HousePrecheckCheck an address

34 Progress AveToronto · zoning, lot size and permit records

Employment · E 0.732.0 × 91.7 m2,924 m²on Progress Avecorner, also on 31 Progress Ave

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
N50 m
32.0 m frontage91.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    3 records on file: more than at 81% of Toronto houses (median 0).

    • Zoning review19 258861 ZZUClosed
      Dec 9, 2019 · 34 PROGRESS AVE
    • Zoning review19 233614 ZZUClosed
      Oct 8, 2019 · 34 PROGRESS AVE
    • Building permit12 123791Closed

      install 1 backflow device

      May 3, 2012 · 34 PROGRESS AVE

    Lot facts

    Area
    2,924 m²
    Frontage
    32 m
    Depth
    91.7 m
    Street
    Progress Ave
    Corner lot
    Yes, also on 31 Progress Ave91.7 m along it
    Public lane
    None
    House footprint
    1,139 m²roof up to 8 m
    Back yard
    30.2 mhouse to rear lot line
    Side yards
    4.3 m and 4.5 mhouse to side lot lines
    Buildings on the lot
    1house, garage, sheds
    Max height
    —
    Max lot coverage
    —

    House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    • Zone E 0.7 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source

    Around this lot

    Minor variances approved
    75%3 of 4 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    2

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 4 variance decisions: no more than at most Toronto houses (median 19).

    Latest activity nearby

    • Minor variancePending

      To modify the existing front yard parking to add two additional parking spaces and to allow for the continued use as a Day Nursery.

      24 PROGRESS AVE · Dec 2, 2026 · 67 m away
    • Building permit

      Proposal for a a temporary (seasonal) structure (to be used as a Garden Center) that will go in the parking lot of Metro for Summer 2027 Installation from April 1st to June 30th, 2027 (approximately 13 weeks).

      16 WILLIAM KITCHEN RD · Nov 2, 2026 · 203 m away
    • Zoning review

      Closed

      30 PROGRESS AVE · Sep 10, 2026 · 35 m away
    • Building permit

      REV 01: proposed change the building classification, and provide new fire seperation details for the floor systemProposed construct new 2nd floor addition over top of an existing warehouse.

      12 PROGRESS AVE · Aug 31, 2026 · 146 m away
    • Zoning review

      Notice Sent

      24 PROGRESS AVE · Aug 7, 2026 · 67 m away
    • Zoning review

      Closed

      60 PROGRESS AVE · Jun 17, 2026 · 122 m away
    • Zoning review

      Closed

      12 WILLIAM KITCHEN RD · May 14, 2026 · 162 m away
    • Zoning review

      Cancelled

      9 PROGRESS AVE · Mar 13, 2026 · 179 m away
    • Building permit

      1 WALL SIGN**ROCKET BEAR PLAYGROUND & ROLLERSKATE***UNIT J3*

      11 WILLIAM KITCHEN RD · Mar 5, 2026 · 255 m away
    • Zoning review

      Closed

      30 PROGRESS AVE · Feb 18, 2026 · 35 m away

    Neighbourhood: Dorset Park

    About the area around the lot, not the lot itself.

    Nearest station
    Agincourt GO Station25 min walk
    Nearest TTC stop
    Progress Ave at William Kitchen Rd West Side1 min walk
    Nearest traffic count
    11,027 vehicles in 8 hWilliam Kitchen Rd / Progress Ave, 60 m away, Feb 23, 2022
    Serious collisions within 500 m
    12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
    Parks
    Jolly Way Park8 min walk
    Glamorgan Park9 min walk
    West Birkdale Park12 min walk

    Schools within 1 km

    • ENQUIRING MINDS MONTESSORI AND LONDON SCHOOL OF DANCE Private 1 min walk
    • CENTENNIAL COLLEGE - MIDLAND CAMPUS College 13 min walk
    • GLAMORGAN JR PUBLIC SCHOOL English Public 13 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureDorset ParkMedian neighbourhood
    Median household income (2020)$79,000$84,500
    Households that own their home60%54%
    Population (2021)24,30516,813
    Homes built in 1960 or before26%29%
    Homes needing major repairs7%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleDorset ParkCity median
    Assault672636.3
    Robbery112.669.5
    Shootings18.210.5
    Auto theft356192.6
    Theft over $5,00072.646.1
    Break and enter192.5172.8
    Theft from vehicles334.2188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.