Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Building permit open since 2012
Needs a closer lookStill open in the City's records: 11 322894 (Midtown Honda - Front vestibule addition, 2012, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Work or applications in progress
Good to knowRecent records on this lot: 22 191100 NNY 08 SB (Draft Subdivisoin Approval for creation of 4 lots, 2022); 22 191093 NNY 08 SA (Proposal for mixed use development of two 29-storey high-rise buildings Building A with..., 2022); 22 191094 NNY 08 OZ (Official plan amendment and Rezoning to allow the development of two 29-storey high-ris..., 2022).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications1 Committee of Adjustment file on this lot
Good to know0 approved. A0614/10NY (The applicant is proposing to construct a new two storey automotive dealership on the a..., 2011).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)3 development applications open within 300 m
Good to know3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 29 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
15 records on file: more than at 100% of Toronto houses (median 0).
- Zoning review22 191094 POZClosedSep 28, 2022 · 3400 DUFFERIN ST
- Zoning review22 191100 PSBClosedSep 9, 2022 · 3400 DUFFERIN ST
- Development application22 191100 NNY 08 SBUnder Review
Draft Subdivisoin Approval for creation of 4 lots
Aug 15, 2022 · 3400 DUFFERIN ST · City file - Development application22 191093 NNY 08 SAUnder Review
Proposal for mixed use development of two 29-storey high-rise buildings Building A with 388 Units and Building B with 381 units and one 10-storey mid-rise Building C with 75 units, resulting in a total of 834 residential units. The total proposed residential floor area is 59,444 m2, and non-residential floor area is 1,365 m2.
Aug 15, 2022 · 3400 DUFFERIN ST · City file - Development application22 191094 NNY 08 OZUnder Review
Official plan amendment and Rezoning to allow the development of two 29-storey high-rise buildings Building A with 388 Units and Building B with 381 units and one 10-storey mid-rise Building C with 75 units, resulting in a total of 834 residential units. The total proposed residential floor area is 59,444 m2, and non-residential floor area is 1,365 m2.
Aug 15, 2022 · 3400 DUFFERIN ST · City file - Zoning review17 277919 LPRClosedDec 20, 2017 · 3400 DUFFERIN ST
- Building permit16 178838Closed
To erect and display one illuminated wall sign.**UNI QLO**
Oct 24, 2016 · 3400 DUFFERIN ST - Building permit13 131363Cancelled
To erect and display a static copy illuminated ground sign, at the northeasterly frontage of the property, in conjunction with a car dealership operating on the premises. **Honda**
Mar 12, 2013 · 3400 DUFFERIN ST
Show 7 older records
- Building permit11 322894Inspection
Midtown Honda - Front vestibule addition
Feb 9, 2012 · 3400 DUFFERIN ST - Building permit11 287094Closed
To erect and display the following six illuminated, static copy wall signs at the first storey, all in conjunction with an existing car dealership. **Honda**
Jan 27, 2012 · 3400 DUFFERIN ST - Minor varianceA0614/10NYRefused
The applicant is proposing to construct a new two storey automotive dealership on the above noted property. The existing building would be demolished. Please note, that on February 9, 2011 the application was deferred to facilitate the correction of a minor variance relating to a side yard setback.
Mar 9, 2011 · 3400 DUFFERIN ST - Zoning review10 247405 ZPRClosedAug 26, 2010 · 3400 DUFFERIN ST
- Zoning review07 106223 LTOClosedFeb 1, 2007 · 3400 DUFFERIN ST
- Zoning review06 169537 PSPClosedAug 23, 2006 · 3400 DUFFERIN ST
- Building permit06 128104Cancelled
Addition of new vestibule, handicapped ramp and washroom. and modifcation and alteration of the existing facade.
Apr 24, 2006 · 3400 DUFFERIN ST
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 16,687 m²
- Frontage
- 110.3 mestimated, irregular lot
- Depth
- 202.1 mestimated, irregular lot
- Street
- Dufferin St
- Corner lot
- Yes, also on York Heights Ter202.1 m along it
- Public lane
- None
- House footprint
- 3,201 m²roof up to 9.9 m
- Back yard
- 64.2 mhouse to rear lot line
- Side yards
- 13.8 m and 44 mhouse to side lot lines
- Buildings on the lot
- 2house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
Around this lot
- Minor variances approved
- 100%7 of 7 decisions
- Garden suite permits
- 1
- Laneway suite permits
- 0
- Multiplex permits
- 3
- Development applications
- 5
Within 300 m, last 10 years. 4 suite and multiplex permits: more than at 54% of Toronto houses (median 3). 7 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To convert the existing garage into a two (2) storey Garden Suite.
