HousePrecheckCheck an address

341 Yonge StToronto · zoning, lot size and permit records

Also 345 Yonge St, 351 Yonge St

39.5 × 49.4 m1,926 m²on Elm Stcorner, also on Yonge Stbacks onto O'Keefe Lane

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 15 204881 (FS - Sprinkler Shop Drawing - Proposal for interior alterations to the ground floor uni..., 2015). Larger work can mean noise and trucks next door; read what each one is for.
  • 20 development applications open within 300 m, up to 85 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
N20 m
39.5 m frontage49.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 15 204881 (FS - Sprinkler Shop Drawing - Proposal for interior alterations to the ground floor uni..., 2015).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 20 development applications open within 300 m

    Good to know

    20 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 85 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

39 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit25 235083Closed

    Proposal for two temporary structures for Toronto Waterfront Marathon

    Oct 8, 2025 · 341-355 YONGE ST
  • Development application22 242103 STE 13 OZClosed

    This is an application that is to address two main objectives: 1) to bring the portion of the university's lands currently zoned under the former City of Toronto Zoning By-law 438-86 into the City-wide Zoning By-law 569-2013; and 2) to establish bicycle parking, loading space, and automobile parking rates for lands owned and operated by Toronto Metropolitan University as an overlay approach in By-law 569-2013. No development is proposed as part of this application.

    Dec 23, 2022 · 341-355 YONGE ST · City file
  • Zoning review21 229943 LTOClosed
    Oct 25, 2021 · 351 YONGE ST
  • Building permit21 213466Closed

    Proposal to add ice machine, two sinks, and GI to restaurant and tie in to existing sanitary drain

    Oct 6, 2021 · 351 YONGE ST
  • Zoning review18 157028 ZPRClosed
    May 11, 2018 · 341-355 YONGE ST
  • Building permit16 270087Closed

    REV - 01: Revision to replace revolving doors.Proposal to replace the front doors with revolving glass doors and add stainless steel guards to restrict access to the green roof

    May 29, 2017 · 341-355 YONGE ST
  • Zoning review17 163191 ZMPClosed
    May 19, 2017 · 341-355 YONGE ST
  • Building permit16 256425Closed

    In conjunction with a multi-storey building on the premises, proposal to erect and display two illuminated overhanging structure signs containing static copy on the west elevation of the building. The proposed signs are facing the northerly and southerly directions, each measuring 0.28 metres vertically by 1.57 metres horizontally at a height of 3.64 metres above grade.** School of performance Ryerson University**

    Dec 23, 2016 · 341-355 YONGE ST
Show 31 older records
  • Building permit16 253138Closed

    Proposal to install new heating coils and one new radiant heating unit

    Nov 28, 2016 · 341 YONGE ST
  • Building permit15 197239Closed

    Revision to permit # 5 (15-197239 BLD-05 BA) This revision is for the smoke venting to aid fire fighting for the ground and basement levels only. Please refer to original permit and earlier revision #3 of HVAC (15-197239-HVA-03 MS) Original large single fan to be replaced with 2 smaller fans in parallel due to size of roof opening.Revision - Installation of a mechanical smoke evacuation system

    Aug 25, 2016 · 341-355 YONGE ST
  • Building permit16 142890Closed

    Proposal for interior alterations to the 2nd floor library (#275) - to install glazed partition walls in existing university - "Ryerson University"

    May 13, 2016 · 341-355 YONGE ST
  • Building permit15 204881Application On Hold

    FS - Sprinkler Shop Drawing - Proposal for interior alterations to the ground floor unit SLC003 for new restaurant greater than 30 seats - "Basil Box"Total occupant load in restaurant = 81 patrons and 5 staff

    Sep 2, 2015 · 341-355 YONGE ST
  • Building permit15 187762Closed

    Proposal for interior alterations on the ground floor, to newly created retail unit, refer to permit # 15-155301

    Aug 10, 2015 · 341 YONGE ST
  • Building permit15 155301Closed

    Proposal to construct a demising wall on the ground floor for proposed retail unit.

