 53-storey mixed-use building, by reducing the non-residential space, and the number of short-term bicycle parking spaces required on-site. There will be a total of 591 residential dwelling units on this site. This is currently under the review of Site Plan Control (File No. 21 206338 STE 13 SA).

    241 CHURCH ST · Jul 30, 2025 · 409 m away
  • Minor varianceApproved

    To alter the existing 15-storey apartment building by constructing a garbage storage enclosure (to be located on the upper-level of the underground parking garage), which will be the cause for a reduction in two vehicular parking spaces.

    145 MUTUAL ST · Feb 26, 2025 · 471 m away
  • Minor varianceApproved

    To permit a place of amusement (arcade) use on this subject lot.

    247 YONGE ST · Jan 8, 2025 · 339 m away

Latest activity nearby

  • Building permit

    Proposal for replacement of existing windows of office floors from Level 2-24.

    700 BAY ST · Nov 24, 2026 · 264 m away
  • Zoning review

    Closed

    335 YONGE ST · Nov 23, 2026 · 83 m away
  • Building permit

    Proposal for interior demolition of existing office floors from Level 2 - 24.

    700 BAY ST · Nov 23, 2026 · 264 m away
  • Building permit

    Four wall signs.***INTERNATIONAL BUSINESS UNIVERSITY***

    655 BAY ST · Nov 19, 2026 · 186 m away
  • Building permit

    Proposed an interior alteration

    595 BAY ST · Nov 19, 2026 · 203 m away
  • Building permit

    Proposed interior alterations to replace existing revolving door with security gate.See approved AS permit 26-229850-AS

    686 BAY ST · Nov 17, 2026 · 231 m away
  • Building permit

    Proposed interior alterations to an existing office suite, including demolition and construction of interior partitions, millwork, and associated mechanical, electrical, plumbing, sprinkler, and fire alarm modifications. Suite 401

    595 BAY ST · Nov 9, 2026 · 203 m away
  • Zoning review

    Not Started

    21 DUNDAS SQ · Nov 6, 2026 · 272 m away
  • Building permit

    Proposal to install and update the existing sprinkler system in the washrooms on the 23rd floor.

    1 DUNDAS ST W · Nov 5, 2026 · 203 m away
  • Building permit

    Proposal for interior alterations, fit out for new eating establishment with karaoke rooms on the 2nd floor.

    332 YONGE ST · Nov 5, 2026 · 42 m away

Neighbourhood: Yonge-Bay Corridor

About the area around the lot, not the lot itself.

Nearest station
TMU Station3 min walk
Nearest TTC stop
Yonge St at Gould St1 min walk
Nearest cycling route
Gerrard St WCycle Track, 2 min walk
Nearest traffic count
9,550 vehicles in 14 hYonge St / Elm St, 30 m away, Apr 8, 2025
Serious collisions within 500 m
132021–2026, killed or seriously injured: 3 fatal, 10 with pedestrians, 3 with cyclists
Parks
Toronto Metropolitan University Square2 min walk
College Park3 min walk
Joseph Sheard Parkette4 min walk

Schools within 1 km

  • TMU - HEASLIP HOUSE University 3 min walk
  • TORONTO METROPOLITAN UNIVERSITY - ENTR TO BUSINESS SCHOOL LOBBY University 4 min walk
  • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF IMAGE ARTS University 4 min walk
  • TMU - HEIDELBERG CENTRE SCHOOL OF GRAPHIC COMM'NS MGMT University 4 min walk
  • TORONTO METROPOLITAN UNIVERSITY - THEATRE SCHOOL University 5 min walk
  • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 5 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureYonge-Bay CorridorMedian neighbourhood
Median household income (2020)$68,500$84,500
Households that own their home32%54%
Population (2021)12,64516,813
Homes built in 1960 or before2%29%
Homes needing major repairs2%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleYonge-Bay CorridorCity median
Assault3361.1636.3
Robbery300.169.5
Homicide125.3
Shootings1210.5
Auto theft162.1192.6
Theft over $5,000210.146.1
Break and enter552.2172.8
Theft from vehicles402.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.