HousePrecheckCheck an address

340 The East MallToronto · zoning, lot size and permit records

≈ 78.3 × 140.3 m7,064 m²on Gibbs Rdcorner, also on The East Mall

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 8 storeys, 82 rental units, built 1966More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • 1 development application open within 300 m, up to 40 storeysNew buildings may go up around here in the next years. More change nearby than at 88% of Toronto houses.
  • 1 open order or by-law investigation at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 26 267877 PRS 00 IR (Property Standards, 2026, status Order Issued).
  • City upkeep score: 98 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N50 m
≈ 78.3 m frontage≈ 140.3 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 open order or by-law investigation

    Needs a closer look

    Not resolved in the City's records: 26 267877 PRS 00 IR (Property Standards, 2026, status Order Issued).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 4 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards): 26 260262 PRS 00 IR (Property Standards, 2026); 26 220968 PRS 00 IR (Property Standards, 2026); 26 125475 PRS 00 IR (Property Standards, 2026); and 1 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 1 Committee of Adjustment file on this lot

    Good to know

    0 approved. A268/15EYK (To convert the existing storage and service area on the ground floor into 3 dwelling units, 2015).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 40 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 98 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (8 storeys, 82 units, built 1966).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

17 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 267877 PRS 00 IROrder Issued

    Property Standards

    Nov 9, 2026 · 340 THE EAST MALL
  • By-law investigation26 260262 PRS 00 IRClosed

    Property Standards

    Oct 26, 2026 · 340 THE EAST MALL
  • By-law investigation26 220968 PRS 00 IRClosed

    Property Standards

    Aug 17, 2026 · 340 THE EAST MALL
  • By-law investigation26 125475 PRS 00 IRClosed

    Property Standards

    Mar 5, 2026 · 340 THE EAST MALL
  • By-law investigation25 250418 HEA 00 IRClosed

    Adequate Heat

    Nov 6, 2025 · 340 THE EAST MALL
  • Zoning review24 132154 LPRClosed
    Apr 4, 2024 · 340 THE EAST MALL
  • Zoning review19 102786 ZSVCancelled
    Jan 9, 2019 · 340 THE EAST MALL
  • Building permit16 243691Closed

    Proposed interior alterations to convert sotrage areas into 3 units

    Sep 29, 2017 · 340 THE EAST MALL
Show 9 older records
  • Zoning review17 174135 ZSVClosed
    Jun 6, 2017 · 340 THE EAST MALL
  • Building permit15 175372Closed

    Proposal to convert storage rooms 009, 004, 002 in the parking garage to lockers in existing apartment building.

    Aug 11, 2015 · 340 THE EAST MALL
  • Minor varianceA268/15EYKRefused

    To convert the existing storage and service area on the ground floor into 3 dwelling units.

    Jun 4, 2015 · 340 THE EAST MALL
  • Building permit14 243557Closed

    Replacement of fire alarm annunicator and panel on the basement and ground floor

    Nov 17, 2014 · 340 THE EAST MALL
  • Zoning review14 243892 ZPRClosed
    Oct 27, 2014 · 340 THE EAST MALL
  • Zoning review13 277921 ZPRClosed
    Dec 13, 2013 · 340 THE EAST MALL
  • Building permit12 159704Closed

    Balcony and exterior wall repair and guardrail replacement.

    May 22, 2012 · 340 THE EAST MALL
  • Building permit10 285960Closed

    Proposed backflow prevention device to be installed in existing apartment building.

    Nov 24, 2010 · 340 THE EAST MALL
  • Building permit96 085120Closed

    FIRE ALARM/EMERGENCY LIGHTS RETROFIT-APT

    Oct 24, 1996 · 340 THE EAST MALL

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
7,064 m²
Frontage
78.3 mestimated, irregular lot
Depth
140.3 mestimated, irregular lot
Street
Gibbs Rd
Corner lot
Yes, also on The East Mall140.3 m along it
Public lane
None
House footprint
1,120 m²roof up to 33.1 m
Back yard
28.9 mhouse to rear lot line
Side yards
15.5 m and 16.8 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 4 City trees in front of this lot. The City's street tree inventory lists 4 trees at this address: linden, littleleaf (60 cm), linden, littleleaf (59 cm), linden, littleleaf (50 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%5 of 5 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
2
Development applications
6

Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 5 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a two-storey north and south side addition that will include an attached garage and to convert the existing basement into a secondary suite with a basement walk-out.