    Jul 8, 2015 · 341 YONGE ST
  • Building permit15 155308Cancelled

    Proposal for interior alterations to unit 312 - 3rd floor - to construct new permenant fixed sloped seating in existing university - "Ryerson University"

    May 12, 2015 · 341 YONGE ST
  • Zoning review14 265856 PRZClosed
    Jan 15, 2015 · 341 YONGE ST
  • Building permit11 309981Closednew building

    Revision # 04 - for 2 hour fire resistance rating for the existing air combustion intake shaft's and fire smoke damper's at the north and south shaft's in the existing university building. Revision - to remove cafe on Level 1 - Tenant permit to be applied for at a later date.

    Jan 13, 2015 · 341 YONGE ST
  • Building permit14 266926Closed

    Proposal for interior alterations to ground floor for new cafe in the Student Centre for Ryerson University - Starbucks

    Jan 6, 2015 · 341 YONGE ST
  • Development application14 265856 STE 27 OZClosed

    The purpose of the application is to permit the reconfiguration of the ground floor and basement levels of the Ryerson Student Learning Centre. The proposal includes replacing below-grade retail uses with institutional uses, reducing the number of required retail units from 2 to 1 while maintaining retail uses on the ground floor, reducing the minimum retail store frontage along Yonge Street from 34 metres to 27 metres, and allowing for an increase in total non-residential gross floor area by approximately 410 square metres. Previously approved under Rezoning application No. 11 146654 STE 27 OZ

    Dec 18, 2014 · 355 YONGE ST
  • Development application14 265860 STE 27 SAClosed

    The purpose of the application is to permit the reconfiguration of the ground floor and basement levels of the Ryerson Student Learning Centre. The proposal includes replacing below-grade retail uses with institutional uses, reducing the number of required retail units from 2 to 1 while maintaining retail uses at grade, and allowing for an increase in total non-residential gross floor area of approximately 410 square metres on the subject site. Revised floor area for institutional use for Student Centre for Ryerson University previously approved under 11- 416675 STE 27 SA for origianl Site Plan Approval Application. See

    Dec 18, 2014 · 347 YONGE ST
  • Building permit14 254134Closed

    To erect and display one illuminated wall sign. 0.533 metres in length by 11.58 metres in width, on the south facing first building wall, in conjunction with a university located on the premises. **Ryerson University**

    Nov 25, 2014 · 341 YONGE ST
  • Building permit14 220720Closed

    Proposal to install 2 maglocks on level 2, Ryerson Library/Student Learning Centre

    Oct 20, 2014 · 341 YONGE ST
  • Building permit13 172018Closed

    Proposal for 3 new canopy's without enclosures overhanging the Yonge street side (retail spaces) of new Student Centre for Ryerson University.

    Jun 6, 2013 · 341 YONGE ST
  • Building permit11 325098Closed

    Proposal to construct an above grade connection over City-owned O'Keefe laneway from the the Ryerson Student Centre (See active BLD 11 309981) and existing Ryerson Library (See active BLD 11 314367).

    Apr 3, 2013 · 341 YONGE ST
  • Zoning review12 120980 PSPClosed
    Feb 10, 2012 · 341 YONGE ST
  • Building permit12 114727Cancelled

    Stand alone shoring permit for tunnel connection from new student centre building at 341 Yonge St, UNDER O'KEEF LANE, and connecting to Current Ryerson Building at 350 / 380 Victoria.

    Jan 31, 2012 · 341 YONGE ST
  • Building permit11 263684Closed

    To erect and display a ground sign, containing two sign faces, at the south-westerly corner of the premises and in conjunction with a proposed Student Learning Centre. **Ryerson University**

    Sep 15, 2011 · 341 YONGE ST
  • Zoning review11 150557 POZClosed
    Aug 17, 2011 · 341 YONGE ST
  • Development application11 146675 STE 27 SAClosed

    Standard Site Plan Approval application for new 8 storey (plus mechanical) Student Centre for Ryerson University - with retail at and below grade - No Parking. Library and Study space. - Please See 11 146654 STE 27 OZ for Rezoning Application.

    Mar 16, 2011 · 347 YONGE ST
  • Development application11 146654 STE 27 OZClosed

    This is a Gold Star Rezoning application for a new 9 storey (plus mechanical) Student Centre for Ryerson University, with retail at and below grade and no parking. The proposed building includes a library and study space. The applicant is also seeking an above grade encroachment of the City-owned O'Keefe laneway and a reversal of direction for the same City-owned laneway.

    Mar 16, 2011 · 347 YONGE ST
  • Building permit08 212634Closeddemolition

    Proposal to demo existing 3 sty retatil store. See LEAD FILE 08 212618 (341 Yonge St.). Also see demo permits for 347, 349, & 353 Yonge St.

    Jun 1, 2010 · 351 YONGE ST
  • Building permit08 212618Closeddemolition

    LEAD FILE - Proposal to demo existing 1 sty retatil store. Also see demo permits for 341, 347, 349, 351, & 353 Yonge St. Note: 353 Yonge St. has been merged with 351 Yonge St.

    Dec 10, 2008 · 341 YONGE ST
  • Building permit03 104587Closed

    make interior alteration to portion of ground floor to add new restaurant containing 30 seats.

    Mar 19, 2003 · 341 YONGE ST
  • Building permit01 182952Closed

    Interior alterations to existing retail store, including partitions.

    Oct 4, 2001 · 351 YONGE ST
  • Zoning review01 035465 ZSVClosed
    Jan 25, 2001 · 341 YONGE ST
  • Zoning review01 101599 000Closed
    Jan 9, 2001 · 341 YONGE ST
  • Building permit95 019490Closed

    BUILD 2ND FLOOR ADDITION LP

    Oct 3, 1995 · 341 YONGE ST
  • Building permit94 013118Closed

    MAKE ALTERATIONS BY CREATING OPENING AT 3RD FLOOR LEVEL IN EXISTING RETAIL STORE TENENT:SAM THE RECORDMAN SS

    May 12, 1994 · 341 YONGE ST
  • Building permit93 023249Closed

    MAKE ALTERATIONS AND BUILD MEZZANINE ADDITION AT FIRST FLOOR LEVEL. /LM

    Feb 22, 1994 · 341 YONGE ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
1,926 m²
Frontage
39.5 m
Depth
49.4 m
Street
Elm St
Corner lot
Yes, also on Yonge St49.4 m along it
Public lane
O'Keefe Lane, 55.8 m along it
House footprint
1,745 m²
Back yard
2.4 mhouse to rear lot line
Side yards
0 m and 0.1 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
8house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    100%14 of 14 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    30

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 14 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building.

      332 YONGE ST · Oct 14, 2026 · 70 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 588-2025) for a new 15-storey mixed-use building (East Block fronting Bay Street), by increasing the podium portions of the building heights, equipment height projections, and reducing the minimum height of the first storey. Also, the new 43-storey mixed-use building (West Block fronting Elizabeth Street) will be reducing the size of one parking space length. This is currently being reviewed under Site Plan Control (File Number 20 25 197844 STE 11 SA). There will be a total of 827 purpose-built rental units on this lot (617 residential dwelling units, and 210 affordable dwelling units).

      130 ELIZABETH ST · Jan 14, 2026 · 433 m away
    • Minor varianceApproved

      To alter the existing three-storey townhouse dwelling by constructing interior alterations to the existing open-to-above area between the basement and ground floor level of the dwelling by enclosing the floor (increasing the area of habitable space).

      97 GRANBY ST · Oct 15, 2025 · 437 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 1017-2022), for the 53-storey mixed-use building, by reducing the non-residential space, and the number of short-term bicycle parking spaces required on-site. There will be a total of 591 residential dwelling units on this site. This is currently under the review of Site Plan Control (File No. 21 206338 STE 13 SA).

      241 CHURCH ST · Jul 30, 2025 · 357 m away
    • Minor varianceApproved

      To alter the existing 15-storey apartment building by constructing a garbage storage enclosure (to be located on the upper-level of the underground parking garage), which will be the cause for a reduction in two vehicular parking spaces.

      145 MUTUAL ST · Feb 26, 2025 · 414 m away

    Latest activity nearby

    • Consent (lot split)Pending

      To obtain consent to sever a portion of stratified land (air-rights at-and-above an elevation of 121 m) for the purpose of a lot addition.

      50 GERRARD ST E · Nov 25, 2026 · 276 m away
    • Zoning review

      Closed

      335 YONGE ST · Nov 23, 2026 · 54 m away
    • Building permit

      Four wall signs.***INTERNATIONAL BUSINESS UNIVERSITY***

      655 BAY ST · Nov 19, 2026 · 243 m away
    • Building permit

      Proposed an interior alteration

      595 BAY ST · Nov 19, 2026 · 247 m away
    • Building permit

      Proposed interior alterations to replace existing revolving door with security gate.See approved AS permit 26-229850-AS

      686 BAY ST · Nov 17, 2026 · 290 m away
    • Building permit

      Proposed interior alterations to an existing office suite, including demolition and construction of interior partitions, millwork, and associated mechanical, electrical, plumbing, sprinkler, and fire alarm modifications. Suite 401

      595 BAY ST · Nov 9, 2026 · 247 m away
    • Zoning review

      Not Started

      21 DUNDAS SQ · Nov 6, 2026 · 249 m away
    • Building permit

      Proposal to install and update the existing sprinkler system in the washrooms on the 23rd floor.

      1 DUNDAS ST W · Nov 5, 2026 · 214 m away
    • Building permit

      Proposal for interior alterations, fit out for new eating establishment with karaoke rooms on the 2nd floor.

      332 YONGE ST · Nov 5, 2026 · 70 m away
    • Building permitsecondary suite

      Interior alteration, second floor additional unit

      27 MCGILL ST · Oct 27, 2026 · 245 m away

    Neighbourhood: Downtown Yonge East

    About the area around the lot, not the lot itself.

    Nearest station
    TMU Station3 min walk
    Nearest TTC stop
    Yonge St at Elm St1 min walk
    Nearest cycling route
    Gerrard St ECycle Track, 3 min walk
    Nearest traffic count
    9,550 vehicles in 14 hYonge St / Elm St, 40 m away, Apr 8, 2025
    Serious collisions within 500 m
    132021–2026, killed or seriously injured: 3 fatal, 10 with pedestrians, 3 with cyclists
    Parks
    Toronto Metropolitan University Square2 min walk
    College Park4 min walk
    Joseph Sheard Parkette4 min walk

    Schools within 1 km

    • TMU - HEASLIP HOUSE University 2 min walk
    • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF IMAGE ARTS University 3 min walk
    • TMU - HEIDELBERG CENTRE SCHOOL OF GRAPHIC COMM'NS MGMT University 3 min walk
    • TORONTO METROPOLITAN UNIVERSITY - ENTR TO BUSINESS SCHOOL LOBBY University 4 min walk
    • TORONTO METROPOLITAN UNIVERSITY - THEATRE SCHOOL University 4 min walk
    • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 4 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureDowntown Yonge EastMedian neighbourhood
    Median household income (2020)$69,500$84,500
    Households that own their home36%54%
    Population (2021)17,70016,813
    Homes built in 1960 or before7%29%
    Homes needing major repairs4%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleDowntown Yonge EastCity median
    Assault2360.8636.3
    Robbery143.369.5
    Shootings11.910.5
    Auto theft75.6192.6
    Theft over $5,00099.546.1
    Break and enter274.7172.8
    Theft from vehicles390.1188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.