HousePrecheckCheck an address

340 Assiniboine RdToronto · zoning, lot size and permit records

67.4 × 114.7 m7,602 m²on Assiniboine Rdcorner, also on Sheffer Ter

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
N50 m
67.4 m frontage114.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    1 records on file: more than at 53% of Toronto houses (median 0).

    • Building permit95 251094Closed - Dormant

      RETROFIT FIRE ALARM

      Sep 6, 1995 · 4 ASSINIBOINE RD

    Check before you build

    • Zoning not in By-law 569-2013

      Needs a closer look

      This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

      Zoning By-law 569-2013

    Lot facts

    Area
    7,602 m²
    Frontage
    67.4 m
    Depth
    114.7 m
    Street
    Assiniboine Rd
    Corner lot
    Yes, also on Sheffer Ter114.7 m along it
    Public lane
    None
    House footprint
    647 m²roof up to 47.8 m
    Back yard
    6.9 mhouse to rear lot line
    Side yards
    18 m and 19.4 mhouse to side lot lines
    Buildings on the lot
    2house, garage, sheds
    Max height
    —
    Max lot coverage
    —

    House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

      Around this lot

      Minor variances approved
      100%1 of 1 decisions
      Garden suite permits
      0
      Laneway suite permits
      3
      Multiplex permits
      6
      Development applications
      1

      Within 300 m, last 10 years. 9 suite and multiplex permits: more than at 72% of Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

      Recent variance decisions in the same zone

      • Minor varianceApproved

        To maintain the existing lodging house which will contain a total of 8 rooms and to construct a rear yard platform.

        14 BOAKE ST · May 28, 2026 · 248 m away
      • Minor varianceApproved

        To alter the existing building to contain a total of 7 dwelling rooms. The existing dwelling unit and secondary suite will be maintained.

        27 MANSUR TER · Feb 6, 2025 · 407 m away
      • Minor varianceApproved

        To permit an Crisis Care Shelter.

        26 MANSUR TER · Jul 28, 2022 · 392 m away
      • Minor varianceApproved

        To permit a secondary suite within the basement and first floor of the existing semi-detached dwelling.

        265 COOK RD · Jun 11, 2015 · 465 m away
      • Minor varianceApproved

        This is an application under Section 45 of the Planning Act, for variance from the provisions of the North York Zoning By-law 7625 and Site Specific By-law 716-2003, as amended, to permit the construction of a new three storey semi detached dwelling on the above noted property (Lot #6L).

        30 KIDD TER · Oct 14, 2004 · 272 m away

      Latest activity nearby

      • Building permit

        Interior alterations to convert SFD to multi-tenant dwelling

        14 BOAKE ST · Nov 16, 2026 · 248 m away
      • Building permitlaneway suite

        Proposal to convert the existing garage into a one storey laneway suite with no changes to building height or setbacks.

        375 ASSINIBOINE RD · Nov 2, 2026 · 95 m away
      • Building permitmultiplex

        Proposal to covert existing single family dwelling into fourplex (Unit # 4)

        332 COOK RD · Oct 21, 2026 · 246 m away
      • Building permitmultiplex

        Proposed interior alterations to convert existing SFD to 4 unit residential building

        324 COOK RD · Oct 15, 2026 · 270 m away
      • Building permit

        REVISION - Based on site review, we will need to replace the existing fire alarm wiring serving the fire alarm pull stations. We updated the electrical drawings accordingly.Proposal to upgrade the fire alarm system in an existing apartment building.

        380 ASSINIBOINE RD · Jun 16, 2026 · 132 m away
      • Minor varianceApproved

        To maintain the existing lodging house which will contain a total of 8 rooms and to construct a rear yard platform.

        14 BOAKE ST · May 28, 2026 · 248 m away
      • Building permitlaneway suite

        Proposal to alter existing detached garage converting to a laneway suite

        26 ALDWINCKLE HTS · Jan 22, 2026 · 266 m away
      • Building permit

        Proposal to construct a fire escape deck and ladder.

        324 COOK RD · Jan 21, 2026 · 270 m away
      • Building permitsecondary suite

        Proposal for secondary suite in basement and one new fire rated window in basement.

        20 BOAKE ST · Jan 5, 2026 · 237 m away
      • Zoning review

        Closed

        14 BOAKE ST · Dec 31, 2025 · 248 m away

      Neighbourhood: York University Heights

      About the area around the lot, not the lot itself.

      Nearest station
      Sentinel Station14 min walk
      Nearest TTC stop
      Sentinel Rd at The Pond Rd South Side2 min walk
      Nearest cycling route
      Sentinel RdBike Lane, 2 min walk
      Nearest traffic count
      4,169 vehicles in 8 hAssiniboine Rd / Sentinel Rd, 140 m away, Jan 26, 2022
      Serious collisions within 500 m
      02021–2026, killed or seriously injured
      Parks
      Fred Young Park3 min walk
      175 the Pond Road Park3 min walk
      Dan Iannuzzi Park4 min walk

      Schools within 1 km

      • SENECA COLLEGE (SENECA AT YORK CAMPUS) College 8 min walk
      • YORK U - KEELE CAMPUS University 9 min walk
      • ST WILFRID CATHOLIC ELEMENTARY SCHOOL English Separate 15 min walk
      • JAMES CARDINAL MCGUIGAN CATHOLIC HIGH SCHOOL English Separate 16 min walk

      Being near a school does not mean the lot is in its catchment; check with the board.

      2021 Census

      FigureYork University HeightsMedian neighbourhood
      Median household income (2020)$76,000$84,500
      Households that own their home47%54%
      Population (2021)28,25516,813
      Homes built in 1960 or before14%29%
      Homes needing major repairs8%7%

      Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

      Police-reported crime, 2025

      Per 100,000 peopleYork University HeightsCity median
      Assault1274.1636.3
      Robbery12869.5
      Shootings11.910.5
      Auto theft634.1192.6
      Theft over $5,000178.646.1
      Break and enter375.1172.8
      Theft from vehicles312.6188.1

      Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

      Something here not right?

      Sources

      • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
      • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
      • Development applications: Rezoning, site plan, subdivision and condominium applications.
      • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
      • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
      • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
      • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
      • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
      • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
      • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
      • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
      • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
      • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
      • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
      • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
      • Address points: loaded Nov 22, 2026, published Nov 20, 2026
      • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
      • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
      • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
      • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
      • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
      • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
      • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
      • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
      • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
      • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
      • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
      • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
      • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
      • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
      • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
      • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
      • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
      • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
      • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
      • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
      • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
      • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
      • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
      • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
      • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
      • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
      • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
      • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
      • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
      • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
      • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
      • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
      • School locations: loaded Oct 14, 2026, published May 27, 2026
      • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
      • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
      • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
      • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
      • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
      • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
      • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
      • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
      • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
      • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
      • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
      • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
      • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
      • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

      Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

      Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

      Flag an error

      What is not right?

      The problem

      The records come from the City's open data; we check each flag against them. Your email is used only to answer this.