Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 336 Yonge St
336 Yonge St is on a 7.1 m by 61.6 m lot on Yonge St in Yonge-Bay Corridor. The zoning is CR. A site-specific exception, 900.11.10(2553), changes some of the usual rules for this address.
The City has 14 records on this lot since 1997. That is more than at 99% of Toronto houses. In 2025, a building permit was filed: "1 wall sign". Status: closed. In 2019, a building permit was filed: "To erect and display one illuminated projecting sign, displaying static copy. erected on the east elevation of the building. measuring 0.99 m vertically by…". Status: closed. In 2018, a building permit was filed: "Hvac - proposal for a new patio with a bar restaurant on yonge street - see file 17 144245 ba". Status: closed. Nothing on file is open right now.
Within 300 m, 19 development applications are open (the tallest up to 85 storeys). Within 300 m, the Committee of Adjustment decided 13 minor variance applications in the last 10 years and approved 92%. TMU station is a 2-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Site-specific exception 900.11.10(2553)Moderate
- 2 by-law investigations closed in the last two yearsLow
- 19 development applications open within 300 mLowFree check
- Priority retail street: Yonge StreetLow
- Site and Area Specific Policy 174Low
- Downtown Plan Secondary PlanLow
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- 2 by-law investigations closed in the last two years
- No open orders or by-law investigations
- No permits left open for years
What this part means for this house, in plain EnglishUnlock
2 by-law investigations closed in the last two years
LowCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
City files on this lot
14 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2025-09-18 | Building permit25 127124 | 1 Wall Sign | Closed | |
| 2025-06-26 | Zoning review25 184234 ZSV | No description on file | Closed | |
| 2025-05-13 | By-law investigation25 159428 PRS 00 IV | Order Issued Property Standards: The (stairs, treads, risers, guards, handrails, and/or other appurtenant attachments) and/or their supporting structural members are not being maintained free f | Closed | |
| 2025-05-13 | By-law investigation25 158558 PRS 00 IR | Property Standards | Closed | |
| 2025-04-22 | Zoning review25 147167 ZPR | No description on file | Closed | |
| 2025-04-16 | Zoning review25 145942 ZPR | No description on file | Cancelled | |
| 2019-05-09 | Building permit19 129303 | To erect and display one illuminated projecting sign, displaying static copy. Erected on the east elevation of the building. Measuring 0.99 m vertically by 0.99 m horizontally at the height of 4.19m.**ROOFTOP PATIO** | Closed | |
| 2018-06-13 | Zoning review18 177375 ZPR | No description on file | Closed | |
| 2018-05-31 | Building permit18 137885 | HVAC - Proposal for a new Patio with a Bar restaurant on Yonge Street - See file 17 144245 BA | Closed | |
| 2018-04-05 | Building permit18 130385 | In conjunction with a two storey building on the premises, proposal to erect and display one illuminated projecting sign and one non-illuminated wall sign, both displaying static copy, located on the first storey of the east elevation. The proposed projecting sign contains two sign faces, in a back-to-back orientation, each sign face measuring 0.61 metres vertically by 0.61 metres horizontally at a height of 3.12 metres. The proposed wall sign contains three sign faces, one of which is 0.61 metres vertically by 1.88 metres horizontally and the other two are 0.61 metres vertically by 0.46 metres horizontally.**WAREHOUSE** | Closed | |
| 2018-03-09 | Building permit17 277528 | In conjunction with a two storey building on the premises, proposal to erect and display one illuminated wall sign, displaying static copy, located on the first storey east elevation. The proposed sign is 0.99 metres vertically by 3.33 metres horizontally at a height of 4.19 metres above grade.**YONGE ST WAREHOUSE** | Closed | |
| 2017-12-19 | Building permit17 144245 | Revision 01 - Revised floor plans as per bubbled drawings.HVAC - includes a kitchen exhaustProposal for interior alterations to convert existing 2 storey retail building to a restaurant, greater than 30 seats. | Closed | |
| 2016-10-17 | Zoning review16 237960 LTO | No description on file | Closed | |
| 1997-05-02 | Building permit97 015806 | MAKE INTERIOR ALTERTIONS TO EXISTING RETAIL STORE ON 1ST FLOOR AND 2ND FLOOR. TENANT: SUNRISE RECORDS. EDC | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.11.10(2553)
- Priority retail street: Yonge Street
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.11.10(2553)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Priority retail street: Yonge Street
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Site and Area Specific Policy 174
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Downtown Plan Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(2553)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 4.0 (c4.0; r1.5) SS1 (x2553)
- Height limit
- 20 m
- Corner lot
- No
- Public lane
- Harry Barberian Lane, 7.1 m along it
- House footprint
- 149 m²
- Back yard
- 0 m
- Buildings on the lot
- 3
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 19 development applications open within 300 m, up to 85 storeys
- In the College station area
- 13 minor variance decisions within 300 m, 92% approved
What this part means for this house, in plain EnglishUnlock
19 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 1 of 8 categories
- Assault: 5.3 times the Toronto median
- Theft over $5,000: 4.6 times the Toronto median
- Robbery: 4.3 times the Toronto median
- Break and enter: 3.2 times the Toronto median
- Homicide: 2.3 times the Toronto median
- Theft from vehicles: 2.1 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Yonge-Bay Corridor neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- TMU StationNearest station2 min walk
- Yonge St at Gould StNearest TTC stop1 min walk
- Gerrard St WNearest cycling route3 min walk
- Tmu - Heaslip HouseSchool3 min walk
- Toronto Metropolitan University - Entr To Business School LobbySchool3 min walk
- Toronto Metropolitan University - School of Image ArtsSchool4 min walk
- Tmu - Heidelberg Centre School of Graphic Comm'ns MgmtSchool4 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.33361.1
- Robberycity median 69.5300.1
- Homicidecity median 5.312
- Shootingscity median 10.512
- Auto theftcity median 192.6162.1
- Theft over $5,000city median 46.1210.1
- Break and entercity median 172.8552.2
- Theft from vehiclescity median 188.1402.1
Ready emails
Copy and send as they are.
1 question for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist