HousePrecheckCheck an address

345 Merton StToronto · zoning, lot size and permit records

Residential · R (d2.0) (x918)52.3 × 78.6 m4,053 m²on Mount Pleasant Rdcorner, also on Merton St

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 10 storeys, 109 rental units, built 1965More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelStill open in the City's records: 09 147554 (permit for one back flow valve to existing apartment building, 2009, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 m, up to 40 storeysNew buildings may go up around here in the next years. More change nearby than at 96% of Toronto houses.
  • City upkeep score: 90 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
52.3 m frontage78.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2009

    Needs a closer look

    Still open in the City's records: 09 147554 (permit for one back flow valve to existing apartment building, 2009, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 10 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Order Issued Property Standards, Property Standards): 26 239329 PRS 00 IV (Order Issued Property Standards: In a dwelling unit, a window located more than 2,000 m..., 2026); 26 239279 PRS 00 IR (Property Standards, 2026); 26 182525 PRS 00 IR (Property Standards, 2026); and 7 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 40 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 90 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (10 storeys, 109 units, built 1965).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

18 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 239329 PRS 00 IVClosed

    Order Issued Property Standards: In a dwelling unit, a window located more than 2,000 millimetres above grade opens within 1,500 millimetres of the floor not leading to a balcony does not emplo

    Sep 17, 2026 · 345 MERTON ST
  • By-law investigation26 239279 PRS 00 IRClosed

    Property Standards

    Sep 17, 2026 · 345 MERTON ST
  • By-law investigation26 182525 PRS 00 IRClosed

    Property Standards

    Jun 11, 2026 · 345 MERTON ST
  • By-law investigation26 170732 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 345 MERTON ST
  • By-law investigation26 170731 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 345 MERTON ST
  • Building permit25 258954Closed

    Repairs to beam below top of garage ramp

    Feb 19, 2026 · 345 MERTON ST
  • By-law investigation25 221644 PRS 00 IRClosed

    Property Standards

    Sep 7, 2025 · 345 MERTON ST
  • By-law investigation25 215524 PRS 00 IRClosed

    Property Standards

    Aug 25, 2025 · 345 MERTON ST
Show 10 older records
  • By-law investigation25 191341 PRS 00 IVClosed

    Order Issued Property Standards: Exterior garbage bin(s) has no cover. Namely, the Waste Containment Bins in the enclosure located at the Front of the Property.

    Jun 3, 2025 · 345 MERTON ST
  • By-law investigation25 170955 PRS 00 IRClosed

    Property Standards

    Jun 3, 2025 · 345 MERTON ST
  • Building permit25 158569Closed

    Railing replacement and concrete repairs at three garage stairwells

    Jun 2, 2025 · 345 MERTON ST
  • By-law investigation25 114753 PRS 00 IRClosed

    Property Standards

    Feb 10, 2025 · 345 MERTON ST
  • Building permit23 188552Closed

    REVISION 1: knee wall will be replaced with a reinforced concrete wall that extends to 1,080mm minimum above finished grade.Proposal for remedial work to east parking garage wall.

    Nov 18, 2024 · 345 MERTON ST
  • Building permit22 130392Closed

    Proposed balcony repairs and railing replacement.

    May 6, 2022 · 345 MERTON ST
  • Building permit11 262221Closed

    Proposal to install rooftop equipment on existing roof containing communication antena's.

    Sep 8, 2011 · 345 MERTON ST
  • Building permit09 147554Permit Issued

    permit for one back flow valve to existing apartment building

    Jul 23, 2009 · 345 MERTON ST
  • Building permit06 126051Closed

    Make parking garage repair by reconstruct P-1 slab.

    May 19, 2006 · 345 MERTON ST
  • Building permit00 168232Closed

    MAKE ALTERATIONS TO BASEMENT FLOOR TO ACCOMMODATE BELL EQUIPMENT Unit B-1

    Aug 1, 2000 · 345 MERTON ST

Check before you build

  • Site-specific exception 900.2.10(918)

    Needs a closer look

    1 site-specific rule and 3 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(918)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    Any addition or extension above the first storey of a lawfully existing detached house must comply with the minimum building setbacks required by this By-law. [TO: 438-86; 12 (2) 193]

  2. Older by-law A

    Section 12(2) 118 of former City of Toronto By-law 438-86

  3. Older by-law B

    Section 12(2) 119 of former City of Toronto By-law 438-86

  4. Older by-law C

    On 345 Merton St., former City of Toronto by-law 22269.

By-law 569-2013, Chapter 900

Lot facts

Area
4,053 m²
Frontage
52.3 m
Depth
78.6 m
Street
Mount Pleasant Rd
Corner lot
Yes, also on Merton St78.6 m along it
Public lane
None
House footprint
842 m²roof up to 36.5 m
Back yard
9.5 mhouse to rear lot line
Side yards
17.7 m and 18.7 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
10 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Yonge-Eglinton Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone R (d2.0) (x918) (Residential). Chapter 10, section 10.10 of the by-law. Source
  • 3 City trees in front of this lot. The City's street tree inventory lists 3 trees at this address: maple, norway (68 cm), linden, littleleaf (57 cm), maple, norway (42 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
86%12 of 14 decisions
Garden suite permits
1
Laneway suite permits
2
Multiplex permits
2
Development applications
11

Within 300 m, last 10 years. 5 suite and multiplex permits: more than at 59% of Toronto houses (median 3). 14 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new detached dwelling with a rear deck. NOTE: This application was previously deferred at the Committee of Adjustment hearing on August 20, 2026.

    369 MILLWOOD RD · Oct 15, 2026 · 430 m away
  • Minor varianceApproved with conditions

    To construct a front entry addition, with a porch, and a new detached garage in the rear yard.

    488 MERTON ST · Apr 16, 2026 · 404 m away
  • Minor varianceApproved

    To alter the existing two-storey detached dwelling by constructing two-storey front and rear additions.

    387 MILLWOOD RD · Jan 8, 2026 · 448 m away
  • Minor varianceApproved

    To construct a rear two-storey addition and convert the existing garage to a storage space. Note: This application was previously deferred at the Committee of Adjustment hearing on June 12, 2025.

    390 MILLWOOD RD · Sep 11, 2025 · 491 m away
  • Minor varianceApproved

    To construct a 3-storey fourplex and 2-storey laneway suite.

    281 DAVISVILLE AVE · Aug 28, 2025 · 266 m away

Latest activity nearby

  • Consent (lot split)Pending

    To obtain consent to sever the property into two stratified lots and to create new easements/rights-of-way. Also, to maintain existing easements/rights-of-way.

    265 BALLIOL ST · Dec 2, 2026 · 190 m away
  • Building permitmultiplex

    INTERIOR ALTERATIONAS ON GROUND AND SECOND FLOOR TO CONVERT AN EXTISTING DUPLEX TO TRIPLEX. PROPOSED REAR DECK ON THE SECOND FLOOR.

    443 MERTON ST · Nov 18, 2026 · 216 m away
  • Building permit

    Installation of two mag-locks and associated equipment on exit doors serving the basement.

    268 MERTON ST · Nov 10, 2026 · 184 m away
  • Zoning review

    Notice Sent

    275 MERTON ST · Oct 27, 2026 · 165 m away
  • Building permit

    An alternative solution is proposed to address exiting from a portion of the ground floor in the building to be located at 289-299 Balliol Street, Toronto, ON. This noted portion served by a single exit is classified as a Group F-3 space with an area of approximately 160.1 sqm.

    289 BALLIOL ST · Oct 16, 2026 · 179 m away
  • Building permit

    Targeted waterproofing renewal at the parking garage roof slab, including localized concrete repairs.

    221 BALLIOL ST · Sep 11, 2026 · 299 m away
  • Building permit

    Proposed concrete repairs at balcony slabs, shear walls, columns, end walls, roof parapet, exposed building floor slab edges, and entrance canopy; Replacement of balcony guards; Targeted masonry repairs and installation of an elastomeric coating/paint for the exterior walls; General replacement of exterior joint sealants (excluding window and balcony door perimeter joints).

    265 BALLIOL ST · Aug 31, 2026 · 190 m away
  • Building permit

    Proposal for balcony repairs

    221 BALLIOL ST · Aug 4, 2026 · 299 m away
  • Building permit

    Revision 01 - to Building Permit 26-113362 BLD 00 BA to update required fire-rated separation per inspector request.Proposal for interior washroom alterations to a cemetery office building.

    375 MOUNT PLEASANT RD · May 26, 2026 · 273 m away
  • Building permit

    REV 01: Proposed to alter approved shoring design to include tiebacks into municipal right of wayPart Permit - Proposal to construct 32-Storey rental residential apartment building with level of underground parking

    289 BALLIOL ST · Apr 17, 2026 · 179 m away

Neighbourhood: Mount Pleasant East

About the area around the lot, not the lot itself.

Nearest station
Davisville Station15 min walk
Nearest TTC stop
Mt Pleasant Rd at Merton St1 min walk
Nearest cycling route
Beltline TrlPark Road, 1 min walk
Nearest traffic count
24,133 vehicles in 14 hMount Pleasant Rd / Merton St, 60 m away, Oct 26, 2024
Serious collisions within 500 m
42021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 0 with cyclists
Parks
Kay Gardner Beltline Park1 min walk
The Mission Ground Parkette2 min walk
Mount Pleasant Parkette3 min walk

Schools within 1 km

  • GREENWOOD COLLEGE SCHOOL Private 4 min walk
  • SUNNYBROOK SCHOOL Private 4 min walk
  • TORONTO PREP SCHOOL Private 5 min walk
  • HODGSON MIDDLE SCHOOL English Public 6 min walk
  • MANOR MONTESSORI - DE SAVERY SITE Private 11 min walk
  • DAVISVILLE & SPECTRUM SCHOOL English Public 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMount Pleasant EastMedian neighbourhood
Median household income (2020)$110,000$84,500
Households that own their home55%54%
Population (2021)16,37016,813
Homes built in 1960 or before52%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMount Pleasant EastCity median
Assault336.5636.3
Robbery10.269.5
Auto theft224.4192.6
Theft over $5,00045.946.1
Break and enter204172.8
Theft from vehicles107.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.