Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Work or applications in progress
Good to knowRecent records on this lot: 15 204881 (FS - Sprinkler Shop Drawing - Proposal for interior alterations to the ground floor uni..., 2015).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications20 development applications open within 300 m
Good to know20 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 85 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
39 records on file: more than at 100% of Toronto houses (median 0).
- Building permit25 235083Closed
Proposal for two temporary structures for Toronto Waterfront Marathon
Oct 8, 2025 · 341-355 YONGE ST - Development application22 242103 STE 13 OZClosed
This is an application that is to address two main objectives: 1) to bring the portion of the university's lands currently zoned under the former City of Toronto Zoning By-law 438-86 into the City-wide Zoning By-law 569-2013; and 2) to establish bicycle parking, loading space, and automobile parking rates for lands owned and operated by Toronto Metropolitan University as an overlay approach in By-law 569-2013. No development is proposed as part of this application.
Dec 23, 2022 · 341-355 YONGE ST · City file - Zoning review21 229943 LTOClosedOct 25, 2021 · 351 YONGE ST
- Building permit21 213466Closed
Proposal to add ice machine, two sinks, and GI to restaurant and tie in to existing sanitary drain
Oct 6, 2021 · 351 YONGE ST - Zoning review18 157028 ZPRClosedMay 11, 2018 · 341-355 YONGE ST
- Building permit16 270087Closed
REV - 01: Revision to replace revolving doors.Proposal to replace the front doors with revolving glass doors and add stainless steel guards to restrict access to the green roof
May 29, 2017 · 341-355 YONGE ST - Zoning review17 163191 ZMPClosedMay 19, 2017 · 341-355 YONGE ST
- Building permit16 256425Closed
In conjunction with a multi-storey building on the premises, proposal to erect and display two illuminated overhanging structure signs containing static copy on the west elevation of the building. The proposed signs are facing the northerly and southerly directions, each measuring 0.28 metres vertically by 1.57 metres horizontally at a height of 3.64 metres above grade.** School of performance Ryerson University**
Dec 23, 2016 · 341-355 YONGE ST
Show 31 older records
- Building permit16 253138Closed
Proposal to install new heating coils and one new radiant heating unit
Nov 28, 2016 · 341 YONGE ST - Building permit15 197239Closed
Revision to permit # 5 (15-197239 BLD-05 BA) This revision is for the smoke venting to aid fire fighting for the ground and basement levels only. Please refer to original permit and earlier revision #3 of HVAC (15-197239-HVA-03 MS) Original large single fan to be replaced with 2 smaller fans in parallel due to size of roof opening.Revision - Installation of a mechanical smoke evacuation system
Aug 25, 2016 · 341-355 YONGE ST - Building permit16 142890Closed
Proposal for interior alterations to the 2nd floor library (#275) - to install glazed partition walls in existing university - "Ryerson University"
May 13, 2016 · 341-355 YONGE ST - Building permit15 204881Application On Hold
FS - Sprinkler Shop Drawing - Proposal for interior alterations to the ground floor unit SLC003 for new restaurant greater than 30 seats - "Basil Box"Total occupant load in restaurant = 81 patrons and 5 staff
Sep 2, 2015 · 341-355 YONGE ST - Building permit15 187762Closed
Proposal for interior alterations on the ground floor, to newly created retail unit, refer to permit # 15-155301
Aug 10, 2015 · 341 YONGE ST - Building permit15 155301Closed
Proposal to construct a demising wall on the ground floor for proposed retail unit.
Jul 8, 2015 · 341 YONGE ST - Building permit15 155308Cancelled
Proposal for interior alterations to unit 312 - 3rd floor - to construct new permenant fixed sloped seating in existing university - "Ryerson University"
May 12, 2015 · 341 YONGE ST - Zoning review14 265856 PRZClosedJan 15, 2015 · 341 YONGE ST
- Building permit11 309981Closed
Revision # 04 - for 2 hour fire resistance rating for the existing air combustion intake shaft's and fire smoke damper's at the north and south shaft's in the existing university building. Revision - to remove cafe on Level 1 - Tenant permit to be applied for at a later date.