    282 THE EAST MALL · Jun 25, 2026 · 364 m away
  • Minor varianceApproved

    To construct a new three-storey rear addition and a third storey addition above the existing dwelling in order to permit a duplex.

    42 BLAKETON RD · Mar 20, 2025 · 361 m away
  • Minor varianceApproved

    To construct a new school with a fence along the property line and adjacent to highway 427 and an accessory structure (garbage enclosure) in the front yard.

    5 REDCAR AVE · Mar 6, 2025 · 425 m away
  • Minor varianceApproved

    To a new one-storey addition above the existing dwelling and a new two storey rear and south side addition.

    25 CRONIN DR · Oct 24, 2024 · 416 m away
  • Minor varianceApproved

    To construct a garden suite in the rear yard.

    82 LAUREL AVE · Oct 24, 2024 · 480 m away

Latest activity nearby

  • Building permit

    REV 01: Revision to floor plan as per bubbled drawingsProposed interior alterations for pharmacy and medical office

    300-304 THE EAST MALL · Nov 24, 2026 · 167 m away
  • Building permit

    Part Permit - PHASE 2 - Construct new 39 storey residential building with 438 rental units, including 4 storey podium and 2 levels of u/g parking garage - Tower B - Market Building

    300-304 THE EAST MALL · Nov 23, 2026 · 167 m away
  • Zoning review

    Closed

    15 GIBBS RD · Aug 25, 2026 · 153 m away
  • Building permit

    Proposed interior alterations for fit-out of shell unit into dental office

    300-304 THE EAST MALL · Aug 10, 2026 · 167 m away
  • Building permit

    Exterior back water valve installation

    8 NIPISSING DR · Jun 22, 2026 · 245 m away
  • Building permit

    Code Analysis for Proposed Alternative Solution for the Omission of Fire Hose Cabinets;

    300-304 THE EAST MALL · Feb 27, 2026 · 167 m away
  • Building permit

    Remove interior walls and replace with beams/posts.

    14 NIPISSING DR · Jan 21, 2026 · 261 m away
  • Building permit

    Proposed rear detached garage

    5 LORMAR DR · Sep 3, 2025 · 203 m away
  • Building permit

    Proposed garage in the rear yard of the existing SFD.

    5 LORMAR DR · Aug 18, 2025 · 203 m away
  • Building permit

    Proposed detached garage to an existing dwelling

    5 LORMAR DR · Aug 8, 2025 · 203 m away

Neighbourhood: Islington

About the area around the lot, not the lot itself.

Nearest station
Kipling Station29 min walk
Nearest TTC stop
The East Mall at Gibbs Rd1 min walk
Nearest cycling route
Renforth DrBike Lane, 10 min walk
Nearest traffic count
17,771 vehicles in 14 hGibbs Rd / The East Mall, 80 m away, Nov 5, 2024
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
East Mall Park3 min walk
Smithwood Park9 min walk
Leavenworth Parkette10 min walk

Schools within 1 km

  • BLOORLEA MDL SCHOOL English Public 3 min walk
  • ST ELIZABETH CATHOLIC ELEMENTARY SCHOOL English Separate 7 min walk
  • TORONTO DISTRICT SCHOOL BOARD - WEST EDUCATION OFFICE English Public 10 min walk
  • KINGSLEY PRIMARY SCHOOL Private 11 min walk
  • EATONVILLE JR SCHOOL English Public 12 min walk
  • ETOBICOKE SECONDARY ALTERNATIVE SCHOOL English Public 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureIslingtonMedian neighbourhood
Median household income (2020)$102,000$84,500
Households that own their home68%54%
Population (2021)23,46016,813
Homes built in 1960 or before32%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleIslingtonCity median
Assault389.6636.3
Robbery39.369.5
Homicide3.65.3
Shootings3.610.5
Auto theft171.6192.6
Theft over $5,00053.646.1
Break and enter293.1172.8
Theft from vehicles143188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.