HousePrecheckCheck an address

3345 St Clair Ave EToronto · zoning, lot size and permit records

UT≈ 18.8 × 92.0 m1,070 m²on St Clair Ave E

Not a home

Warden Station Commuter Parking Lot

The City of Toronto's real estate inventory lists Warden Station Commuter Parking Lot here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Transit, rail or parkingGood access, with trains, buses or cars and some noise.
  • Permits or applications open on this parcelRecent records on this lot: 21 180550 ESC 20 OZ (OLT settlement which contemplates a mixed residential/retail development of five buildi..., 2021). Larger work can mean noise and trucks next door; read what each one is for.
  • 5 development applications open within 300 m, up to 23 storeysNew buildings may go up around here in the next years. More change nearby than at 88% of Toronto houses.
  • Major Transit Station Area: Warden (Subway)The City plans more homes around the station: good for transit, and more building over time.
N50 m
≈ 18.8 m frontage≈ 92.0 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Ravine and natural feature protection (39% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Natural Heritage System (65% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • Work or applications in progress

    Good to know

    Recent records on this lot: 21 180550 ESC 20 OZ (OLT settlement which contemplates a mixed residential/retail development of five buildi..., 2021).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 5 development applications open within 300 m

    Good to know

    5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 23 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

1 records on file: more than at 53% of Toronto houses (median 0).

  • Development application21 180550 ESC 20 OZOMB Approved

    OLT settlement which contemplates a mixed residential/retail development of five buildings, ranging in height from 17-storeys (with a six-storey mid-rise component) to 49-storeys, with approximately 2,100 dwelling units including a unit mix of 15% two-bedroom units and 10% three-bedroom units. A total of approximately 130,260 sq m of Gross Floor Area (GFA) is proposed, inclusive of 985 sq m of non-residential GFA, resulting in a gross density of 4.95 Floor Space index (FSI). This will be supported by a series of new public streets connecting Warden Avenue and Pilkington Drive and a 2,015 sq m public park located towards the east side of the site.See related Subdivision Application 21 181162 ESC 20 SB.

    Jul 6, 2021 · 3345 ST CLAIR AVE E · City file

Lot facts

Area
1,070 m²
Frontage
18.8 mestimated, irregular lot
Depth
92 mestimated, irregular lot
Street
St Clair Ave E
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—
  • Major Transit Station Area: Warden (Subway). The lot is inside the Warden (Subway) Major Transit Station Area approved by the Province (Site and Area Specific Policy 648). Source
  • Warden Woods Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone UT (Utility and Transportation). Chapter 100, section 100.10 of the by-law. Source
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: kentucky coffeetree (4 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
67%2 of 3 decisions
Garden suite permits
2
Laneway suite permits
0
Multiplex permits
0
Development applications
6

Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 3 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    To construct an accessible ramp to existing school - St. Joachim Catholic School

    3395 ST CLAIR AVE E · Nov 13, 2026 · 283 m away
  • Building permit

    Proposal for Cable Duct bank replacement and New Service Stair Addition.

    701 WARDEN AVE · Jul 6, 2026 · 105 m away
  • Zoning review

    Application Acceptable

    190 SANTAMONICA BLVD · Apr 20, 2026 · 84 m away
  • Building permit

    Proposed installation of a 4.38 m x 2.65 m (14'4" x 8'8") open-air aluminum louvered pergola in the rear yard of an existing detached single-family dwelling.

    190 SANTAMONICA BLVD · Apr 14, 2026 · 84 m away
  • Building permitsecondary suite

    Proposed interior alteration of the existing basement to a secondary suite. Scope includes interior layout changes and enlargement of three existing windows;

    10 CLAPPERTON AVE · Jan 26, 2026 · 281 m away
  • Building permitsecondary suite

    Proposed interior alteration of the existing basement to a secondary suite. Scope includes interior layout changes and enlargement of two existing windows;

    10 CLAPPERTON AVE · Jan 8, 2026 · 281 m away
  • Building permit

    Interior alterations for new vestibule and foreman office, and AC unit on roof

    701 WARDEN AVE · Dec 15, 2025 · 105 m away
  • Building permit

    REV 01: Major modifications to HVAC and Plumbing Locations and Routing, Updated fire separation details and locationsPart of AODA compliances and TTC's easier access-III program, partial demolition at the southern end of PPUDO driveway, addition of new south entrance block with elevator. Facade treatment to impacted building exteriors. Partial demolition of walls & staff washroom at concourse level, slab cut out at the platform level. Installation of new elevator connecting concourse & subway platform. Alteration to service rooms with new barrier free staff washroom, elevator machine room & power upgrades.

    701 WARDEN AVE · Nov 21, 2025 · 105 m away
  • Building permit

    Provide a split air-conditioning system for radio shop 15D-83 in existing Transit Station

    701 WARDEN AVE · Dec 6, 2024 · 105 m away
  • Building permit

    Proposal to enclose the existing front covered porch

    171 SANTAMONICA BLVD · Nov 19, 2024 · 184 m away

Neighbourhood: Clairlea-Birchmount

About the area around the lot, not the lot itself.

Nearest station
Warden Station1 min walk
Nearest TTC stop
Warden Station - Eastbound Platform1 min walk
Nearest cycling route
Taylor Creek TrlMulti-Use Trail, 1 min walk
Nearest traffic count
33,921 vehicles in 14 hSt Clair Ave E / Warden Ave, 190 m away, Nov 10, 2024
Serious collisions within 500 m
32021–2026, killed or seriously injured: 2 fatal, 0 with pedestrians, 1 with cyclists
Parks
St. Clair Ravine2 min walk
Warden Woods Park3 min walk
Warden Hilltop Community Centre Park4 min walk

Schools within 1 km

  • ST JOACHIM CATHOLIC ELEMENTARY SCHOOL English Separate 5 min walk
  • DANFORTH GARDENS PUBLIC SCHOOL English Public 12 min walk
  • GENERAL BROCK PUBLIC SCHOOL English Public 13 min walk
  • SATEC AT W A PORTER COLLEGIATE INSTITUTE English Public 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureClairlea-BirchmountMedian neighbourhood
Median household income (2020)$90,000$84,500
Households that own their home64%54%
Population (2021)26,84016,813
Homes built in 1960 or before39%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleClairlea-BirchmountCity median
Assault1303.8636.3
Robbery4969.5
Shootings9.810.5
Auto theft287.6192.6
Theft over $5,0008546.1
Break and enter189.5172.8
Theft from vehicles290.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.