HousePrecheckCheck an address

339 Queens Quay WToronto · zoning, lot size and permit records

120.0 × 122.1 m13,220 m²on Queens Quay W

Not a home

Hto Park & Fire Hall 334 & Ems Stn 36

The City of Toronto's real estate inventory lists Hto Park & Fire Hall 334 & Ems Stn 36 here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • An emergency stationSirens and vehicles leaving at any hour; help close by.
  • Permits or applications open on this parcelRecent records on this lot: 26 267307 (Fire Hall 334 - Assessment, design, and replacement of multiple roof systems, including..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
N50 m
120.0 m frontage122.1 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (31% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Natural Heritage System (49% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 267307 (Fire Hall 334 - Assessment, design, and replacement of multiple roof systems, including..., 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

23 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 267307Application Acceptable

    Fire Hall 334 - Assessment, design, and replacement of multiple roof systems, including the sloped PVC roof, upper roof, and lower roof terrace roofing systems. The work includes replacing aging roofing assemblies, improving waterproofing performance, and accommodating the temporary removal and reinstatement of rooftop equipment such as solar panels and mechanical systems. The project also includes replacement of select mechanical equipment, specifically an aging air conditioning unit and sump pump, along with associated electrical works required to support the roof replacement and equipment upgrades. The overall objective is to address ongoing roof leakage issues, extend the facility's service life, and improve long-term reliability and maintainability of the building.

    Nov 9, 2026 · 339 QUEENS QUAY W
  • Building permit26 142191Closed

    FIFA 3D SPECTACULAR FREESTANDING STRUCTURE - FIFA World Cup 2026 (no SP permit required)

    Apr 17, 2026 · 339 QUEENS QUAY W
  • Building permit26 109055Closed

    New structural platform to support a new transformer at 339 Queens Quay W.

    Mar 5, 2026 · 339 QUEENS QUAY W
  • By-law investigation25 157462 SIN 00 IRClosed

    Signs

    May 9, 2025 · 339 QUEENS QUAY W
  • Building permit23 118746Closed

    City of Toronto NCP # SR3787065442/ WS3790506297.Installation design of the residential washer & dryer, purchased by the Toronto Fire Services for FireHall in accordance with Provincial and City requirements.

    Mar 14, 2023 · 339 QUEENS QUAY W
  • Building permit22 201803Closed

    ERECT TEMPORARY STRUCTURE. START DATE SEP. 13, TEAR DOWN SEP. 21 2022.

    Sep 13, 2022 · 339 QUEENS QUAY W
  • Building permit18 173129Cancelled

    Proposal for a temporary structure. Temporary structure required by 21st June, 2018.

    Jun 6, 2018 · 339 QUEENS QUAY W
  • Building permit15 188737Closed

    Proposal to erect 1 20'x20' and 1 20'x40' certified tent at H2O park for the PAN AM Games (Panamania). Cert # 14 240256 CE. "Cuttin Style Caribbean Fashion Show" - July 15-July17/2015.

    Jul 10, 2015 · 339 QUEENS QUAY W
Show 15 older records
  • Building permit15 172752Closed

    install 1 temporary tent 20 x 40 frame tent, certified tent #15-159495 - June 17 to June 22

    Jun 17, 2015 · 339 QUEENS QUAY W
  • Building permit14 251640Closed

    To install a back flow prevention device to the fire hall 334 and ambulance station 36.

    Dec 8, 2014 · 339 QUEENS QUAY W
  • Building permit13 180653Closed

    Proposal to erect a temporary lighthouse structure (refer to 13-164023 TPS) for Nova Scotia Tourism on June 19th 2013 and to be taken down on June 24th 2013.

    Jun 12, 2013 · 339 QUEENS QUAY W
  • Building permit12 181097Closed

    Proposal to install 3 certified tents in a public park from June 14 to June 27, 2012. Tent 1 - 30' X304' (#11-167906), tent 2 - 20' X 96' (#11-167897), tent 3 - 30' X 80' (#11-167905).

