HousePrecheckCheck an address

334 Greenwood AveToronto · zoning, lot size and permit records

Employment · EL 2.0≈ 59.6 × 12.1 m455 m²on Greenwood Ave

Not a home

Vacant Land

The City of Toronto's real estate inventory lists Vacant Land here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • City of Toronto landThe City decides what happens here; ask it about any plans.
N20 m
≈ 59.6 m frontage≈ 12.1 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    No permits, applications or Committee of Adjustment files on this lot in the City's open records.

    Lot facts

    Area
    455 m²
    Frontage
    59.6 mestimated, irregular lot
    Depth
    12.1 mestimated, irregular lot
    Street
    Greenwood Ave
    Corner lot
    No
    Public lane
    None
    Max height
    14 m
    Max lot coverage
    —
    • Zone EL 2.0 (Employment Light Industrial). Chapter 60, section 60.10 of the by-law. Source

    Around this lot

    Minor variances approved
    95%21 of 22 decisions
    Garden suite permits
    1
    Laneway suite permits
    5
    Multiplex permits
    13
    Development applications
    1

    Within 300 m, last 10 years. 19 suite and multiplex permits: more than at 87% of Toronto houses (median 3). 22 variance decisions: more than at 53% of Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To convert the one-storey industrial building into a brewery.

      36 WAGSTAFF DR · Jan 28, 2015 · 102 m away

    Latest activity nearby

    • Minor variancePending

      To alter the existing two-and-one-half-storey semi-detached dwelling by demolishing the existing front porch and constructing a new one-storey enclosed front porch addition (mudroom) with stairs.

      274 GREENWOOD AVE · Dec 16, 2026 · 154 m away
    • Minor variancePending

      To permit and maintain the existing building height, and rear (east) covered ground floor deck with stairs and canopy (abutting the laneway) of the existing rear two-storey ancillary building (laneway suite) which was constructed beyond the limits of the approved building permit (20 26 116622 BLD 00 SR). There will be a total of five residential dwelling units on this lot (four units occupying the main dwelling, and one unit occupying the ancillary building).

      343 GREENWOOD AVE · Nov 25, 2026 · 115 m away
    • Building permit

      Proposal for structural rehabilitation of the Hostler Platform at Greenwood Yard. Note that a hostler platform is a platform that is used only by internal TTC forces to access subway trains.

      400 GREENWOOD AVE · Nov 20, 2026 · 201 m away
    • Building permitmultiplex

      REVISION - removal of the mezzanine levelProposal for 3 storey Rear addition to existing 2 storey single family semi detached, and convert to triplex, underpin of existing footing

      316 HIGHFIELD RD · Nov 16, 2026 · 296 m away
    • Building permit

      Party wall administrative permit related to work at 132 Ivy Ave (26 220856 BLD 00 SR).

      134 IVY AVE · Nov 10, 2026 · 113 m away
    • Zoning review

      Not Started

      254 GREENWOOD AVE · Nov 5, 2026 · 226 m away
    • Building permitmultiplex

      New deck landing and door for second entry to main floor

      254 GREENWOOD AVE · Nov 5, 2026 · 226 m away
    • Building permit

      Revision-01Proposed 2-Storey Rear Addition, Interior Alterations and new Rear Deck to an existing 2-Storey Single-Family Dwelling

      75 REDWOOD AVE · Oct 29, 2026 · 201 m away
    • Building permit

      Proposal for interior alterations (replacement of pump pit access hatch, localized concrete repairs, alterations and installation of pit ladders and pump control rework).

      400 GREENWOOD AVE · Oct 28, 2026 · 201 m away
    • Building permit

      Proposed replacement of the existing 3T bridge crane with a new 10T bridge crane addition within the TTC train maintenance facility, and all associated mechanical work.

      400 GREENWOOD AVE · Oct 27, 2026 · 201 m away

    Neighbourhood: South Riverdale

    About the area around the lot, not the lot itself.

    Nearest station
    Greenwood Station15 min walk
    Nearest TTC stop
    Greenwood Ave at Ivy Ave2 min walk
    Nearest cycling route
    Greenwood AveBike Lane, 1 min walk
    Nearest traffic count
    9,446 vehicles in 14 hGreenwood Ave / Walpole Ave, 50 m away, Feb 4, 2026
    Serious collisions within 500 m
    12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
    Parks
    The Rail Garden5 min walk
    Monarch Park6 min walk
    The Pocket6 min walk

    Schools within 1 km

    • ST PATRICK CATHOLIC SECONDARY SCHOOL English Public 7 min walk
    • ST PATRICK CATHOLIC SECONDARY SCHOOL English Separate 7 min walk
    • RODEN PUBLIC & EQUINOX HOLISTIC ALTERNATIVE English Public 9 min walk
    • BON BERGER CATHOLIC ELEMENTARY SCHOOL French Separate 10 min walk
    • RIVERDALE COLLEGIATE INSTITUTE English Public 10 min walk
    • MICHELLE-O'BONSAWIN SECONDARY SCHOOL English Public 12 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureSouth RiverdaleMedian neighbourhood
    Median household income (2020)$100,000$84,500
    Households that own their home57%54%
    Population (2021)27,81516,813
    Homes built in 1960 or before52%29%
    Homes needing major repairs7%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleSouth RiverdaleCity median
    Assault828.7636.3
    Robbery69.369.5
    Shootings3.210.5
    Auto theft217.4192.6
    Theft over $5,00088.246.1
    Break and enter264.7172.8
    Theft from vehicles349.8188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.