Jan 13, 2015 · 341 YONGE ST - Building permit14 266926Closed
Proposal for interior alterations to ground floor for new cafe in the Student Centre for Ryerson University - Starbucks
Jan 6, 2015 · 341 YONGE ST - Development application14 265856 STE 27 OZClosed
The purpose of the application is to permit the reconfiguration of the ground floor and basement levels of the Ryerson Student Learning Centre. The proposal includes replacing below-grade retail uses with institutional uses, reducing the number of required retail units from 2 to 1 while maintaining retail uses on the ground floor, reducing the minimum retail store frontage along Yonge Street from 34 metres to 27 metres, and allowing for an increase in total non-residential gross floor area by approximately 410 square metres. Previously approved under Rezoning application No. 11 146654 STE 27 OZ
Dec 18, 2014 · 355 YONGE ST - Development application14 265860 STE 27 SAClosed
The purpose of the application is to permit the reconfiguration of the ground floor and basement levels of the Ryerson Student Learning Centre. The proposal includes replacing below-grade retail uses with institutional uses, reducing the number of required retail units from 2 to 1 while maintaining retail uses at grade, and allowing for an increase in total non-residential gross floor area of approximately 410 square metres on the subject site. Revised floor area for institutional use for Student Centre for Ryerson University previously approved under 11- 416675 STE 27 SA for origianl Site Plan Approval Application. See
Dec 18, 2014 · 347 YONGE ST - Building permit14 254134Closed
To erect and display one illuminated wall sign. 0.533 metres in length by 11.58 metres in width, on the south facing first building wall, in conjunction with a university located on the premises. **Ryerson University**
Nov 25, 2014 · 341 YONGE ST - Building permit14 220720Closed
Proposal to install 2 maglocks on level 2, Ryerson Library/Student Learning Centre
Oct 20, 2014 · 341 YONGE ST - Building permit13 172018Closed
Proposal for 3 new canopy's without enclosures overhanging the Yonge street side (retail spaces) of new Student Centre for Ryerson University.
Jun 6, 2013 · 341 YONGE ST - Building permit11 325098Closed
Proposal to construct an above grade connection over City-owned O'Keefe laneway from the the Ryerson Student Centre (See active BLD 11 309981) and existing Ryerson Library (See active BLD 11 314367).
Apr 3, 2013 · 341 YONGE ST - Zoning review12 120980 PSPClosedFeb 10, 2012 · 341 YONGE ST
- Building permit12 114727Cancelled
Stand alone shoring permit for tunnel connection from new student centre building at 341 Yonge St, UNDER O'KEEF LANE, and connecting to Current Ryerson Building at 350 / 380 Victoria.
Jan 31, 2012 · 341 YONGE ST - Building permit11 263684Closed
To erect and display a ground sign, containing two sign faces, at the south-westerly corner of the premises and in conjunction with a proposed Student Learning Centre. **Ryerson University**
Sep 15, 2011 · 341 YONGE ST - Zoning review11 150557 POZClosedAug 17, 2011 · 341 YONGE ST
- Development application11 146675 STE 27 SAClosed
Standard Site Plan Approval application for new 8 storey (plus mechanical) Student Centre for Ryerson University - with retail at and below grade - No Parking. Library and Study space. - Please See 11 146654 STE 27 OZ for Rezoning Application.
Mar 16, 2011 · 347 YONGE ST - Development application11 146654 STE 27 OZClosed
This is a Gold Star Rezoning application for a new 9 storey (plus mechanical) Student Centre for Ryerson University, with retail at and below grade and no parking. The proposed building includes a library and study space. The applicant is also seeking an above grade encroachment of the City-owned O'Keefe laneway and a reversal of direction for the same City-owned laneway.
Mar 16, 2011 · 347 YONGE ST - Building permit08 212634Closed
Proposal to demo existing 3 sty retatil store. See LEAD FILE 08 212618 (341 Yonge St.). Also see demo permits for 347, 349, & 353 Yonge St.
Jun 1, 2010 · 351 YONGE ST - Building permit08 212618Closed
LEAD FILE - Proposal to demo existing 1 sty retatil store. Also see demo permits for 341, 347, 349, 351, & 353 Yonge St. Note: 353 Yonge St. has been merged with 351 Yonge St.
Dec 10, 2008 · 341 YONGE ST - Building permit03 104587Closed
make interior alteration to portion of ground floor to add new restaurant containing 30 seats.
Mar 19, 2003 · 341 YONGE ST - Building permit01 182952Closed
Interior alterations to existing retail store, including partitions.
Oct 4, 2001 · 351 YONGE ST - Zoning review01 035465 ZSVClosedJan 25, 2001 · 341 YONGE ST
- Zoning review01 101599 000ClosedJan 9, 2001 · 341 YONGE ST
- Building permit95 019490Closed
BUILD 2ND FLOOR ADDITION LP
Oct 3, 1995 · 341 YONGE ST - Building permit94 013118Closed
MAKE ALTERATIONS BY CREATING OPENING AT 3RD FLOOR LEVEL IN EXISTING RETAIL STORE TENENT:SAM THE RECORDMAN SS
May 12, 1994 · 341 YONGE ST - Building permit93 023249Closed
MAKE ALTERATIONS AND BUILD MEZZANINE ADDITION AT FIRST FLOOR LEVEL. /LM
Feb 22, 1994 · 341 YONGE ST
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 1,926 m²
- Frontage
- 39.5 m
- Depth
- 49.4 m
- Street
- Elm St
- Corner lot
- Yes, also on Yonge St49.4 m along it
- Public lane
- O'Keefe Lane, 55.8 m along it
- House footprint
- 1,745 m²
- Back yard
- 2.4 mhouse to rear lot line
- Side yards
- 0 m and 0.1 mhouse to side lot lines; 0 is a shared wall
- Buildings on the lot
- 8house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
Around this lot
- Minor variances approved
- 100%14 of 14 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 30
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 14 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building.