    Jun 6, 2012 · 339 QUEENS QUAY W
  • Building permit09 144450Closed

    Proposal to install temperary tents from: June 2, 2009 to June 6, 2009. Removal of tents on June 15, 2009 to June 16, 2009 3-20'x30" tents (cert. # 05-194268) 3-20'x20' tents (cert. # 05-194283) HARBOUR FRONT (H20 PARK AND MUSIC GARDEN)

    Jun 5, 2009 · 339 QUEENS QUAY W
  • Building permit09 142858Closed

    Proposal for the erection of a stage, speaker towers and bleachers at HTO PARK EAST for "LUMINATO CIRQUE DU SOLEIL". The structures are to be erected on June 4th, 2009 and dismantled June 16th, 2009.

    Jun 5, 2009 · 339 QUEENS QUAY W
  • Zoning review07 182828 ZSVClosed
    Apr 30, 2007 · 339 QUEENS QUAY W
  • Building permit07 111336Closed - Dormant

    Install generator & solar panels on EMS/fire station rooftop.

    Mar 7, 2007 · 339 QUEENS QUAY W
  • Zoning review06 194819 ZPRClosed
    Nov 29, 2006 · 339 QUEENS QUAY W
  • Building permit99 015520Closed - Dormant

    SUPPLY AND INSTALL HVAC. REFER TO 418047 FOR PLANS.

    Apr 22, 1999 · 339 QUEENS QUAY W
  • Building permit98 022443Closed

    CONSTRUCT 2 STOREY FIRE HALL BUILDING 1211.43 SQ.METRESX$15.80=$19,140.59 HOLD FOR BY-LAW 23(THC) SS

    Apr 14, 1999 · 339 QUEENS QUAY W
  • Zoning review93 024672 LTOClosed
    Jan 25, 1993 · 339 QUEENS QUAY W
  • Zoning review92 025751 LTOClosed
    Jul 14, 1992 · 339 QUEENS QUAY W
  • Zoning review91 026366 LTOClosed
    Apr 23, 1991 · 339 QUEENS QUAY W
  • Zoning review90 028843 LTOClosed
    Sep 26, 1990 · 339 QUEENS QUAY W

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
13,220 m²
Frontage
120 m
Depth
122.1 m
Street
Queens Quay W
Corner lot
No
Public lane
None
House footprint
871 m²roof up to 28.5 m
Back yard
35.3 mhouse to rear lot line
Side yards
4.8 m and 90.2 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 14 City trees in front of this lot. The City's street tree inventory lists 14 trees at this address: planetree, london (12 cm), planetree, london (12 cm), planetree, london (12 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%2 of 2 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
2

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 2 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 493-2024) for the 21-storey mixed-use building (located at the northwest corner of the lot, municipally known as 396 Queens Quay West) by increasing the height of the mechanical penthouse, reducing the width of 32 parking spaces, and reducing the indoor amenity space (which will be used for storage space for outdoor furniture).

    350 QUEENS QUAY W · Jun 17, 2026 · 126 m away
  • Minor varianceApproved

    To convert the existing commercial space (located on the first floor lobby, and second levels of the building, municipally known as 350 Queens Quay West) into a hotel use, and to expand the permitted hotel use areas (on the second level of the building, municipally known as 390 Queens Quay West). Also, to alter the existing building municipally known as 396 Queens Quay West, by constructing a seventh level shaft on the roof area.

    350 QUEENS QUAY W · Apr 9, 2025 · 126 m away
  • Minor varianceApproved

    To permit the increase of gaming machines within the existing entertainment complex building (The Rec Room).

    255 BREMNER BLVD · Nov 22, 2023 · 493 m away
  • Minor varianceApproved

    To construct a new four-storey building for a "Flying Theatre", (known as Flyover Canada, a theatre simulator attraction) and ancillary retail uses.

    292 BREMNER BLVD · Jul 28, 2021 · 491 m away
  • Minor varianceApproved

    To convert a portion of the building (The Roundhouse) for the purposes of an entertainment complex containing the following uses: restaurants, tavern or public house and a pyublic hall games room including electronic game machines.

