HousePrecheckCheck an address

3400 Victoria Park AveHillcrest Village, Toronto · City records before you offer

53.3 × 76.6 m3,929 m²on Victoria Park Avecorner, also on McNicoll Ave

1 thing to check before you offer, including zoning not in By-law 569-2013
N20 m
53.3 m frontage76.6 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 3400 Victoria Park Ave

3400 Victoria Park Ave is on a 53.3 m by 76.6 m lot on Victoria Park Ave in Hillcrest Village. This lot is not covered by Toronto's city-wide zoning by-law 569-2013, so a by-law of the former city or borough most likely still applies. Toronto Building can confirm which one. The lot also fronts McNicoll Ave.

The City has 24 records on this lot since 2002. That is more than at 99% of Toronto houses. In 2025, a building permit was filed: "Proposal for interior alteration to existing unit". Status: closed. In 2021, a building permit was filed: "The proposal contains two illuminated ground signs, displaying electronic static copy located along the drive through.*****tim horton's*****". Status: closed. In 2021, a building permit was filed: "Proposal to replace the existing backflow preventer". Status: closed. Nothing on file is open right now.

No development applications are open within 300 m. Within 300 m, the Committee of Adjustment decided 7 minor variance applications in the last 10 years and approved 100%. The nearest TTC stop is McNicoll Ave at Victoria Park Ave West Side, a 1-minute walk.

Summary

What the City's records show on this house

  • Zoning not in By-law 569-2013Moderate
  • 4 City trees in front of this lotLowFree check
  • 1 Committee of Adjustment file on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

1 thing to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Clear

Open City files

How much in the City's records needs answers before an offer

  • No open orders or by-law investigations
  • No permits left open for years
  • No work or applications in progress

What this part means for this house, in plain EnglishUnlock

  1. 1 Committee of Adjustment file on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

24 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2025-10-07Building permit
25 233563
Proposal for interior alteration to existing unit.Closed
2021-05-26Building permit
21 156215
The proposal contains two illuminated ground signs, displaying electronic static copy located along the drive through.*****TIM HORTON'S*****Closed
2021-03-05Zoning review
21 123516 ZSV
No description on fileClosed
2021-01-06Building permit
20 234780
Proposal to replace the existing backflow preventerClosed
2019-11-12Zoning review
19 247985 ZPR
No description on fileClosed
2018-11-23Building permit
18 257079
Proposal for 2 back flow prevention devicesClosed
2018-04-11Building permit
18 134333
In conjunction with a gas station on the premises, proposal to erect and display one illuminated overhanging structure sign displaying static copy, one illuminated wall sign displaying static copy and two illuminated ground signs displaying static copy and readograph copy. The overhanging structure sign is located on the east elevation of the one storey convenience storey, measuring 1.52 metres vertically by 3.87 metres horizontally at a height of 4.78 metres above grade. The wall sign is located on the south elevation of the one storey car wash, measuring 1.22 metres vertically by 3.1 metres horizontally at a height of 4.56 metres above grade. One of the ground signs is located on the south frontage, perpendicular to McNicoll Avenue, containing two sign faces, oriented back-to-back, each sign face measuring 3.71 metres vertically by 1.9 metres horizontally at a height of 5.94 metres above grade. The other ground sign is located on the east frontage, perpendicular to Victoria Park Avenue, containing two sign faces, oriented back-to-back, each sign face measuring 4.18 metres vertically by 1.9 metres horizontally at a height of 5.94 metres above grade.******CIRCLE K******Closed
2018-02-14Building permit
18 117300
Building cladding alterations to accommondate new storefront signage.Cancelled
2017-12-22Zoning review
17 278595 ZMP
No description on fileClosed
2017-08-18Zoning review
17 219046 ZPR
No description on fileClosed
2016-08-29Zoning review
16 214481 ZZU
No description on fileClosed
2014-04-15Building permit
14 126939
HVAC - Interior alteration for "Tim Horton" store in existing gas stationClosed
2013-11-15Zoning review
13 265775 ZPR
No description on fileClosed
2005-05-04Zoning review
05 128965 LTO
No description on fileClosed
2004-12-13Zoning review
04 199879 LTO
No description on fileClosed
2004-11-03Zoning review
04 188082 ZPU
No description on fileClosed
2004-07-27Building permit
04 140245
Drain - to construct a new Gas station with 173 retail store and 521.1 gas station and car wash. - New BuildingClosed - Dormant
2004-07-12Zoning review
04 155469 ZPR
No description on fileClosed
2004-05-28Building permit
04 140243
to construct a new Gas station with 173 retail store and 521.1 gas station and car wash.Cancelled
2004-05-28Building permit
04 124279
Proposed Demolition of existing Kiosk,Gas bar canopy and storage shedClosed
2003-09-18Minor variance
A073/03NY
This is an application under Section 45 of the Planning Act, for variance from the provisions of the North York Zoning By-law 7625, as amended, to permit the construction of a new gasoline station with a retail store and car wash on the above noted property. The existing gasoline station would be demolished.Approved
2003-07-04Zoning review
03 152276 ZPR
No description on fileClosed
2003-03-26Zoning review
03 118080 PSP
No description on fileClosed
2002-06-12Zoning review
02 145660 ZPR
No description on fileClosed
Minor

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Zoning not in By-law 569-2013
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Zoning not in By-law 569-2013

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. 4 City trees in front of this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N20 m
53.3 m frontage76.6 m deepon Victoria Park Ave
Zone
—
Height limit
—
Corner lot
Yes, also on McNicoll Ave
Public lane
None
House footprint
396 m²
Back yard
40.3 m
Buildings on the lot
3

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Quiet

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 1 development application within 300 m in 10 years, none open
    • 7 minor variance decisions within 300 m, 100% approved

    What this part means for this house, in plain EnglishUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime near median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 4 of 7 categories
    • Robbery: 2.4 times the Toronto median
    • Theft over $5,000: 1.8 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Hillcrest Village neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$86,000median $84,500
    Households that own their home72%median 54%
    Population (2021)16,345median 16,813
    Homes built in 1960 or before7%median 29%
    Homes needing major repairs6%median 7%

    Getting around and schools

    • McNicoll Ave at Victoria Park Ave West SideNearest TTC stop1 min walk
    • Finch Corridor TrlNearest cycling route9 min walk
    • Toronto International College Secondary SchoolSchool2 min walk
    • Lowell International Academy Secondary SchoolSchool2 min walk
    • Toronto Heuristic International AcademySchool3 min walk
    • McCanny Secondary SchoolSchool5 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.3467.3
    • Robberycity median 69.5166.9
    • Shootingscity median 10.55.6
    • Auto theftcity median 192.6116.8
    • Theft over $5,000city median 46.183.4
    • Break and entercity median 172.8200.3
    • Theft from vehiclescity median 188.1172.5

    More about Hillcrest Village

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 29, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 3400 Victoria Park Ave

    1 thing to check at 3400 Victoria Park Ave before you offer

    • Zoning not in By-law 569-2013Moderate
    • 4 City trees in front of this lotLow
    • 1 Committee of Adjustment file on this lotLow

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • The one step to take before you offer, so nothing slips
    • 15 sets of public records, already searched and read for you
    • What each of the 3 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.