HousePrecheckCheck an address

336 Yonge StYonge-Bay Corridor, Toronto · City records before you offer

Commercial residential · CR 4.0 (c4.0; r1.5) SS1 (x2553)7.1 × 61.6 m436 m²on Yonge Stbacks onto Harry Barberian Lane

Nothing to check before you offer in the City's records
N20 m
7.1 m frontage61.6 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 336 Yonge St

336 Yonge St is on a 7.1 m by 61.6 m lot on Yonge St in Yonge-Bay Corridor. The zoning is CR. A site-specific exception, 900.11.10(2553), changes some of the usual rules for this address.

The City has 14 records on this lot since 1997. That is more than at 99% of Toronto houses. In 2025, a building permit was filed: "1 wall sign". Status: closed. In 2019, a building permit was filed: "To erect and display one illuminated projecting sign, displaying static copy. erected on the east elevation of the building. measuring 0.99 m vertically by…". Status: closed. In 2018, a building permit was filed: "Hvac - proposal for a new patio with a bar restaurant on yonge street - see file 17 144245 ba". Status: closed. Nothing on file is open right now.

Within 300 m, 19 development applications are open (the tallest up to 85 storeys). Within 300 m, the Committee of Adjustment decided 13 minor variance applications in the last 10 years and approved 92%. TMU station is a 2-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • Site-specific exception 900.11.10(2553)Moderate
  • 2 by-law investigations closed in the last two yearsLow
  • 19 development applications open within 300 mLowFree check
  • Priority retail street: Yonge StreetLow
  • Site and Area Specific Policy 174Low
  • Downtown Plan Secondary PlanLow

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

A few questions

Open City files

How much in the City's records needs answers before an offer

  • 2 by-law investigations closed in the last two years
  • No open orders or by-law investigations
  • No permits left open for years

What this part means for this house, in plain EnglishUnlock

  1. 2 by-law investigations closed in the last two years

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

City files on this lot

14 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2025-09-18Building permit
25 127124
1 Wall SignClosed
2025-06-26Zoning review
25 184234 ZSV
No description on fileClosed
2025-05-13By-law investigation
25 159428 PRS 00 IV
Order Issued Property Standards: The (stairs, treads, risers, guards, handrails, and/or other appurtenant attachments) and/or their supporting structural members are not being maintained free fClosed
2025-05-13By-law investigation
25 158558 PRS 00 IR
Property StandardsClosed
2025-04-22Zoning review
25 147167 ZPR
No description on fileClosed
2025-04-16Zoning review
25 145942 ZPR
No description on fileCancelled
2019-05-09Building permit
19 129303
To erect and display one illuminated projecting sign, displaying static copy. Erected on the east elevation of the building. Measuring 0.99 m vertically by 0.99 m horizontally at the height of 4.19m.**ROOFTOP PATIO**Closed
2018-06-13Zoning review
18 177375 ZPR
No description on fileClosed
2018-05-31Building permit
18 137885
HVAC - Proposal for a new Patio with a Bar restaurant on Yonge Street - See file 17 144245 BAClosed
2018-04-05Building permit
18 130385
In conjunction with a two storey building on the premises, proposal to erect and display one illuminated projecting sign and one non-illuminated wall sign, both displaying static copy, located on the first storey of the east elevation. The proposed projecting sign contains two sign faces, in a back-to-back orientation, each sign face measuring 0.61 metres vertically by 0.61 metres horizontally at a height of 3.12 metres. The proposed wall sign contains three sign faces, one of which is 0.61 metres vertically by 1.88 metres horizontally and the other two are 0.61 metres vertically by 0.46 metres horizontally.**WAREHOUSE**Closed
2018-03-09Building permit
17 277528
In conjunction with a two storey building on the premises, proposal to erect and display one illuminated wall sign, displaying static copy, located on the first storey east elevation. The proposed sign is 0.99 metres vertically by 3.33 metres horizontally at a height of 4.19 metres above grade.**YONGE ST WAREHOUSE**Closed
2017-12-19Building permit
17 144245
Revision 01 - Revised floor plans as per bubbled drawings.HVAC - includes a kitchen exhaustProposal for interior alterations to convert existing 2 storey retail building to a restaurant, greater than 30 seats.Closed
2016-10-17Zoning review
16 237960 LTO
No description on fileClosed
1997-05-02Building permit
97 015806
MAKE INTERIOR ALTERTIONS TO EXISTING RETAIL STORE ON 1ST FLOOR AND 2ND FLOOR. TENANT: SUNRISE RECORDS. EDCClosed
Minor

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.11.10(2553)
  • Priority retail street: Yonge Street
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.11.10(2553)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. Priority retail street: Yonge Street

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  3. Site and Area Specific Policy 174

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  4. Downtown Plan Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.11.10(2553)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N20 m
7.1 m frontage61.6 m deepon Yonge St
Zone
CR 4.0 (c4.0; r1.5) SS1 (x2553)
Height limit
20 m
Corner lot
No
Public lane
Harry Barberian Lane, 7.1 m along it
House footprint
149 m²
Back yard
0 m
Buildings on the lot
3

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Busy

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 19 development applications open within 300 m, up to 85 storeys
    • In the College station area
    • 13 minor variance decisions within 300 m, 92% approved

    What this part means for this house, in plain EnglishUnlock

    1. 19 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime well above median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 1 of 8 categories
    • Assault: 5.3 times the Toronto median
    • Theft over $5,000: 4.6 times the Toronto median
    • Robbery: 4.3 times the Toronto median
    • Break and enter: 3.2 times the Toronto median
    • Homicide: 2.3 times the Toronto median
    • Theft from vehicles: 2.1 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Yonge-Bay Corridor neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$68,500median $84,500
    Households that own their home32%median 54%
    Population (2021)12,645median 16,813
    Homes built in 1960 or before2%median 29%
    Homes needing major repairs2%median 7%

    Getting around and schools

    • TMU StationNearest station2 min walk
    • Yonge St at Gould StNearest TTC stop1 min walk
    • Gerrard St WNearest cycling route3 min walk
    • Tmu - Heaslip HouseSchool3 min walk
    • Toronto Metropolitan University - Entr To Business School LobbySchool3 min walk
    • Toronto Metropolitan University - School of Image ArtsSchool4 min walk
    • Tmu - Heidelberg Centre School of Graphic Comm'ns MgmtSchool4 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.33361.1
    • Robberycity median 69.5300.1
    • Homicidecity median 5.312
    • Shootingscity median 10.512
    • Auto theftcity median 192.6162.1
    • Theft over $5,000city median 46.1210.1
    • Break and entercity median 172.8552.2
    • Theft from vehiclescity median 188.1402.1

    More about Yonge-Bay Corridor

    Ready emails

    Copy and send as they are.

    1 question for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 336 Yonge St

    Nothing in the City's records needs answers before an offer on 336 Yonge St

    The report lists the 15 record sets we checked and shows what the City allowed next door. You get it as a PDF for your agent and lawyer, and we watch the address for 90 days.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.