HousePrecheckCheck an address

339 Alton Towers CrclToronto · zoning, lot size and permit records

≈ 208.7 × 151.5 m19,104 m²on Alton Towers Crcl

Not a home

Ecole Elementaire Laure Riese

The City's school locations place Ecole Elementaire Laure Riese on this parcel. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A school next doorDrop-off traffic around 8 to 9 am and 3 to 4 pm on school days, children walking; a short walk for a family.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
≈ 208.7 m frontage≈ 151.5 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    4 records on file: more than at 88% of Toronto houses (median 0).

    • Building permit18 156438Cancelled

      Proposal to convert one existing classroom into a child care room for infants.

      Aug 16, 2018 · 339 ALTON TOWERS CRCL
    • Building permit13 184830Closed

      To erect and display one illuminated ground sign. **Ecole Elementaire Laure-Riese**

      Sep 5, 2013 · 339 ALTON TOWERS CRCL
    • Zoning review13 141208 ZZUClosed
      Mar 27, 2013 · 339 ALTON TOWERS CRCL
    • Development application10 230629 ESC 41 SAClosed

      Site plan control application to construct a new elementary school.

      Jul 29, 2010 · 339 ALTON TOWERS CRCL

    Check before you build

    • Zoning not in By-law 569-2013

      Needs a closer look

      This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

      Zoning By-law 569-2013

    Lot facts

    Area
    19,104 m²
    Frontage
    208.7 mestimated, irregular lot
    Depth
    151.5 mestimated, irregular lot
    Street
    Alton Towers Crcl
    Corner lot
    No
    Public lane
    None
    House footprint
    3,531 m²roof up to 10.8 m
    Back yard
    27.6 mhouse to rear lot line
    Side yards
    52.2 m and 71.7 mhouse to side lot lines
    Buildings on the lot
    1house, garage, sheds
    Max height
    —
    Max lot coverage
    —

    House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    • 7 City trees in front of this lot. The City's street tree inventory lists 7 trees at this address: elm, american valley forge (8 cm), maple, freeman celebration (8 cm), linden, littleleaf (7 cm). Diameter is the trunk at breast height. Source

    Around this lot

    Minor variances approved
    —no decisions on file
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    0

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To permit a free-standing, drive-through restaurant at the northeast corner of the Milliken Wells Shopping Centre.

      240 ALTON TOWERS CRCL · Jul 13, 2017 · 428 m away
    • Minor varianceApproved

      The applicant proposes to construct an addition to house a choir area on the east side of the existing Church of the Prince of Peace. In 1986 and 1996, the Committee approved variances for reduced rates of parking and allowed 92 parking spaces on-site. A lease agreement exists between the Church and the adjacent Separate School site for an additional 30 spaces.

      265 ALTON TOWERS CRCL · Aug 22, 2007 · 274 m away
    • Minor varianceApproved

      14 Townhouse units to be sold as Freehold Condominium whereby creating 14 individual lots that will not be in compliance with the By-law.

      3358-3360 MCCOWAN RD · Dec 17, 2003 · 323 m away
    • Minor varianceRefused

      Addition of partially enclosed 15' x 15' roofed deck.

      40 DANILACK CRT · Sep 17, 2003 · 287 m away
    • Minor varianceApproved

      REDUCTION IN REAR YARD SETBACK TO 5.85M WHEREAS THE BYLAW REQUIRES 7M.

      10 GOLDHAWK TRL · Feb 6, 2002 · 137 m away

    Latest activity nearby

    • Building permitsecondary suite

      Proposed ground floor interiro alterations adn second unit in basement

      46 ALVIN CURLING CRES · Jul 30, 2025 · 124 m away
    • Building permitsecondary suite

      Proposed secondary suite in basement and walk out stairs to an existing dwelling

      397 ALTON TOWERS CRCL · Aug 29, 2023 · 267 m away
    • Building permit

      Proposal for localized waterproofing and concrete repairs to the underground parking garage roof slab and associated asphalt pavement replacement in an existing apartment building.

      350 ALTON TOWERS CRCL · May 31, 2023 · 217 m away
    • Zoning review

      Closed

      250 ALTON TOWERS CRCL · Apr 26, 2022 · 299 m away
    • Building permit

      Localized concrete and waterproofing to parking garage

      330 ALTON TOWERS CRCL · Dec 13, 2021 · 173 m away
    • Building permit

      Proposed interior alterations in mercantile office - Unit AA2

      250 ALTON TOWERS CRCL · Feb 28, 2020 · 299 m away
    • Building permit

      Proposal to convert one existing classroom into a child care room for infants.

      339 ALTON TOWERS CRCL · Aug 16, 2018 · 14 m away
    • Building permit

      Proposal to install rooftop solar panels

      59 DANILACK CRT · Aug 15, 2017 · 236 m away
    • Building permit

      To erect and display signs.**Toronto Public Library****Goldhawk Park**

      295 ALTON TOWERS CRCL · Mar 28, 2017 · 193 m away
    • Zoning review

      Closed

      250 ALTON TOWERS CRCL · Jan 31, 2017 · 299 m away

    Neighbourhood: Milliken

    About the area around the lot, not the lot itself.

    Nearest TTC stop
    McCowan Rd at Alton Towers Cir (South)4 min walk
    Nearest cycling route
    Milliken Park TrlMulti-Use Trail - Existing Connector, 9 min walk
    Nearest traffic count
    2,978 vehicles in 8 hAlton Towers Crcl / Goldhawk Trl (South), 160 m away, Oct 7, 2021
    Serious collisions within 500 m
    22021–2026, killed or seriously injured: 2 fatal, 0 with pedestrians, 0 with cyclists
    Parks
    Goldhawk Park1 min walk
    Milliken Park9 min walk
    Muirlands Park10 min walk

    Schools within 1 km

    • ECOLE ELEMENTAIRE LAURE RIESE French Public 1 min walk
    • PRINCE OF PEACE CATHOLIC ELEMENTARY SCHOOL English Separate 6 min walk
    • AGNES MACPHAIL PUBLIC SCHOOL English Public 6 min walk
    • BANTING AND BEST PUBLIC SCHOOL English Public 9 min walk
    • THE DIVINE INFANT CATHOLIC ELEMENTARY SCHOOL & MSGR FRASIER NORTHEAST English Separate 10 min walk
    • MACKLIN PUBLIC SCHOOL English Public 13 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureMillikenMedian neighbourhood
    Median household income (2020)$81,000$84,500
    Households that own their home88%54%
    Population (2021)23,98016,813
    Homes built in 1960 or before2%29%
    Homes needing major repairs4%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleMillikenCity median
    Assault334.2636.3
    Robbery197.569.5
    Shootings1910.5
    Auto theft607.7192.6
    Theft over $5,000125.346.1
    Break and enter254.5172.8
    Theft from vehicles398.8188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 29, 2026, published Nov 27, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
    • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
    • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
    • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
    • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
    • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
    • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
    • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
    • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
    • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.