45 MCADAM AVE · Nov 12, 2026 · 357 m away - Minor varianceApproved
To construct an ancillary building (garden suite) with a second storey balcony in the rear yard.
5 GLEN BELLE CRES · May 21, 2026 · 342 m away - Minor varianceApproved with conditions
To remove a portion of the existing commercial building and construct a new showroom to facilitate in the conversion to a new (Nissan) Automotive Retail Sales and Service Facility. Please note, this application was previously deferred Thursday, February 5, 2026.
111 BRIDGELAND AVE · Apr 16, 2026 · 339 m away - Minor varianceApproved with conditions
To alter the development standards (as approved under Site Specific Zoning By-law No. 640-2024) for the proposed 10-storey residential building. Please note this application was previously deferred by the Committee on March 5, 2026. The related Site Plan application (File No. 24 224540 NNY 08 SA) is currently under review.
12-14 BENTWORTH AVE · Apr 16, 2026 · 356 m away - Minor varianceApproved
To construct a new detached garage which would include a garden suite.
54 BENTWORTH AVE · May 15, 2025 · 452 m away
Latest activity nearby
- Building permit
To demolish existing dwelling and construct a 3 storey fourplex
40 CARTWRIGHT AVE · Nov 25, 2026 · 218 m away - Building permit
Proposal to construct a 3 storey fourplex
40 CARTWRIGHT AVE · Nov 25, 2026 · 218 m away - Building permit
Proposal two story garden suite at rear of proposed three story fourplex residential building (including demolish existing one and a half story bungalow)
40 CARTWRIGHT AVE · Nov 25, 2026 · 218 m away - Building permit
Proposal for interior alterations to convert existing office to a dental office.
16 MCADAM AVE · Aug 19, 2026 · 259 m away - Building permit
Installation of new fire hydrant
95 BRIDGELAND AVE · Aug 7, 2026 · 200 m away - Building permit
1 WALL SIGN ON WEST ELEVATION**MOTORCADE**
95 BRIDGELAND AVE · Jul 14, 2026 · 200 m away - Building permit
Revision 03 - Revision to revise manual vent locations for battery storage area related to original permit due to existing building conditions.-------------------------------------------------------------Revision 02 - to remove previously proposed rated corridors and a washroomProposal for interior alterations, new racking, and roof work related to RTUs for an existing warehouse.
95 BRIDGELAND AVE · Jun 30, 2026 · 200 m away - Building permit
1 Wall Sign ** MOTORECADE INDUSTRIES INC. **
95 BRIDGELAND AVE · Jun 12, 2026 · 200 m away - Zoning review
Closed
40 CARTWRIGHT AVE · Apr 10, 2026 · 218 m away - Zoning review
Cancelled
40 CARTWRIGHT AVE · Mar 11, 2026 · 218 m away
Neighbourhood: Yorkdale-Glen Park
About the area around the lot, not the lot itself.
- Nearest station
- Yorkdale Station13 min walk
- Nearest TTC stop
- Dufferin St at Jane Osler Blvd - Yorkdale Shopping Centre2 min walk
- Nearest cycling route
- Ranee AveBike Lane, 13 min walk
- Nearest traffic count
- 23,906 vehicles in 8 hDufferin St / Hwy 401 Collectors E Dufferin St S Ramp, 110 m away, Mar 22, 2016
- Serious collisions within 500 m
- 02021–2026, killed or seriously injured
- Parks
- Jane Osler Park3 min walk
- Ranee Park7 min walk
- De Havilland 'mossie' Park11 min walk
Schools within 1 km
- THE STERLING HALL SCHOOL Private 8 min walk
- YORKDALE SECONDARY SCHOOL & ADULT LEARNING CENTRE English Public 9 min walk
- LAWRENCE HEIGHTS MDL SCHOOL English Public 12 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Yorkdale-Glen Park | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $79,000 | $84,500 |
| Households that own their home | 54% | 54% |
| Population (2021) | 16,625 | 16,813 |
| Homes built in 1960 or before | 27% | 29% |
| Homes needing major repairs | 8% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Yorkdale-Glen Park | City median |
|---|---|---|
| Assault | 1212.6 | 636.3 |
| Robbery | 146.8 | 69.5 |
| Homicide | 4.7 | 5.3 |
| Shootings | 28.4 | 10.5 |
| Auto theft | 492.6 | 192.6 |
| Theft over $5,000 | 274.7 | 46.1 |
| Break and enter | 341.1 | 172.8 |
| Theft from vehicles | 360 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.