    255 BREMNER BLVD · Sep 13, 2016 · 493 m away

Latest activity nearby

  • Building permit

    Proposal for interior alterations to Cafe Bar Lobby, proposed hotel entrance awnings & refinishing existing cladding.

    249 QUEENS QUAY W · Nov 17, 2026 · 222 m away
  • Building permit

    Proposal to construct a new storage room within the P1 level garage area

    5 MARINER TER · Nov 10, 2026 · 291 m away
  • Building permit

    Fire Hall 334 - Assessment, design, and replacement of multiple roof systems, including the sloped PVC roof, upper roof, and lower roof terrace roofing systems. The work includes replacing aging roofing assemblies, improving waterproofing performance, and accommodating the temporary removal and reinstatement of rooftop equipment such as solar panels and mechanical systems. The project also includes replacement of select mechanical equipment, specifically an aging air conditioning unit and sump pump, along with associated electrical works required to support the roof replacement and equipment upgrades. The overall objective is to address ongoing roof leakage issues, extend the facility's service life, and improve long-term reliability and maintainability of the building.

    339 QUEENS QUAY W · Nov 9, 2026 · 36 m away
  • Building permit

    Replacement of existing FCU risers' expansion compensators, anchors, and guides. Total of 13 riser sets (supply and return) from the ground floor up to the 41st floor (37th level)

    5 MARINER TER · Oct 22, 2026 · 291 m away
  • Building permit

    REV01: Revisions to the washroom layout and mechanical drawings, including updated HRV location.Conversion of an existing empty shell into a daycare facility

    350 QUEENS QUAY W · Oct 5, 2026 · 126 m away
  • Building permit

    1 Wall Sign****RABBA FINE FOODS****

    250 A QUEENS QUAY W · Sep 11, 2026 · 296 m away
  • Building permit

    Rev 01- revision due to addition of fresh air which affects the life safety devices and spirnkler layoutProposal for interior alterations to new restaurant - Osmow's Restaurant

    350 QUEENS QUAY W · Jul 20, 2026 · 126 m away
  • Zoning review

    Closed

    390 QUEENS QUAY W · Jul 14, 2026 · 174 m away
  • Building permit

    PROPOSED CONCRETE REPAIRS TO THE PARKING GARAGE FLOORS

    249 QUEENS QUAY W · Jun 22, 2026 · 222 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 493-2024) for the 21-storey mixed-use building (located at the northwest corner of the lot, municipally known as 396 Queens Quay West) by increasing the height of the mechanical penthouse, reducing the width of 32 parking spaces, and reducing the indoor amenity space (which will be used for storage space for outdoor furniture).

    350 QUEENS QUAY W · Jun 17, 2026 · 126 m away

Neighbourhood: Harbourfront-CityPlace

About the area around the lot, not the lot itself.

Nearest station
Queens Quay/Ferry Docks Station16 min walk
Nearest TTC stop
Queens Quay West at Rees St West Side2 min walk
Nearest cycling route
Martin Goodman / Waterfront TrlMulti-Use Trail - Boulevard, 1 min walk
Nearest traffic count
7,022 vehicles in 8 hQueens Quay W: Rees St - Lower Spadina Ave, 100 m away, Apr 22, 2008
Serious collisions within 500 m
52021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 1 with cyclists
Parks
Hto Park1 min walk
Toronto Waterfront Park1 min walk
Peter Street Basin Park2 min walk

Schools within 1 km

  • JEAN LUMB PUBLIC SCHOOL English Public 8 min walk
  • BISHOP MACDONELL CATHOLIC ELEMENTARY English Separate 8 min walk
  • CITY SCHOOL English Public 12 min walk
  • THE WATERFRONT SCHOOL English Public 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureHarbourfront-CityPlaceMedian neighbourhood
Median household income (2020)$90,000$84,500
Households that own their home40%54%
Population (2021)28,13516,813
Homes built in 1960 or before0%29%
Homes needing major repairs2%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleHarbourfront-CityPlaceCity median
Assault883.3636.3
Robbery48.169.5
Homicide2.85.3
Shootings8.510.5
Auto theft56.6192.6
Theft over $5,00056.646.1
Break and enter141.6172.8
Theft from vehicles121.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.