332 YONGE ST · Oct 14, 2026 · 70 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 588-2025) for a new 15-storey mixed-use building (East Block fronting Bay Street), by increasing the podium portions of the building heights, equipment height projections, and reducing the minimum height of the first storey. Also, the new 43-storey mixed-use building (West Block fronting Elizabeth Street) will be reducing the size of one parking space length. This is currently being reviewed under Site Plan Control (File Number 20 25 197844 STE 11 SA). There will be a total of 827 purpose-built rental units on this lot (617 residential dwelling units, and 210 affordable dwelling units).
130 ELIZABETH ST · Jan 14, 2026 · 433 m away - Minor varianceApproved
To alter the existing three-storey townhouse dwelling by constructing interior alterations to the existing open-to-above area between the basement and ground floor level of the dwelling by enclosing the floor (increasing the area of habitable space).
97 GRANBY ST · Oct 15, 2025 · 437 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1017-2022), for the 53-storey mixed-use building, by reducing the non-residential space, and the number of short-term bicycle parking spaces required on-site. There will be a total of 591 residential dwelling units on this site. This is currently under the review of Site Plan Control (File No. 21 206338 STE 13 SA).
241 CHURCH ST · Jul 30, 2025 · 357 m away - Minor varianceApproved
To alter the existing 15-storey apartment building by constructing a garbage storage enclosure (to be located on the upper-level of the underground parking garage), which will be the cause for a reduction in two vehicular parking spaces.
145 MUTUAL ST · Feb 26, 2025 · 414 m away
Latest activity nearby
- Consent (lot split)Pending
To obtain consent to sever a portion of stratified land (air-rights at-and-above an elevation of 121 m) for the purpose of a lot addition.
50 GERRARD ST E · Nov 25, 2026 · 276 m away - Zoning review
Closed
335 YONGE ST · Nov 23, 2026 · 54 m away - Building permit
Four wall signs.***INTERNATIONAL BUSINESS UNIVERSITY***
655 BAY ST · Nov 19, 2026 · 243 m away - Building permit
Proposed an interior alteration
595 BAY ST · Nov 19, 2026 · 247 m away - Building permit
Proposed interior alterations to replace existing revolving door with security gate.See approved AS permit 26-229850-AS
686 BAY ST · Nov 17, 2026 · 290 m away - Building permit
Proposed interior alterations to an existing office suite, including demolition and construction of interior partitions, millwork, and associated mechanical, electrical, plumbing, sprinkler, and fire alarm modifications. Suite 401
595 BAY ST · Nov 9, 2026 · 247 m away - Zoning review
Not Started
21 DUNDAS SQ · Nov 6, 2026 · 249 m away - Building permit
Proposal to install and update the existing sprinkler system in the washrooms on the 23rd floor.
1 DUNDAS ST W · Nov 5, 2026 · 214 m away - Building permit
Proposal for interior alterations, fit out for new eating establishment with karaoke rooms on the 2nd floor.
332 YONGE ST · Nov 5, 2026 · 70 m away - Building permit
Interior alteration, second floor additional unit
27 MCGILL ST · Oct 27, 2026 · 245 m away
Neighbourhood: Downtown Yonge East
About the area around the lot, not the lot itself.
- Nearest station
- TMU Station3 min walk
- Nearest TTC stop
- Yonge St at Elm St1 min walk
- Nearest cycling route
- Gerrard St ECycle Track, 3 min walk
- Nearest traffic count
- 9,550 vehicles in 14 hYonge St / Elm St, 40 m away, Apr 8, 2025
- Serious collisions within 500 m
- 132021–2026, killed or seriously injured: 3 fatal, 10 with pedestrians, 3 with cyclists
- Parks
- Toronto Metropolitan University Square2 min walk
- College Park4 min walk
- Joseph Sheard Parkette4 min walk
Schools within 1 km
- TMU - HEASLIP HOUSE University 2 min walk
- TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF IMAGE ARTS University 3 min walk
- TMU - HEIDELBERG CENTRE SCHOOL OF GRAPHIC COMM'NS MGMT University 3 min walk
- TORONTO METROPOLITAN UNIVERSITY - ENTR TO BUSINESS SCHOOL LOBBY University 4 min walk
- TORONTO METROPOLITAN UNIVERSITY - THEATRE SCHOOL University 4 min walk
- TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 4 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Downtown Yonge East | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $69,500 | $84,500 |
| Households that own their home | 36% | 54% |
| Population (2021) | 17,700 | 16,813 |
| Homes built in 1960 or before | 7% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Downtown Yonge East | City median |
|---|---|---|
| Assault | 2360.8 | 636.3 |
| Robbery | 143.3 | 69.5 |
| Shootings | 11.9 | 10.5 |
| Auto theft | 75.6 | 192.6 |
| Theft over $5,000 | 99.5 | 46.1 |
| Break and enter | 274.7 | 172.8 |
| Theft from vehicles | 390.1 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.