Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 339 College St
339 College St is on a 28.1 m by 33.1 m lot on Augusta Ave in Kensington-Chinatown. The zoning is CR. A site-specific exception, 900.11.10(2363), changes some of the usual rules for this address. The lot also fronts College St.
The City has 22 records on this lot since 1982. That is more than at 99% of Toronto houses. In 2025, a development application was filed: "A 20-storey privately-owned student residence building containing 17,649 square metres of residential gross floor area and 60 square metres of retail gross…". Status: closed. In 2025, a development application was filed: "Proposed 19-storey mixed-use building containg 746 rooms, proposal contains 18, 404sqm of residential gfa, and 38sqm of non-residential gfa". Status: closed. In 2017, a building permit was filed: "Revison 01: revised ceiling constructionproposal to expand the existing retail store (pet value) into the adjoining retail space creating 1 retail unit with…". Status: closed. Nothing on file is open right now.
Within 300 m, 3 development applications are open. Within 300 m, the Committee of Adjustment decided 47 minor variance applications in the last 10 years and approved 89%. The nearest TTC stop is College St at Augusta Ave, a 1-minute walk.
Summary
What the City's records show on this house
- Site-specific exception 900.11.10(2363)Moderate
- 1 by-law investigation closed in the last two yearsLow
- 3 development applications open within 300 mLowFree check
- Priority retail street: Augusta Avenue, College StreetLow
- Site and Area Specific Policy 533Low
- Downtown Plan Secondary PlanLow
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- 1 by-law investigation closed in the last two years
- No open orders or by-law investigations
- No permits left open for years
What this part means for this house, in plain EnglishUnlock
1 by-law investigation closed in the last two years
LowCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
City files on this lot
22 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-04-15 | By-law investigation26 144501 GRA 00 IR | Graffiti | Closed | |
| 2026-04-04 | By-law investigation26 149628 GRA 00 IV | Notice Issued Graffiti | Closed | |
| 2026-04-04 | By-law investigation26 138894 GRA 00 IR | Graffiti | Closed | |
| 2025-12-23 | Development application25 269341 STE 11 SA | A 20-storey privately-owned student residence building containing 17,649 square metres of residential gross floor area and 60 square metres of retail gross floor area at grade. | Closed | |
| 2025-09-22 | By-law investigation25 229138 PRS 00 IR | Property Standards | Closed | |
| 2025-08-21 | Development application25 214214 STE 11 OZ | Proposed 19-storey mixed-use building containg 746 rooms, Proposal contains 18, 404sqm of residential GFA, and 38sqm of non-residential GFA. | Closed | |
| 2025-03-03 | By-law investigation25 124137 GRA 00 IR | Graffiti | Closed | |
| 2017-06-19 | Building permit17 146773 | Revison 01: REVISED CEILING CONSTRUCTIONProposal to expand the existing retail store (Pet Value) into the adjoining retail space creating 1 retail unit with new pet grooming station. | Closed | |
| 2017-03-17 | Zoning review17 130425 ZPR | No description on file | Closed | |
| 2015-05-14 | Zoning review15 157031 LPR | No description on file | Closed | |
| 2014-11-18 | Development application14 253221 STE 20 OZ | Proposal to replace the existing automotive rental facility and non-residential building with a 13 -storey mixed use redevelopment with retail at grade and residential dwelling units above. The proposal has been revised and no longer includes the property located at 303 Augusta Avenue. | Closed | |
| 2005-10-21 | Zoning review05 195890 LTO | No description on file | Closed | |
| 2002-07-26 | Zoning review02 158349 LTO | No description on file | Closed | |
| 2002-07-25 | Building permit02 151681 | Make interior alteration to existing restaurant ( new tenant)----Health dept. approval required | Closed | |
| 1995-03-02 | Zoning review95 024731 LTO | No description on file | Closed | |
| 1994-09-08 | Zoning review94 025328 LTO | No description on file | Closed | |
| 1992-01-15 | Zoning review92 025071 LTO | No description on file | Closed | |
| 1989-05-12 | Zoning review89 030002 LTO | No description on file | Closed | |
| 1982-10-21 | Zoning review82 026559 LTO | No description on file | Closed | |
| 1982-08-24 | Zoning review82 026382 LTO | No description on file | Closed | |
| 1982-08-12 | Zoning review82 026365 LTO | No description on file | Closed | |
| 1982-05-14 | Zoning review82 026047 LTO | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.11.10(2363)
- Priority retail street: Augusta Avenue, College Street
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.11.10(2363)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Priority retail street: Augusta Avenue, College Street
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Site and Area Specific Policy 533
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Downtown Plan Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(2363)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 3.0 (c2.0; r2.5) SS2 (x2363)
- Height limit
- 16 m
- Corner lot
- Yes, also on College St
- Public lane
- None
- House footprint
- 599 m²
- Back yard
- 0 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 3 development applications open within 300 m
- 16 suite and multiplex permits within 300 m in 10 years
- 47 minor variance decisions within 300 m, 89% approved
What this part means for this house, in plain EnglishUnlock
3 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 1 of 7 categories
- Theft over $5,000: 4.8 times the Toronto median
- Theft from vehicles: 4.5 times the Toronto median
- Assault: 3.2 times the Toronto median
- Robbery: 2.8 times the Toronto median
- Break and enter: 2.6 times the Toronto median
- Shootings: 2.1 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Kensington-Chinatown neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Queen's Park StationNearest station16 min walk
- College St at Augusta AveNearest TTC stop1 min walk
- College StNearest cycling route1 min walk
- Westside Montessori Elementary SchoolSchool2 min walk
- Lord Lansdowne Jr Sr & Da VinciSchool3 min walk
- Kensington Community SchoolSchool4 min walk
- King Edward Jr & Sr Public SchoolSchool6 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.32017.5
- Robberycity median 69.5193
- Shootingscity median 10.521.9
- Auto theftcity median 192.6118.4
- Theft over $5,000city median 46.1219.3
- Break and entercity median 172.8443
- Theft from vehiclescity median 188.1850.8
Ready emails
Copy and send as they are.
1 question for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist